Keys To Master Planning Your AVL For New Buildings or Renovations

Slides:



Advertisements
Similar presentations
University Information Technology Services Project Management 102 Pragmatic Guidelines for the Uninitiated Michael Mundrane IT All Staff Conference 12.
Advertisements

EClassroom Standards The University of West Florida.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
Columbia Grove Covenant Church Master Plan Presentation § planning solutions, inc ne 77 th avenue suite 275 vancouver, washington cell.
The Catholic Community of St. Thomas More New Building Committee.
Making a Difference in Residence Life on Campus Dr. Diane Anderson, Vice President for Student Affairs Faculty Senate October 2, 2014.
Renovation 2014 Preserving the Past | Preparing for the Future The renovation we are planning seeks to preserve the past by maintaining the character and.
Dr. Judy Ashcroft, Associate Vice President and Director Dr. Rob Bruce, Deputy Director Ms. Shan Evans, Associate Director Mr. Michael Sweet, Graduate.
Media Ministry and the 21 st Century Presented by Scott Lehmann.
Crystal Girard How does the moon change shape?. Do I need light to see? Have you ever gone into a room that has no windows? When you close the door it.
So You Want to Do a Capital Campaign? Dr. John Jackson, President William Jessup University (
2013 Bond Task Force Proposal Presentation & Proposal by Cory Baker Director Scottsdale Center for the Performing Arts 3 Vice President Scottsdale Cultural.
Ensemble of ensemble of tree and neural network Louis Duclos-Gosselin.
Rod Talbot Regional Ministry Director World Outreach International MOBILISATION TRAINING DEPLOYMENT World Outreach International.
Lights, Camera, Action: Video Systems For Recording, Streaming and Multi-Site Twitter - dukedejong Duke DeJong Church Relations Director.
5 Keys to an Effective Lighting System On A Budget Duke DeJong CCI Solutions Twitter - dukedejong.
What is architecture?. Lecorbusier ““Architecture is the learned game, correct and magnificent, of forms assembled in the light.” Louis Kahn - “Architecture.
Conception Scoping the project Investigating the work Determining the product Defining requirements How do we know when to move from one stage to the.
Welcome to the Church of the Resurrection. The Church is not the Building, it is the People who gather in Christ’s name. Sunday 11:00am Holy Communion,
SDCCG Outcomes Framework Project Workshop 1 (Data Managers and Service Leads)
Watt Reduction Duke DeJong Vice President, Systems Integration CCI Solutions Twitter - dukedejong.
Duke DeJong Vice President, Systems Integration CCI Solutions Twitter - dukedejong Building Technical Teams.
EPS 634 Class # 4 Susan Stillman, Ed.D. November 5, 2009 Class # 4 Susan Stillman, Ed.D. November 5, 2009.
Department of Architecture Prepared by Arct. Dy Tymo ​ Norton University.
CHAPTER -05 SUMMARY.
Example Draw and reflect an isosceles triangle
Example Draw and reflect an isosceles triangle
Microsoft Surface Hub Unlock the power of the group. Key Features
Following in the Master’s Steps
Manchester Master Plan Committee (MPC) Planning Framework
The Fort Worth ISD Learning Model
BANKING INFORMATION SYSTEMS
Quarterly Meeting Focus
How do we use map symbols?
Art A Day 6 Music & Art.
FLIPPED CLASSROOM ACTIVITY CONSTRUCTOR – USING EXISTING CONTENT
John Martin Reservoir Master Plan Revision
Dilbert Scott Adams Manage It! Your Guide to Modern, Pragmatic Project Management. Johanna Rothman.
Peace It doesn’t mean to be in a place where there is no noise,
9 Block Therma-Tech Engineering – President – Ron O’Dell
Phase 4: Plan your infrastructure for scale
The Public Safety Broadband Network (FirstNet) & NG9-1-1
Overview Four Stages Stage 1: Roots - Launch Team Gathering
Chapter 14 Section 6 What are the phases of the Moon?
Please, try: Your mobiles Participate Feel free.
The Duck and the Lemonade Stand
Imminent Analytics Architecture
Project Name: Date: Version Number: Purpose Key Messages Audience
Capex to Opex: Are You Ready?
ANALYSIS AND DESIGN Case Study Work Session 2 From Concept to Reality
Start Finish Find the solution 42 out of out of 2200
VISIONING Transition slide.
The Big Thirst Part 3.
Beech Acres Parenting Center
Making Child Welfare Transformation Work for Clients Staff Planning Phase : Meshing Transformation with Our Mission, Vision and Values March /16/2019.
Enterprise Architecture Week 4
NEXT GENERATION SCIENCE STANDARDS and PROJECT LEAD THE WAY
A desired future state that the individual or organization attempts to realize is a strategic plan. True False
Priesthood and priesthood keys
Communicating Effectively
Mindset: The New Psychology of Success By: Carol Dweck, Ph.D
IT Staff and the End User
= x 2 = = 20 4 x 5 = = 16 4 x 4 = = 18 6 x 3 = = 12 2 x 6 = 12.
What’s the QUESTION? Do Now!
Expansion Project Saturday, February 9, 2019
The Big Conversation Wednesday 24th October 2012
PHASE 3: ANALYSIS PHASE 3: Analysis
IT STRATEGY.
This is the slide shown before the presentation starts
Session 3 Formulating and Executing Value Based
Presentation transcript:

Keys To Master Planning Your AVL For New Buildings or Renovations Duke DeJong Vice President, Systems Integration CCI Solutions www.ccisolutions.com duke@ccisolutions.com Twitter - dukedejong

4 Keys to Master Planning Your AVL Define the key values for ministry before even thinking about AVL Bring your AVL folks in at the right time Develop key values for how technology serves the ministry before talking gear Strategically plan best way to implement

Defining Key Values For Ministry First What are key drivers for the project? Why even do it? How is the space used? What are the core values for how the space is used? What is working in the current space? What feels good? What isn’t working in the current space? What doesn’t feel good? None of these answers should be about technology, it should be about how you do ministry.

Bring Your AVL Folks In At The Right Time AVL should be brought in before architectural concepts are finished if: AVL is handling acoustics (room shaping, angles, absorption & reflection) AVL has to fit in or around the architecture AVL should be brought in while drawings are in development, well before plans are finished if AVL has to specify: conduit power requirements (how much and where) structural loads House Lighting Design

Develop Key Values For How Technology Serves Mission What is the vision for AVL? What kinds of capabilities does it need to have? How flexible do your systems need to be? What is the level of expertise of your techs? What is the quality level of your musicians?

Develop A Plan For Strategic And Effective Implementation Regardless of how your systems are implemented, get the whole plan designed first so you know what the target is. If you have to do this in phases, how should you break that down? Who should install your audio, video, lighting, and acoustics and why? Know your staff and their limitations before you build.

Keys To Master Planning Your AVL For New Buildings or Renovations Resources www.dukedejong.com www.ccisolutions.com/worshiptools www.ChurchTechLeaders.org Church Production Magazine (www.churchproduction.com) Live Design Magazine (www.livedesignonline.com) Church Stage Design Ideas (www.churchstagedesignideas.com) www.ccisolutions.com duke@ccisolutions.com Twitter - dukedejong