NGI International Liaisons Meeting

Slides:



Advertisements
Similar presentations
Anne Louise Friedrichsen, LIFE unit LIFE+ Results and lessons learned from the first application round 2007 Anne Louise Friedrichsen, European Commission.
Advertisements

Working Group on Environmental Expenditure Statistics Luxembourg, March 2015 EGSS data production and dissemination (point 3.1 of the agenda) Eurostat.
Training on occupational classifications. Name of the presentation Introduction ISCO 08 has started to be implemented in the EU countries in several social.
Eurostat Ag.no "Annex 2" supplement to Eurostat Annual Report, October 2015 Working Group on Article 64 and Article 65 of the Staff Regulations Meeting.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Engagement meeting Gergely Sipos EGI.eu 1.
Insurance Comparison Websites: EIOPA Good Practices
Communications for Brussels meeting of CERN Council 2013
NA3: User Community Support Team
15-16 November 2017 Valenciennes, Cité des Congrès
Eurojust cases involving crimes against children
Urban Audit 3 State of play
Connecting the European Grid Infrastructure to Research Communities
Working Party on Regional Statistics 1-2 October 2012
Martin Müller InRoad Coordinator InRoad
Update on the UOE 2012 data collection
Ag.no. 15 Lessons from the 2015 A65 exercise
Ag.no. 16 Supplement to Eurostat Annual Report, October 2014
Europe 2020 and European Semester Policy Update June 2017
MIWP : Deliverables for approval
User needs assessment and user profiling
Delivering electronic Natura 2000 data via Reportnet CDR
Centrally Managed Resource Allocation
Delivering electronic Natura 2000 data via Reportnet CDR
Education and Training Statistics Working Group, May 2011
Quarterly GDP at t+30 days for EU and euro area
Bovine Movements within EU/EFTA
Ag.no.16 A65 country manuals and country assessments
3C. Update of Summary of WISE electronic delivery
Report on WISE Art.8 and GIS issues
Habides update (May 2011).
MISSOC NETWORK MEETING Amsterdam, 6-7 June 2016
on Priority Substances Strategic Coordination Group
State of play of Urban Audit
Education and Training Statistics Working Group
on Priority Substances Strategic Coordination Group
Marine Strategy Framework Directive: Transposition and Implementation
Marine Strategy Framework Directive: Status of reporting
Update on legal issues Strategic Coordination Group
The ESS reference metadata standards
Reporting – Art 17 of HD and Art 12 of BD
Item 7.1 Implementation of the 2016 Adult Education Survey
Item 8.1 Implementation of the 2016 Adult Education Survey
2b. Status of WFD reporting
Programme adoptions Cohesion Policy:
Item 7.1 – Overview of 2012 UOE data collection
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
Marine Strategy Framework Directive: Status of reporting Art. 8/9/10
Introdicution to EGI.eu
Steering Committee, Eurostat, Luxembourg, 4 February 2011
Update on legal issues Strategic Coordination Group
LAMAS Working Group 7 – 8 December 2016
Education and Training Statistics Working Group Meeting 5/6 June 2012 Item 4.2 Progress report on education survey data and metadata Sylvain Jouhette.
3.6. Impact of population and housing census results on population stocks and on LFS and SILC–follow-up DSS Meeting September 2012.
Update on legal issues Strategic Co-ordination Group 7-8 May 2009
Urban Audit Results of the quality project
State of Play RBMPs and WISE reporting (9/07/10)
Income distribution: flash estimates 2016 (FE) Item 3.6 of the agenda
FISIM State of play Agenda Item 3.
Update on implementation WG F 27 April 2010 Maria Brättemark
Orestis Tsigkas ESTAT-F5
Update on legal issues Strategic Coordination Group 23 February 2010
Update on legal issues Strategic Coordination Group
Item 3 Observed consistency and revisions
Update on status of reporting and validation process
Overview of the implementation of the SEA directive
Doc.A6465/16/03 Ag.no.16 A65 country manuals
IT security assurance – 2018 and beyond Item 2 of the agenda DIME/ITDG Steering Group June 2018 Pascal JACQUES ESTAT B2/LISO.
Working Group meeting "Statistics on Living Conditions"
WP3 – Current and Future Data Collection Systems in the ESS
Review of BWD reporting for 2009 season (Item 2)
Presentation transcript:

NGI International Liaisons Meeting Summary

NGI Int’l Liaison Meeting Summary – Amsterdam Morning Introduction What is an NGI International Liaison and why do we need or want them? Establishing Virtual Project Teams Procedures, goals and outputs Supporting Systems (e.g. CRMs) NILs report to  TNA2.1N for managerial activity TNA2.6N for work on virtual projects Details to be further refined NGI Int’l Liaison Meeting Summary – Amsterdam 10 Nov 2011

Key points from Q&A (1 of 2) NGI International Liaison A Non-operations contact Knowledge of key activities and personnel throughout NGI Virtual Team Projects Short-term, targeted projects that start and finish Project ideas come from the community and notice of NGI's willingness to participate is communicated by NILs EGI.eu supports providing initial clarity to proposed idea prior to circulating to NILs only, non validity of proposal Mechanism for issues that are felt to be important from the community, which allows for effort to be recorded for that work No minimum # of participants Important only if objective of proposed work can be carried out in the stated time period Timeframe of projects = 1 month, 3, 6, etc. It can evolve, but projects are expected to start and stop NGI Int’l Liaison Meeting Summary – Amsterdam 10 Nov 2011

NGI Int’l Liaison Meeting Summary – Amsterdam Key points from Q&A (2 of 2) VT Project Life-cycle Proposal sent, NA2 revision, circulation to NILs, participation interest (or not) sent back. If project starts, weekly updates are sent via mailing list, marketing messages created periodically, final output report Customer Relationship Management (CRM) Central online tool for documenting contacts, potential users/communities, areas of interest - for benefit of all Taking best practices from industry and adopting for EGI Sales Automation (or New User Engagement) Marketing Management Identify and target its best customers (or users) and generate qualified leads (or potential communities/users) for the sales staff (or dissemination team) Customer Service and Support Tracking and management of customer services activities and support issues NGI Int’l Liaison Meeting Summary – Amsterdam 10 Nov 2011

NGI Int’l Liaison Meeting Summary – Amsterdam Virtual Team Projects Virtual Team Project Priority Participating NGIs 1 Intelligence Collection & Analysis Process A FI, UK, CH, SE, MC, HR, ES, PT, NL, LT, DE, FR, HU, SK, EGI.eu 2 Top applications and their user communities C FI, SE, ES, IL, DE, HU, SK, PL 3 ESFRI Contact List A/B FI, UK, CZ, CH, ES, NL, LT, IT, HU?, PL, EGI.eu 4 ESFRI Demonstrator / Design Study CZ, ES, NL, GR?, IT, PL 5 Application Porting How to guide FI, SE, ES?, IL, IT?, SK, PL 6 MPI within EGI CZ, MC, HR, ES, PT, IE, GR, IT?, SK 7 Assessing the adoption of Federated Identity Providers within the EGI Community CZ (Lead?), CH?, SE, IE, DE?, FR?, GR, IT? 8 EGI Community Workshops ongoing UK, MC, ES, NL, LT, HU, PL, EGI.eu 9 EGI Compendium PT?, IE, EGI.eu 10 Website content FI, UK, HR, ES, NL, LT, DE, FR, GR, IT, HU, SK? EGI.eu 11 VT project ideas from the Lithuanian LT 12 Inter NGI usage report CH, HR, ES, LT, DE, GR, IT NGI Int’l Liaison Meeting Summary – Amsterdam 10 Nov 2011

Conclusions & Next Steps Next Meetings End of January 2012 EGI.eu to come up with a meeting schedule for week of 23 January EGI Community Forum - Munich 2012 Virtual Team Projects Current ideas to be formally submitted Template to be provided Projects can take many forms Technical, non-technical, process-based, etc. You decide what is important! Start to submit your ideas NGI Int’l Liaison Meeting Summary – Amsterdam 10 Nov 2011