WIND TOWERS. BIG PICTURE

Slides:



Advertisements
Similar presentations
VALMONT WIND ENERGY, INC. MODULAR TOWER SYSTEMS. Presentation Overview Bigger Machines Modular Tower Systems (MTS) Transportation Restrictions Flexible.
Advertisements

Offshore Wind 2004 From Vindeby to Nysted A Manufacturer’s Experience Henrik Stiesdal Bonus Energy A/S.
Energy & Its Impact on Global Society Jerome K. Williams, Ph.D. Saint Leo University Dept. Mathematics & Sciences.
Wind Turbine Towers for Greater Hub Heights Why higher wind turbine tower can contribute to increase energy output? Energy output is proportional to the.
Santiago Arias Gemasolar: the 24 h solar operation.
© Siemens AG 2011 Hull Offshore Wind Workshop Siemens Wind Power A/S, Thomas Mousten, Offshore Wind Americas.
October 30, 2007 © SKF Group Slide 0. Why is there no ideal bearing concept EWEC 2012 Presented by Reiner Wagner, Application Engineering Manager Renewable.
Advantages of Lattice Towers
Longyuan Mulilo De Aar 2 WEF MW Onshore Wind Energy Facility
Lecture 21 Chapter 12 Wind Energy. Outline History of wind power –Grinding wheat –Pumping water –Generating electricity Wind power for electricity –Fundamental.
Deep Water Offshore Wind Energy By Paul D. Sclavounos Horns Rev Wind Farm (Denmark) - Rated Power 160 MW – Water Depth 10-15m.
By Misfer Almarri.  Have the main rotor shaft and electrical generator at the top of a tower, and must be pointed into the windrotor  Small turbines.
1 Adviser : Dr. Yuan-Kang Wu Student : Ti-Chun Yeh Date : A review of wind energy technologies.
IOWA STATE UNIVERSITY Department of Civil, Construction and Environmental Engineering Cost Estimate for Different Wind Turbine Technologies Bin Cai Wind.
EMERGING CEE WIND TURBINE AND COMPONENT SUPPLY CHAIN PROSPECTS – EUROPEAN AND GLOBAL PERSPECTIVE BY: MIKE HANNON CONSULTANT & PARTNER MHM PARTNERSHIP.
Power from the wind. Sailcloth turbines for water pumping, Lasithi plateau, Crete.
1 IPEK energy GmbH Development and Implementation of a Wind Farm 3rd International Conference on Alternative Energy & Power ICAEP 28 March 2009.
Off-Shore Wind Energy Technologies
Group N Chris Jones Ella Feekins Nikoline Hong
Alstom Wind Madrid, 20 th May 2010 Félix Urrea, VP Operations EMEA.
WIND POWER. Introduction  Energy is a major input for overall socio- economic development of any society  The prices of the fossil fuels steeply increasing.
Small Wind Turbines Innovation opportunities via small wind turbine testing Daniel Feszty Associate Professor Department of Mechanical and Aerospace Engineering.
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
Prof. R. Shanthini 02 Feb 2013 Module 06 Renewable Energy (RE) Technologies & Impacts (continued) - Use of RE sources in electricity generation, in transport,
Supply Opportunities in Canada’s Wind Energy Market Stephen Rach CanWEA Toronto, Ontario October 6, 2010.
Nick Mellon. What is it? Wind energy is generated using big turbines that are on top of huge poles. They work like a household fan does, but there is.
AFTHAP m Luis A. Agudo Fernández AFTHAP CONFERENCE REINFORCED AND PRESTRESSED CONCRETE PIPE, STEEL CYLINDER TYPE Module 4: Significant.
Wind turbines are used to provide a great source of clean and renewable energy for your home or business.
 Large Blade Testing Facility LARGE WIND TURBINES Rahul Yarala Executive Director, Wind Technology Testing Center May 12, 2011.
DOE Peer Review May 10, 2006 Golden, CO Walt Musial Leader-Offshore Projects National Renewable Energy Laboratory Offshore Wind.
SUPPLY CHAIN EVENT GLENOUTHER RENEWABLE ENERGY PARK FENWICK HOTEL, 10 TH SEPT 2015.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Wind Turbine Design Methods
Wind, Wind Power and Vestas Implementation of Wind Power.
Wind Energy: Technology, Markets, and Economics ECO 680 Dr. Gomis Porqueras.
Trends in the global wind energy market Rüsselsheim, Stefan Schilling
Nordex high yield wind turbines for all wind regimes
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
GROUPAMA Football Stadium, Budapest Design and other engineering work for the precast concrete structure Precast solution of the structure (splitting.
An Overview of the Technology and Economics of Offshore Wind Farms
Established in 1955 in Dunaújváros Produce m3 of concrete per year.
SHP – Columbia University
MULTICLIENT : SUPPLIER OPPORTUNITIES AT EUROPEAN WIND TURBINE PRODUCERS WIND TURBINE SEMICONDUCTOR EMS & CABLE TOWERS CONSTRUCTIONBLADES BEARINGS.
Bartosz Turek.  History of Wind Power  The Trend for the Future  Types of Turbines  Pros and Cons of Wind Power  Intermittency  Storage Options.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Tube well pump using wind power Nishan Madushanka HND/CV/03/12.
07/04/2013 Saint-Petersburg Danilin Aleksey Vladimirovich Patent pending
__________________________ © Cactus Moon Education, LLC. CACTUS MOON EDUCATION, LLC ENERGY FROM THE WIND WIND TECHNOLOGIES.
The Turbine Ex-55 Model 1000 KW Direct Drive No Gearbox Permanent Magnet Generator Full Convertor Hub Height:60/85 mtr Class: II B Rotor Dia:55 mtr Hot/Cold.
Life Cycle Assessment Assessing local impacts María del Mar Pintor
YEL WIND POWER PROJECT. YEL WIND POWER PROJECT.
M PARK AD Sofia.
Anatomy of Modern Wind Turbine & Wind farms -II
VERTICAL AXIS TURBINE Most of the world's energy resources are from the sun's rays hitting earth. Some of that energy has been preserved as fossil energy,
Estimation of the Optimum Wind Turbine Size for Two Different Offshore Sites and Wind Farm Rated Powers MSc. Candidate: Shajid Kairuz Fonseca Supervisor:
Parul Polytechnic Institute
Sailcloth turbines for water pumping, Lasithi plateau, Crete
Company Overview July, 2016.
Spanish Engineering Woldwide
Siemens Gamesa Renewable Energy The best technology for your wind projects in Brazil 30 August 2017 © Siemens Gamesa Renewable Energy.
Wind Energy.
An overview of wind energy 3/5/2018
Understanding Oklahoma’s Wind Energy Industry
Wind Energy!!!.
Suryoday Technologies ISO 9001:2015 Co.
The GridSolar Project Presentation – NRCM January 21, 2010
Wind Turbine Types.
Reduced Draft Spar (RDS) Floating Offshore Wind Turbines A Market Opportunity Pedro López Offshore Engineering & Ship Design
Adroit Market Research +1 (214) Single Use License: US$ 4200 Request Sample Global.
Wind Power.
Presentation transcript:

WIND TOWERS. BIG PICTURE Conference: PRECAST CONCRETE WIND TOWERS. BIG PICTURE Juan Carlos Arroyo Portero MSc Civil engineer CALTER INGENIERÍA Convenor TG 6.4 FIB: Precast concrete wind towers CERTIFICADA EN EL DISEÑO Y CÁLCULO DE PROYECTOS DE ESTRUCTURAS DE OBRA CIVIL Y EDIFICACIÓN DATOS DE CONTACTO. Valenzuela 8, Madrid, 28014. Telf: 91 319 12 00 Fax: 91 319 12 00 Email: jcarroyo@calter.es - www.calter.es

Electricity business’ Agents: Generation Transport Distribution Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Wind market Electricity business’ Agents: Generation Transport Distribution Comercialization

Developpers or Promoters of a wind farm They sell the energy Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Generation Developpers or Promoters of a wind farm They sell the energy They are the final client of a tower But they usually hire a turbine manufacturer that’s the actual client.

Generation (spanish case) Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Generation (spanish case) Energy business Iberdrola Renovables ENEL Green Power (Endesa) E. ON Renovables Other Agents as Promoters / Owners Suppliers or Turbine manufacturers GESTAMP R. GAMESA R. ACCIONA R. Construction companies

Turbine manufacturers (2015) Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Turbine manufacturers (2015)

Turbine manufacturers Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Turbine manufacturers The new 2015 lider GOLDWIND has been succeeded by SIEMENS+GAMESA 2014 lider was VESTAS 8 of 15 are chinese 99% of chinese new turbines has been installed in China Excepting China, the first 5 manufacturers sell the 75% of turbines

Mature countries / types of wind farms Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Mature countries / types of wind farms Europe Little wind farms: No more than 30 WT Between 3 and 12 WT Powerfull turbines > 3,0 MW High towers > 120,0 m Existing concrete plants near location Availability of specialized hand labour, cranes and trucks/roads

Mature countries / types of wind farms Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Mature countries / types of wind farms North of Africa and Middle East Egypt Morocco Market in evolution

Mature countries / types of wind farms Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Mature countries / types of wind farms LATAM Brasil, Mexico Big wind farms: No less than 30 WT Up to 120 WT Turbines < 3,0 MW Medium high towers 100 > 120 m Mobile concrete plants Difficulties to obtain specialized hand labor (cheap), cranes and trucks/roads

Mature countries / types of wind farms Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Mature countries / types of wind farms LATAM Complex policy of taxes Advantages in the use local hand labor Cheap hand labor Prices of raw materials fixed by the State

Mature countries / types of wind farms Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Mature countries / types of wind farms EEUU, Canada Steel towers China Huge market Exclusively local turbines and towers They are looking for european tower’s concrete technolgy to reach >120m India Huge steel market Easier penetration for foreigner companies

Mature countries Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Mature countries

Internals (Cables, Elevator, platforms, ladders) Tower Foundation Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Parts of a tower Blades (Rotor) Nacelle (Turbine) Internals (Cables, Elevator, platforms, ladders) Tower Foundation

Phases of the construction of a tower Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Phases of the construction of a tower Developper Selection of the turbine and type of tower According with Turbine Manufacturer Engineering (Loads / Certification) Prefabrication Transport Erection of Tower / Nacelle / Blades

Types of tower Material Steel Reinforced Concrete Prestessed Concrete Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Types of tower Material Steel Reinforced Concrete Prestessed Concrete

Types of tower Elevation Full material Hybrid Concrete Steel Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Types of tower Elevation Full material Concrete Steel Hybrid concrete + steel

Erection w/cranes first the lower ring Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Types of tower Process In situ Concrete Prefabricated Steel Erection w/cranes first the lower ring Erection w/jacks, frst de upper ring

The steel tower is the most usual solution Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Types of tower Steel The steel tower is the most usual solution Is the best solution up to 80-100 m TM have a catalogue of steel towers for their Turbines. TM owns the engineering solutions TM is a “metalic world” so it s difficult to introduce concrete as a good and technological solution.

In steel towers highers than 100 m: Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Types of tower Steel In steel towers highers than 100 m: Diameter has to be bigger than 3,50 m => Or special transport Or vertical joint, joined on site Or keep the diameter but increase the depth of steel that implies very difficult and expensive bending of plates

Is a competitive solution for heights bigger than 100 m. Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Types of tower Concrete Is a competitive solution for heights bigger than 100 m. Durability of concrete towers are bigger than stell without maintenance The weight and the time for erection are greater than a metallic tower

Precast solution is competitive for wind farms greater than 30. Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Types of tower Concrete Precast solution is competitive for wind farms greater than 30. Best solution in concrete is postensionned concrete Reinforced concrete tower solution wasn't succesfull (they had many probems)

Solutions for Concrete Towers Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Solutions for Concrete Towers Enercon

Max Boegl Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Max Boegl

ACCIONA Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB

Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB CALTER

Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB CALTER

Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB CALTER

Fatigue loads (Markov matrix) Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Process of design Wind Class Geometry, Clearance Diameter on top Loads Fatigue loads (Markov matrix)

Frequencies range. Campbell diagram Fatigue. Markov matrix Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Process of design Frequencies range. Campbell diagram Fatigue. Markov matrix Prestress (to control deformations, crcking and neutral axis) Horizontal joints

Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB

Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB

Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB

Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB

Certification Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Certification

Mobile plants (farm farther than 200 km) Fixed plants Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Prefabrication Mobile plants (farm farther than 200 km) Fixed plants ¡Changes of layout! 20 m pieces 50 ton 2 towers / week (aprox. 60 pieces) Space enough to storage

Prefabrication Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Prefabrication

Transport Not larger than 12 m Not wider than 3,5 m Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Transport Not larger than 12 m Not wider than 3,5 m

Erection Preassemble Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Erection Preassemble

Erection Assemble Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Erection Assemble

3 months to cast enough towers to be erected 2 towers/week Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Time 2 months to implant 3 months to cast enough towers to be erected 2 towers/week

Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB

Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB Prices

Precast concrete wind towers Juan Carlos Arroyo UPM TG 6.4 FIB

THANKS Conference: PRECAST CONCRETE WIND TOWERS. BIG PICTURE Juan Carlos Arroyo Portero MSc Civil engineer CALTER INGENIERÍA Convenor TG 6.4 FIB: Precast concrete wind towers CERTIFICADA EN EL DISEÑO Y CÁLCULO DE PROYECTOS DE ESTRUCTURAS DE OBRA CIVIL Y EDIFICACIÓN DATOS DE CONTACTO. Valenzuela 8, Madrid, 28014. Telf: 91 319 12 00 Fax: 91 319 12 00 Email: jcarroyo@calter.es - www.calter.es