Riverwalk Park – 8/23/17 Preferred Riverwalk Park Concept Plan

Slides:



Advertisements
Similar presentations
Neighborhood Meeting No.2 Golden Gate Bridge, Highway and Transportation Districts San Francisco Mid-Day Bus Parking Facility Contract No BT-1 March.
Advertisements

WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: August 5 th, 2013 – August 9 th, 2013.
Progress and Status COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE.
STEFFIAN BRADLEY ARCHITECTS – BRIERLEY HILL PLANNING PRESENTATION.
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Route 27 / Route 244 Bridge Design Aesthetic Considerations VDOT Project Number: V01, PE 101 June 28,
Introduction Who we are - Team Intro Riverwalk part of overall revitalization of downtown area.
Permeable Pavements Shingle Creek Watershed Management Commission May 31, 2011.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Before : Inadequate gateway point along Highway 100 No Sense.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
DRAFT Madison Valley Stormwater Project Phase 2 Seattle Design Commission June 4, 2009 Seattle City Hall Boards and Commissions Room, L2-80.
Florida Department of Transportation, November 2009
Town Core Streetscape and Accessibility Design Study  Elabd Architectural Illustration  Kathleen Ryan, Landscape Architect, ASLA Questions for Milton.
Walking and cycling routes Local facilities Streets Open space Public transport Supporting infrastructure Creating ‘commons’ Local planning.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
BETHEL HEIGHTS. INTRODUCTION  Bethel Heights is located at Kammanahalli.  Approved by BBMP  Project occupied area is 11,000 Sft  24 units + Pent house.
Extension of the Riverwalk Dylan Brown, Connor Hughes, Steve Deeb, & James Riel.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Project 3 DS 413: Design Studio 413 May 9, 2010.
Request for Waiver from Accessibility Requirements of Chapter 553, Florida Statutes Picerne Storage Building Annex.
Why Pier 23 Florida Trend magazine recently listed Santa Rosa county as the second fastest growing county in Florida. Pier 23 is located within a real.
Manual on Uniform Traffic Control Devices Aren Cambre
Lesson 13: Walkways, Sidewalks, and Public Space.
MASTER PLAN FEBRUARY 15,2012.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
RANCHO PALOS VERDES WELCOME Vision Plan and Public Use Master Plan Visioning Workshop June 3 rd, 2006.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Prison Manage to see through outside but cannot reach. The feeling of trap. Old Jetty Bigger shelter covers the path way. Therefore, the path way is protected.
America Walks Assessing the Path of Travel: Considerations and Effects on Older Adults and Persons with Cognitive Disabilities.
Design Standards in Saint Paul Proposed Design Standards Zoning Amendments December 16, 2009 Department of Safety & Inspections / Department of Planning.
DICK RUDDELL EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________.
SAFE ROUTES TO SCHOOL: INFRASTRUCTURE DESIGN TO CONSTRUCTION.
City of Ottawa Update to Accessibility Design Standards (ADS) Second Edition released November 2015 Jo-anne Moore, P.Eng. Senior Engineer, Guidelines and.
Ingress and Egress The means of entering and leaving the site Regulated by state and local governments Width Slope Drive radius Pavement composition Encroachment.
Water Quality Demonstration & Educational Program for Main Street Little Rock.
PBL: OUTDOOR LEARNING SPACE Level 3.  What features are necessary for an outdoor learning space?  How does weathering impact design choices?  What.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
Request for Approval of Temporary Rule Changes to 15A NCAC 02H.1002 Presentation to NC Environmental Management Commission March 13, 2014.
LANDSCAPE ELEMENTS Miss Tonnessen. Objectives of the Day  Think-Pair-Share  Other than plants, what are some things that go into a landscape design?
May 2010 Photo provided by the Trust for the National Mall U.S. Commission of Fine Arts Concept Review.
What are Complete Streets?. Complete Streets place an emphasis on alternative modes of transportation being incorporated into the streetscape and design.
Maintenance and Temporary Traffic Control
September 2015 FOG STUD I0. Agenda Project Overview Building Improvements Existing Conditions Survey Restroom Accessibility Electrical and Lighting Wood.
City of Prairie Village 75 th Street Mission Road to State Line Road.
Parking Lot Design Civil Engineering and Architecture
Learning Center Concept. Nature Preserve SITE PLAN CONCEPT 1,800 linear feet of wood boardwalk trails, 7 activity areas ` Activity Pad Learning Center.
Accessible Environment
ELCITA UPDATE February 2017.
Wild Dunes Luxury Price Reduced!
Old world craftsmanship... timeless beauty.
RIVERFRONT TRAILS CLOSED
Parking Lot Design.
Marina Vista Streetscape Project
Beautiful Elevated Home in The Preserve at Legend Oaks
Amazing Natural Light & Great Outdoor Living
Looking the Best Decorative Concrete Stamps
Parking Lot Design Civil Engineering and Architecture
Drive-In Site Utilization Committee
THE PROPOSED EXHIBITION CENTRE PERADENIYA UNIVERSITY
Current Scenario in the city Infrastructure :
PREPARED BY: JOSHIMA V.M., UNIVERSITY OF NIZWA
Low-Impact Development
Pic2school PLAYFUL SURFACES PLAYFUL THINGS NATURE AND GREENERY
Accessible shared streets
Pacific Flyway Center Open Space Preserve and Interpretative Educational Facility Applicant: The Pacific Flyway Fund LLC.
Milton Green Street Milton Green Street Ramps and pedestrian walkway
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
1. Coach and car park spaces available in the car park opposite the entrance to the Castle. Toilet facilities are available here cost 20p coin .
Fort Walton Beach Landing Master Plan
Finance and Performance Committee
RAIN GARDEN INSTALLATION
Presentation transcript:

Riverwalk Park – 8/23/17 Preferred Riverwalk Park Concept Plan Materials List Distribute to BETA for Cost Estimating

Riverwalk Park – Concept Plan

Optional Pavement and Parking Options Pervious Pavement Porous Pavers

Pedestrian Crossings Elevated Walkway in Parking Pedestrian Beacon Pedestrian Signal at Route 28

Pathway Options Permeable Pavement Porous Concrete Crushed Schist Moby Mat Dense Graded Crushed Stone

Curbing/Curb Stops Granite Curbing Curb Stops Concrete Curbing

Riverwalk Park – Close-Up

Traditional Restrooms

Portable Toilets Enclosure – Dennis Pond

Lighting/ Other Amenities Bigbelly solar trash/recycling Entrance Gate Decorative Lighting

Pavilion and Shade Structures/Seating

Public Art Displays

Interactive & Natural Playscapes

Kayak Options Vendor Trailer Lease storage space

Interpretive Signage

Distribute to BETA for Photo-Representation Boardwalk – 8/23/17 Boardwalk Alignments Materials List Distribute to BETA for Photo-Representation

Option 1

Option 2

Option 3

Raised Boardwalk Elevation Elevation Section

Boardwalk Decking Materials Donation naming Grating at a corner bump-out IPE – Brazilian Hardwood

Cable Railing Wood post and top rail Stainless steel or aluminum post and top rail

Trail/Path/Walkway Crushed stone path through woodland and landscape restoration areas

Low Profile Boardwalk Section Alternate to crushed stone path-Considers raising sea level. No railing required. Higher Cost. Elevation

Boardwalk Overlooks Interpretation, Rest and Shade Extension bump-out