A10.01 Project Description:

Slides:



Advertisements
Similar presentations
Employee Council Meeting January 2012 Office of the Architect.
Advertisements

THE EXPRESSION OF A CORPORATE RENAISSANCE: (name of company)
The Franklin Care Center Addition and Renovation Franklin Lakes, New Jersey Jennifer Curley Lighting/Electrical Option Faculty Advisor: Dr. Moeck.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
A Building Area: (sf) 60,000 Cost per Square Foot: $275 Construction Cost $16.5 M Date of Substantial Completion: 2009 Location of Project: University.
 Mechanical  Electrical  Safety/Security  Video surveillance  Fire safety  Access control  Enhanced Programming  Roofing/Structural/Site Work.
Glenbard Township High School District 87 Facility Master Plan Steering Committee July 20, 2011.
Project Title Eli and Edythe Broad Art Museum Award Category Building.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
Theatre On The Square Pre-design. Analyzing Character Defining Elements.
Copyright 2004 Foreman Architects Engineers School Security From Common Sense to High Tech.
Capital Financial Plan and Physical Design Framework DRAFT Committee on Grounds and Buildings May 2010.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
BAE SYSTEMS DESIGN PROJECT: DAYLIGHTING TECHNIQUES/ AFTERNOON DE-”LIGHT” EDSGN 100 Sec. 6 Team 3: David Young, Robert Vadella, Victoria Rodriguez, Phil.
Dr. Don R. Roberts Elementary School Little Rock, Arkansas New Construction Project of Distinction Wittenberg, Delony & Davidson Architects 2011 Exhibition.
Technical Assignment 3 UCSB Student Resource Building Schematic Design Report Clement Fung Advisor: Dr. Mistrick.
Peachtree Charter Middle School Dunwoody, Georgia Project of Distinction – New Construction Middle/Junior High School Cooper Carry, Inc Exhibition.
B.E.S.T. Academy Ruben L. Barkley MEDT 6461 Summer 2008 Media Center Floor Plan.
A Long Term Solution Oak Ridge Addition. NPD117’ s Core Values Visionary Leadership Learning-Center Education Organizational and Personal Learning Managing.
NEW HIGH SCHOOL BACKGROUND In March of 2000, the Milan community voters passed a $49,915,000 bond issue. The bond provided dollars for a new high school;
Chapter 9 Exterior Design Factors. 2 Links for Chapter 9 Site Considerations Design Basics The Design Process.
MONTGOMERY HIGH SCHOOL MODERNIZATION & NEW CONSTRUCTION
C APITAL I MPROVEMENT PROGRAM FY 2015/16 – FY 2020/21 August 14, 2014.
School district April 2013 Vision117 Community Presentation PHASE II Vision117.com school district.
1.  Bond timeline review  Fammatre 3 Classrooms update  Solar Project update  Steindorf Project update –  Lease opportunity at DO Workshop 2.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
East Ridge Middle School Clermont, Florida New Construction Project Project of Distinction SchenkelShultz Architecture 2008 Exhibition of School Planning.
Hillside Elementary School New Richmond, Wisconsin Elementary School Project of Distinction – New construction ATS&R Planners/Architects/Engineers 2009.
École secondaire catholique Jean-Robert-Gauthier - Phase II Ottawa, Ontario, Canada New Construction Project of Distinction Edward J. Cuhaci and Associates.
Osseo Adult Education Center Brooklyn Center, Minnesota Other: Adult Education Project of Distinction – New construction ATS&R Planners/Architects/Engineers.
Eastgate Elementary School Bellevue, Washington Elementary School Project of Distinction – New Construction NAC|Architecture 2010 Exhibition of School.
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
Little Cedars Elementary School Snohomish, Washington Elementary School Project of Distinction – New Construction NAC|Architecture 2008 Exhibition of School.
Westside Elementary School
Eastern Guilford High School Guilford County, NC New Construction Project of Distinction SFL+A Architects 2009 Exhibition of School Planning and Architecture.
Los Angeles County High School for the Arts Los Angeles, CA Design Concept Award HMC Architects 2008 Exhibition of School Planning and Architecture.
Fabyan Elementary School
Desert Torah Academy Las Vegas, NV Design Concept Entry Projects Under Construction Award TMP Architecture in association with Perlman Design Group 2008.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Columbus Signature Academy New Tech Campus – Phase 1 Columbus, Indiana Lee J. Brockway Award Renovations High School CSO Architects 2009 Exhibition of.
7 Planning the Living Area Chapter. Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Identify the three.
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2011 Exhibition of School Planning and Architecture.
Blue Springs High School Blue Springs, MO Project in the Design Phase Design Concept Award Hollis + Miller Architects 2009 Exhibition of School Planning.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Wahoo Public School District Facility Planning Update April 18, 2016.
Issaquah High School Issaquah, Washington High School Design Concept Award Mahlum Architects 2008 Exhibition of School Planning and Architecture.
White Pigeon Community Schools
April 2016 Bond / Facilities Update Presentation
Community Forum 2017 Project Overview UNIVERSITY OF UTAH.
Cambrian School District March 19, 2015
Community Meeting, July 18, 2016 Update Designs and Phasing
2006 Facilities Master Plan Update Cañada College
Silver Lake Regional High School
Campus Construction Projects
Facilities Update November 17, 2017
Glacier View Junior High
21st Century School Buildings Plan
MIRACOSTA COMMUNITY COLLEGE DISTRICT
A10.01 Project Description:
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
UNION GROVE ELEMENTARY REFERENDUM
Foster School Expansion Project
Mary Queen of Apostles Facilities Master Plan Update
Located at Tufts University in Boston, Massachusitts
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Recap of the Facility Assessment
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

A10.01 Project Description: Shortly after completing an addition to its existing cafeteria, this private school realized it needed a complete review of the campus it shared with its adjacent church as well as an assessment of its facilities if it was to meet the educational demands of the children of its parish into the future. Our firm was engaged to perform these duties as well as provide complete programming and architectural services for phase 1 of the resulting master plan. After meeting with school administrators, parents, and church officials a plan was developed that envisioned new administrative offices, media center, and technology classrooms; renovated science centers, gymnasium, and student centers; and a complete technology and security upgrade. These facilities are designed to provide the type and quality of academic areas required for the school’s pre-K thru 8th grade technology-rich curriculum as well as a reinvigorated identity within the parish and to the larger community. These renovated and expanded academic, artistic, and athletic facilities provide the much needed tools for faculty and staff to adequately prepare the parish's children for success in high school, and beyond. Building Area: 6,700 SF Cost per Square Foot: $209 Construction Cost: $1.4 million Date of Completion: August 2012

A10.02 The first phase of this masterplan focuses on providing a technology and experientially rich environment for current -and future- students. Partial Site Plan: The original campus is composed of typical 1950’s architectural modern movement school design. Bird’s Eye View: Illustrates how the new Administration Building is forward-looking yet appropriately scaled, and meshes into the existing campus architecture providing a distinct “front door” to the campus.

A10.03 The new administrative building and media center is a contemporary reinterpretation of 1950’s architecture. Careful attention was given to mullion spacing and use of materials such as brick veneer, aluminum curtain wall framing, and energy efficient glazing. The new administrative building and media center enhances the experience of faculty, students, and campus guests.

A10.04 Evaluation of solar angles combined with expansive glazing allows natural light to enter the space, minimizing the need for interior artificial lighting. Use of louvers control & filter daylight. Using glass walls also engages the outdoors and simplifies way-finding.

A10.05 The building is flexible in terms of both the mulit-use (religious, educational, athletic) campus and its residential context. The design is focused on updated administrative spaces and visitor/student arrival sequence, providing new vehicular and pedestrian circulation patterns that are both intuitive and secure.

A10.06 The design utilizes spatial relationships to provide a media center/school community space that addressed the public and yielded much needed “light-and-airy” gathering space to the existing dark and enclosed environment. (Upper photos: before conditions) Substantial spans of windows allow natural light to filter in, reducing eye strain while reading. Daylight is controlled and filtered by exterior louvers. Direct/indirect lighting supplements the daylighting with individual light level control to balance the illumination.

A10.07 The Media Center, a hub for educational exercises, private study, and community meetings, includes punches of the school’s accent color to add visual interest to a more subdued space, designed to accommodate large groups or quiet individual reading. Modular carpet and elements accentuated in school colors give a sense of school’s pride!

A10.08 Technology Classrooms feature a combination of “smart boards” and projection systems for interactive learning. Ultimately, this new building design and masterplan is about providing wonderful spaces where kids would not only learn, but enjoy doing so!