February 11, 2015 Syllabus Important Dates Oral 3 Attorney Troy Prince.

Slides:



Advertisements
Similar presentations
A method for addressing any large problem. Carefully consider the problem. Define the problem. Ask yourself the following questions: What is it that I.
Advertisements

University of Connecticut 1 MECHANICAL ENGINEERING ME4973 Intro.
IENG 471 Facilities Planning
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
EDGE™ Preparing a Poster for a Publication and Display Prepared by Edward Hensel (ME) Elizabeth DeBartolo (ME) Copyright © 2005 Rochester Institute of.
10 Aug 2010 ECE/BENG-493 SENIOR ADVANCED DESIGN PROJECT Meeting #3.
POSTER TITLE – this is Calibri 96 point Author(’s) Name(’s) Here – 44 point Your Major, Department Name, Honors College Abstract Introduction You can type.
What is Comedy Presentation GROUP PRESENTATION. What You Will Need  Your outline is an individual grade.  Power Point slide (no more than 10 slides)
Title Page Include title of proposal, name of PI, and names of team members. You may include pictures, logos, and figures in your presentation as appropriate.
Design Report – Fall Semester. Title Page List name of project and team number List date List team members, advisor, sponsor Team logos.
Dream Team Project – Merchandise Design
Managing Projects to Achieve Desired Results
Oral 3 reports Feb 26, Mar 3, 5 – Oak Hall 101, UTEB 150
March 9, Days to Demo Day Syllabus Oral 3 feedback
Session 22 & 23 Dr. Dan C. Surber, ESEP
April 3, 2017 Syllabus Oral 4 Schedule Action Photos Dr. Bryan Weber.
Grand Canyon Deep Dive 3/29/12
February 28 Assignments HW #8, 9, and 10 assigned Implementation plan
March 20, 2017 Lab Update Job Opportunities
Graduate Projects Meeting February 10, 2017 Agenda
November 7, 2016 Syllabus ASME Articles Theory Feedback Assessment.
January 18, 2017 Bryan Weber Career Fairs Fall Semester Summary
March 27, 2017 AIAA Lecture – Tuesday Night Job Opportunity Syllabus
Sci/SS PLT Time – Focus! 12/9 Friday
April 20, 2015 – 11 Days to Demo Day Syllabus Tom Status
Solar System Brochure Project Examples
Casey’s Binder ©
Oral 2 Format Slide 1 Title Slide –Project Title
November 28, 2016 Syllabus Leadership Values Assessment Feedback
October 17, 2016 Syllabus Training Tutorials Oral 1 Feedback
March 23, Days to Demo Day Syllabus
Software Engineering B.Tech Ii csE Sem-II
December 2, 2013 Important Dates Schedule Oral Peer Grading
April 17, 2017 Syllabus Oral 4 Feedback Demo Day
January 23, 2017 Tom Mealy Net Working Important Dates Syllabus CDR.
Monday Oct 1 Syllabus Job Opportunities Hardware Ordering Process
FINAL PRESENTATION AND PAPER
Team member1 Team member2 Team member3 Team member4 November 2018
Monday 9/25 Syllabus Google Form, Joint Projects Ansys Training
This is where you should put the title of your poster
COMPANY LOGOS PROJECT.
Elementary ePortfolio (Journal) Guide
ENGLISH RESEARCH PAPER
This is where you should put the title of your poster
Mrs. Bly Eng 4 – Outliers by Malcolm Gladwell
January 30, 2017 Syllabus Important Dates Ethics Class Prep
March 6, 2017 Attorney Alex Tsarouhas – P&W Syllabus CDR Feedback
Your Project Title MEXX
October 31, 2016 Syllabus Oral 1 Attendance Unit Problem Feedback
FINAL PRESENTATION AND PAPER
Team member1 Team member2 Team member3 Team member4 October 2016
Presentation title in White, Arial Bold 21pt on one or two
FINAL PRESENTATION AND PAPER
English 12: 9/1/15 Day 1 Welcome: Mr. Crowley- Portable 1
ENG 1D1 Friday May 1st, 2015.
Title Defense in Practical Research 1:
Grade 1 Winter Project “All About Me” Booklet
Presentation title in White, Arial Bold 21pt on one or two
Monday Bell Ringer (ODD)
Agenda for Tuesday & Wednesday 2/12 & 13 Some of the basics…for Google DRIVE… I am going to be helping you begin setting up your senior paper (folders)
Monday Bell Ringer (ODD)
CAFS HSC ASSESSMENT TASK 2
Publishing & Presenting Your Plan
Day 1: Getting Organized Spring 2011
Wednesday, May 10th Class Short Story.
The Book Thief Research PowerPoint Template & Instructions
PLEASE READ ME FIRST Dear Cad Students and Parents,
Today is Friday 5/10 HAPPY PROM
[Ballot code, contract number] [Project title]
2019 ANSYS Design Analysis Competition
Presentation transcript:

February 11, 2015 Syllabus Important Dates Oral 3 Attorney Troy Prince

ME 4973 Syllabus

Important Dates May 1, 2015 78 days Monday 2/9 Critical Design Review - print a copy – 33% compliant! Wednesday 2/11 Paragraph and graphics Your Team # in the title 2014 Brochure on ME Department Web Page http://www.engr.uconn.edu/me/cms/undergraduate/currentstudents/seniordesign

Brochure Status Photos done Paragraphs – email to me Retake if member missing including faculty advisor Paragraphs – email to me Word doc(x) with Jpeg Photos CAD model Analysis Results Test set up /Machining/Building

Oral 3 Format Title Slide – 1 slide name, teams faculty sponsor, logos 2. Problem Statement – what are you being asked to do/deliver Define the project – 1 slide 3. Analysis Results to date – 3-4 slides A. CAD Models (by itself is not enough) B. Analyses Results (Ansys or other) meshes (critical locations) boundary conditions pictures, models and results (graphs/figures) C. FBDs, hand calculations - Results D. Comparison to test data

Oral 3 Format including initial testing to help with final rig design 4. Test rig or experiment – 2 -3 slides A. design/schematic – how does this address the problem sizing of components – power required, sizing…. B. Models/CAD drawings, pictures, videos…. C. Instrumentation – what is being measured, what is range and accuracy required D. Your test Matrix (DOE if applicable) – range of variables be tested E. Test results to date – comparison with analytical predictions including initial testing to help with final rig design

Results Example – Team 25

Oral 3 Format Project Schedule –now to completion 6. Your risk analysis – mitigation for highest risks

Peer Assessment – Last Slide 7. Peer Assessment - clicker Team is executing to plan (schedule Presented results look encouraging High probability they will meet the project objectives B. Team is having some problems in executing ,but They know the issues and have a plan to recover. Moderate probability they will meet project objectives. C. Team is having serious problems in executing. No plan to recover Low probability they will meet project objectives

For the Oral Report Presentation on a flash drive/other ONE hard color copy of presentation (Stapled) Into team folder

Remember Effort is necessary BUT You are judged on results