Title of the Change Project

Slides:



Advertisements
Similar presentations
Allied Health Professionals with Special Interest. AHPwSI
Advertisements

Assessment and Treatment of Hazardous and Harmful Alcohol Drinkers in Ireland: A Survey of Irish Gastroenterologists Audrey Dillon, Stephen Stewart Centre.
Ideas from UK modernisation: The Improvement Partnership for Hospitals Penny Pereira Ideas from UK modernisation.
The Health Roundtable 3-3b_HRT1215-Session_MILLNER_CARRUCAN_WOOD_ADHB_NZ Orthopaedic Service Excellence – Implementing Management Operating Systems Presenter:
Bed Management Meeting More Than Just Measurement : Outcomes
A one year audit of achieving patient driven performance targets in a locally provided memory clinic Dr C Crowe, St Patrick’s Hospital, Cashel & St Michael’s.
Department of Human Services Promoting patient care through effective patient flow System wide implementation January – July 2005.
Business Intelligence Case Study Sean Downer, Manager Decision Support Royal Children’s Hospital Melbourne.
Initial Findings from Evaluation of Service Improvement Activity Dr Zoe Radnor Giovanni Bucci AtoZ Business Consultancy.
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
Delivering improvements in diagnostic services 31st March 2010.
Transforming Community Services Commissioning Information for Community Services Stakeholder Workshop 14 October 2009 Coleen Milligan – Project Manager.
Hospital Operational Standards Jennie Hall, Chief Nurse Dr Ros Given-Wilson, Medical Director Martin Wilson, Director of Delivery and Improvement.
Understanding the Patient Journey Process Mapping and Value Stream / Flow Analysis.
Whole system improvement in Forth Valley Improvement and support team meeting 15 th Jan 2009.
Improving access to CAMHS Applying LEAN within CAMHS Beverley Mack Bexley CAMHS.
Productive and Lean Improvement Initiatives Team Champions Training 26 th July, :00 – 13:00 Parkland Hospital.
21st May  Demographic & Social  Aging population  Multiple long term conditions / skills development  Health & Social Care system design  Integration.
1st phase vs. 2nd phase Eligible patients identified: 87 vs. 118 The average waiting for an Oncology OPD was 67.4 days (SD:8.3 d) vs d. (SD:10.1.
The Advanced Practitioner in Primary Care Dr Deborah Atkinson MSc BSc(hons) RN.
How Evaluation Helped an Academic Health Sciences Center Library Demonstrate its Value Presented by: Kay Chapa MPA, MSLS Kelly Gonzalez, MSIS, MBA.
On the road to success: Sustaining 18 week delivery of Cardiac Pathways Piers Young National Programme Manager 18 Weeks implementation team, Department.
Midlands DHB’s Board Development Rotorua 10th April 2017
Title of the Change Project
HSE Change Process Initiation Planning Implementation Mainstreaming
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Template for a 48”x36” poster Enabling Technologies and Processes
Title of the Change Project
Title of the Change Project
Title of the Change Project
A model for implementing health outcomes
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Preventing HCAI’s through an education programme for nurses
CLIMP Rapid Improvement Event 1: Improving the Scheduling & Vetting processes for CT, MRI & Ultrasound (Supported by Siemens Healthineers & Simpler Consulting)
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
Title of the Change Project
QIP: Intravenous Iron Service for Renal Anaemia at SaTH
Using Equity Audit in NHS Lothian
Adapted WHO Safe Surgical Checklist in Interventional Cardiology
Chapter 16 Nursing Informatics: Improving Workflow and Meaningful Use
Everyone counts: working together to tackle Delayed Transfers of Care
Achieving World-Class Cancer Outcomes A Strategy for England
Susan Shandley Educational Projects Manager
Progressing Disability Services for Children and Young People
Achieving World-Class Cancer Outcomes A Strategy for England
Delivering physical health care on a PICU following a serious adverse incident 1 year on: lessons learned and future plans.
Access and booking Productivity advice
Stockport Together Outpatients Business Case Clinical Engagement Event
Redesign of services delivers better patient outcomes and savings
How will the NHS Long Term Plan work in our community?
Advice Guidance & Proceed
Presentation transcript:

Title of the Change Project Student ID. MSc in Healthcare Management, Institute of Leadership, Royal College of Surgeons in Ireland Header line 1 Header line 2 Header line 3 The Wait Is Over – Part I Implementation of Interventions to Reduce the Electromyography Waiting List Student Number: 13119079 MSc. Healthcare Management Abstract The current waiting list to have Carpal Tunnel Syndrome (CTS) screening performed within the Department of Clinical Neurophysiology of a large university teaching hospital is 255 days. This delay in access to the service causes increased stress amongst staff and anxiety of patients as they are spending increased amounts of time in the symptomatic state and their condition can deteriorate. The aim of this organisational development project is to reduce the wait time to have CTS screening performed. The project involved the redesign of the Electromyography service’s process with demand shifted by the addition of waiting list validation and redirection of referrals inappropriately sent to the department. The new process involved the introduction of an extra clinic to increase throughput along with the application of lean methodologies to remove waste and improve the efficiency of the bottleneck. These demand and capacity measures caused a significant (35%) reduction in the wait time for CTS screening to 166 days, increased efficiency as seen by a reduction in ‘fail to attend’ rate resulting in cost savings for the organisation but also increased equity of access. This enabled a greater understanding of the service on a micro level with acknowledgment that demand and capacity variation and its management is a vital part of waiting list management along with the appropriate use of the constraint, which is the bottleneck.

Introduction & Background Organisational Impact The Wait is Over – Part I Implementation of Interventions to Reduce the Electromyography Waiting List Student Number: 13119079 MSc in Healthcare Management Introduction & Background Methodology Evaluation Objectives implemented using the guidance of the HSE change model3. 1) O’Neill J.K., Laina V. & Wilson S. (2008) Referrals between consultants. The wait to be seen in a specialist plastic surgery hand clinic. Clinical Governance: An International Journal 13(4) 261-268. 2) Meekings A. & Briault S. (2013) The “control tower” approach to optimising complex service delivery performance. Measuring Business Excellence 17(3) 15-27. 3) HSE (2008) Improving our services: A users guide to managing change in the Health Service Executive. Dublin. This OD project was introduced in the Department of Clinical Neurophysiology in a large university teaching hospital. The Electromyography (EMG) service provides diagnostic testing for neuromuscular disorders such as carpal tunnel syndrome (CTS). The current waiting time for CTS screening is 255 days. The longer a patient must wait for CTS treatment the more likely the condition can progress to motor symptoms and make treatment more onerous1 but also increased propensity of the patient failing to attend which increases costs and is inefficient.2 Departmental demand and capacity was analysed pre change (Figure 1). Figure 1 : Pre Change Demand and Capacity Figure 2: Demand Output Figure 3: Average Demand and Capacity Outputs Figure 4: Outcome Initiation Insight into the environment in which change is to occur gained using a number of tools such as PESTLE, TOWS and cultural analysis . Planning Team presented with data portraying failures in current system and this data used to create urgency of change. Appropriate influencing tactics used to gain ‘buy in’. Communication key to the understanding of everyone’s roles within change. Implementation Waiting list validated and patients who did not want test removed. Referrals vetted and redirected to appropriate organisation. Extra technologist lead clinic commenced in October 2014. Testing time analysed using t test with resources capable of adding one extra patient into one of the technologist clinics. Aims & Objectives The aim of this project is to reduce the waiting list for CTS screening using the following objectives: Demand Measures: Validate the waiting list of patients waiting longer than three months by February 2015. Redirect inappropriate referrals to appropriate organisation throughout the course of project. Capacity Measures: Introduction of an extra clinic each week, increasing capacity by 3-5 patients per week to commence on October 1st 2014. Analysis of value added time in each clinic with the addition of an extra patient per clinic to commence in January 2015 if resources permit. Organisational Impact Reduced waiting time for testing Reduced ‘failed to attend’ rate from 20% to 8% resulting in greater efficiency Increased equity of access Mainstreaming Validation office to take over validation. Continue exclusion criteria. Waiting time reduced, so continue extra clinic and extra patient until list cleared. Conclusion The key to reduction in waiting lists is to ensure that the bottlenecks are working efficiently and effectively and near maximum usage. Once the waiting list is reduced it needs to be maintained by continuous monitoring of variation in demand and capacity with flexibility in capacity to meet change in demand. Part II, once the list is cleared, will involve advanced access “one stop shop” clinic enabling continuous quality improvement. References