MARS15 Simulation of Radiation Environment at the ESS Linac

Slides:



Advertisements
Similar presentations
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Advertisements

1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, Neutrino Factory and Muon Collider Collaboration meeting Sergei.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
Shielding Studies using MARS Monte Carlo code Noriaki Nakao (SLAC) Jan. 6, 2005, WORKSHOP Machine-Detector Interface at ILC, SLAC.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Shielding calculation for ESS accelerator Lali Tchelidze TAC meeting April 2, 2014.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
MCTF C. Johnstone MUTAC Meeting 8-10 April Debut of the MTA beamline Description, status and commissioning plans.
The PLANETOCOSMICS Geant4 application L. Desorgher Physikalisches Institut, University of Bern.
The Status of ESS Accelerator Shielding and Accident Scenarios Lali Tchelidze May 26, 2014.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
Radiation safety evaluation for “KAMABOKO” Main Linac Tunnel KEK-APL : T.Sanami, S.Ban KEK-ACC : A.Enomoto, M.Miyahara ILC Mechanical & Electrical Review.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
R. Miyamoto, Beam Loss and Collimation in the ESS Linac, HB Beam Loss and Collimation in the ESS Linac Ryoichi Miyamoto (ESS) B. Cheymol, H. Danared,
Managed by UT-Battelle for the Department of Energy Residual Does Rate Analyses for the SNS Accelerator Facility I. Popova, J. Galambos HB2008 August 25-29,
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Applications of Monte Carlo Code for a Gamma Resonance System Analysis L. Wielopolski, A. Hanson, I. Dioszegi, M. Todosow, Brookhaven National Laboratory,
Beam test possibilities at JINR and Fermilab V. Pronskikh Fermilab 02/15/2012.
Experimental Studies of Spatial Distributions of Neutrons Produced by Set-ups with Thick Lead Target Irradiated by Relativistic Protons Vladimír Wagner.
MARS15 RESULTS FOR THE LBNE-BLIP IRRADIATION TEST LBNE-BLIP Irradiation Test Meeting Fermilab February 19, 2010 Nikolai Mokhov FermilabAccelerator Physics.
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
Stefania Trovati EPFL - CERN S. Trovati - SATIF 101.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
1 Neutron Effective Dose calculation behind Concrete Shielding of Charge Particle Accelerators with Energy up to 100 MeV V. E Aleinikov, L. G. Beskrovnaja,
Radiation Shielding Assessment for MuCool Experimental Enclosure C. Johnstone 1), I. Rakhno 2) 1) Fermi National Accelerator Laboratory, Batavia, Illinois.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
BOOSTER COLLIMATION AND SHIELDING Proton Source Workshop Fermilab December 7-8, 2010 Nikolai Mokhov Fermilab Accelerator Physics Center.
Summary of radiation shielding studies for MTA Muon production at the MiniBooNE target Igor Rakhno August 24, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop R. Casey Activation Issues for NSLS-II March 28, 2007.
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
Dark Current in ILC Main Linac N.Solyak, A.Sukhanov, I.Tropin ALCW2015, Apr.23, 2015, KEK LCWS'15, Tsukuba, 04/2015Nikolay Solyak1.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Prompt dose upstream the 12-ft concrete shielding blocks Igor Rakhno May 4, 2007.
Radiation studies for the MI collimation system and ILC vertical cryostat test area December 13, 2006 Igor Rakhno Accelerator Physics Department.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
MARS15 Developments Related to Beam- Induced Effects in Targets N. Mokhov, V. Pronskikh, I Rakhno, S. Striganov and I. Tropin (Fermilab) 6 th High-Power.
Halo Collimation of Protons and Heavy Ions in SIS-100.
Activation by Heavy-Ion Beams
Dark Current and Radiation Shielding Studies for the ILC Main Linac
Background simulations: update and simulations of absorbed dose
Heating and radiological
Induced-activity experiment:
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
Collimation Concept for Beam Halo Losses in SIS 100
Analyses to Support Waste Disposition of SNS Inner Reflector Plug
Radiation protection of Linac4 M. Silari Radiation Protection Group
GAMOS tutorial Shielding Exercises
Update on GEp GEM Background Rates
1- Short pulse neutron source
Implications of HOMs on Beam Dynamics at ESS
Beam-Induced Energy Deposition Studies in IR Magnets
Andreas Jansson, Lali Tchelidze
Update on Dark current generation in ILC Main Linac
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
Higgs Factory Backgrounds
GEANT Simulations and Track Reconstruction
Performed experiments Nuclotron – set up ENERGY PLUS TRANSMUTATION
Dark current in TESLA linac
Operations Section Leader
Background Simulations at Fermilab
Radiation fields During 1st stage beam commissioning
Review of Quench Limits
CEPC Radiation and Shielding
Presentation transcript:

MARS15 Simulation of Radiation Environment at the ESS Linac N. Mokhov, Yu. Eidelman, I. Rakhno, L. Tchelidze and I. Tropin SATIF-13 October 10-12, 2016

Outline Introduction ESS MARS Model Beam Loss Model Electromagnetic Fields and Acceleration Normal Operation Impact on Environment Beam Accident Conclusions SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Introduction The ESS accelerator complex is under construction in Lund, Sweden. It will deliver a 5-MW, 2-GeV proton beam for the European Spallation Source facility. Comprehensive MARS15 studies were performed to evaluate prompt and residual radiation levels induced by nominal and accidental beam losses in the ESS Linac and beam transfer lines to provide a basis for radiation shielding design verification through the accelerator complex. SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

ESS MARS15 Model Included in the MARS15 model is the newest information – based on the engineering design - on beam-line components such as quadrupole magnets, accelerating cavities and cryomodules as well as as-built Linac tunnel and shielding layout with all the details available on geometry, materials and electromagnetic fields. This info from the ESS CAD teams was obtained in the form of STEP files and semi-automatically converted to the MARS15 ROOT geometry modules. The element sequence was built and the entire Linac structure managed and linked to the above geometry modules and to materials/field maps by means of the advanced Beamline Builder. SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

MARS15 (2016) in this Study Customized steppers (with high-order Runge Kutta algorithms) were created for optimal particle tracking in SRF, quadrupole/dipole magnets and thick shielding. For inelastic nuclear interactions, a combination of LAQGSM and CEM event generators is used at 0.15 – 2 GeV, extended TENDL-based generators below 0.15 GeV down to 1 MeV (charged particles) and 14 MeV (neutrons), and MCNP libraries for neutrons below 14 MeV. Energy thresholds are in the 0.001 eV to 100 keV range. Variance reduction techniques: multi-step and splitting/Russian roulette. A built-in set of flux-to-dose (FTD) conversion factors to calculate - in the course of Monte-Carlo - effective prompt dose distributions: ICRP103 + ICRP60 + Cossairt (2009) + Pellicioni (2000). These FTD are in a rather good agreement with ESS-0019931. SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Beam Loss Model 1 W/m beam loss rate – uniform longitudinally and on beampipe aperture at 3mrad grazing angle in beam reference system - was considered as a design criteria and an upper limit during normal operations. This was derived from hands-on maintenance conditions as adopted at ESS. SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

ESS in MARS15 Model Side view Plan view Tunnel x-section ESS specific description of 32 materials is used in the model SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Stubs, Exits and Cable Penetrations in the Model Stubs and sand-bag filling Cable penetrations Personnel emergency exit SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

SRF Cavities and Magnets in MARS15 Model ESS CAD STEP files MARS ROOT geometry Field maps & analytics for Ez Spoke cavity (composite shapes) High-b cavity High-b cavity Quad Dipole SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Acceleration: E-Kick & Deflection Model (KDM) Kick in kinetic energy : where T is the transit factor: Momenta of particle (i/f – before/after kick): From conservation of the transverse momentum : The amplitude (voltage) E0 and phase f0 for each cavity vs its number (position) in the Linac were provided by ESS SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

KDM vs ASTRA Verification Acceleration Spoke Medium-b High-b Tracking Spoke Medium-b High-b SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Acceleration & Tracking: Consistency Check Vertical Horizontal DTL DTL Spoke Spoke Vertical: Spoke to Target Horizontal: Spoke to Target SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Normal Operation: Prompt Dose Maxima at top of berm: 0.65 mSv/hr (z~400 m) 0.86 mSv/hr (z~540 m) 0.63 mSv/hr (z~400 m) 0.85 mSv/hr (z~540 m) Total Neutrons Vertical scan through the beamline center SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Normal Operation: Prompt Dose at Linac End Total Neutrons XY-view at z=483.5 m, Ep=2 GeV SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Prompt Dose in ESS Associated Systems Dose in HEBT loading bay at 7 locations indicated Prompt dose distributions for 1 W/m beam loss normal operation were calculated on the berm, in klystron gallery and stubs (with and w/o filler), at emergency exits, in HEBT loading bay, A2T-GSA penetration, HVAC exhaust pipes, alignment penetrations, and cryogenic transfer line SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Linac Component Activation Residual dose on the outer surface of magnets – after 100 days of irradiation and 4 hours of cooldown – ranges from 0.3 to 1 mSv/hr, in a full consistency with the 1 W/m rule. At the same conditions, the maximum contact dose on the concrete walls is 0.01 mSv/hr Hottest quad at 354.6 m First dipole magnet at 484.8 m SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Environmental Impact of ESS Normal Operation MARS15 calculated source terms for dose on the berm, skyshine and soil/groundwater activation studies The source terms files T, B, L and R with NI, jj, E, W, x, y, z, dcx, dcy, dcz where NI is history number (irrelevant here); jj is particle ID: 1 (p), 2 (n), 3 (p+), 4 (p-), 5 (K+), 6 (K-), 7 (m+), 8 (m-), 9 (g), 10 (e-), 11(e+), others are various fragments; E is particle kinetic energy, GeV; W is statistical weight; x, y, z are coordinates in cm, and dcx, dcy, dcz are direction cosines. SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Prompt Dose and Energy Spectra from T-file Entering soil just above tunnel ceiling <En> = 18.6 MeV <Ep> = 163 MeV <Eg> = 13.6 MeV <Ee> = 51 MeV SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Tunnel Air Activation at Normal Operation MARS15 calculated nuclide production per sec in air of ESS tunnel 0 < s < 600 m for steady-state beam loss rate of 1 W/m: Total, produced in low-energy (E < 14 MeV) and high-energy (E > 14 MeV) nuclear reactions Isotope Total Low-E High-E H 3 1.94E+09 4.56E+08 1.48E+09 Be 7 7.79E+08 0.00E+00 10 4.71E+08 C 11 1.22E+09 14 1.53E+11 1.52E+11 8.49E+08 N 13 1.91E+09 4.47E+07 1.86E+09 O 1.62E+08 15 1.74E+09 5.75E+05 19 2.93E+05 F 18 6.21E+06 Ne 23 7.07E+05 24 1.54E+05 Na 22 2.02E+06 3.19E+06 25 1.26E+06 Mg 27 1.86E+06 28 6.25E+05 Al 26 2.75E+06 6.98E+06 Al 29 3.56E+06 0.00E+00 Si 31 3.98E+06 5.04E+00 32 2.31E+06 P 30 2.03E+06 3.07E+07 33 2.21E+07 35 2.46E+06 S 2.94E+07 1.75E+04 37 8.54E+06 3.54E+06 5.00E+06 38 5.29E+06 6.39E+00 Cl 34 1.32E+06 36 7.54E+07 1.54E+06 7.39E+07 4.91E+07 2.29E+04 39 8.72E+07 1.06E+06 8.61E+07 40 9.60E+06 2.12E+06 7.48E+06 Ar 8.05E+07 2.36E+07 5.69E+07 3.05E+08 9.83E+07 2.06E+08 41 9.05E+08 K 1.63E+06 6.63E+06 SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Direct & Skyshine Radiation Direct on berm On berm 10×10 km atmosphere with the air density gradually decreased with height according to the NASA Earth Atmosphere Model SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Skyshine: Dose Isocontours at Different Heights Just above the berm Side view SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Worst Case Accidental Beam Loss The consideration is given to the impact on radiation environment of the accidental point loss of the full beam. The primary concern is the corresponding peak prompt dose rate on top of the berm and in the hottest point in klystron gallery. A preliminary MARS15 analysis has shown that the worst case corresponds to a 2 GeV beam lost downstream of the high-beta linac at z ~ 447 meters just upstream of the quadrupole magnet quad-475 in front of the stub mouth. That is for the point beam hitting the beam pipe at a grazing angle of 3 mrad towards vertically up. There is a 2-fold increase in the dose rate for the worst stub if the loss point is in a horizontal plane towards the stub. The rate of 2 GeV protons that corresponds to the full 5 MW beam is 1.5625×1016 p/s. SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Prompt Dose for the Worst Case Beam Accident Beam loss at 3 mrad horizontally towards the stub Beam loss at 3 mrad vertically up Maximum at klystron gallery entrance: 20 mSv/hr compared to 1.2 mSv/hr for steady- state normal operation, both with filler in the stub Maximum at berm: 60 mSv/hr compared to 0.65 mSv/hr for steady-state normal operation. Peak in the hottest quad coil 20 W/cm3 SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS

Conclusions Comprehensive study of the ESS radiation environment was performed with the MARS15 model based on the latest engineering design including SRF, quads and dipoles as well as as-built Linac tunnel and shielding layout with all the details available on geometry, materials and electromagnetic fields. Prompt dose distributions were calculated in the tunnel and its surroundings for both normal operation and worst-case beam accident. At normal conditions, the dose rates on the berm and in all the accessible associated systems – with a couple exceptions (e.g., emergency exit #4) - do not exceed 1 mSv/hr. Skyshine: Dose isocontours were calculated over the ESS site. Residual dose rates in the tunnel were calculated as well, with source terms on the tunnel wall outside generated for subsequent soil and groundwater activation analyses. Results obtained for the full beam loss accident can help derive regulatory limits on allowable duration of the accident and on specifications for corresponding beam instrumentation and control systems. SATIF-13, Dresden, Oct. 10-12, 2016 N. Mokhov et al.: ESS