Design Services for Wiles Road Broward County Project #104026

Slides:



Advertisements
Similar presentations
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Titusville to Edgewater Bike Loop PD&E Study
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Community Development Department Construction Phase.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Phase 2: 30% Design Plans September 4 th, 2012.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
STA Safety Project PID #76439 December 12, 2006.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
General Tab Project, Cost Schedule, and Work Limits Roadway Character
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 (DB Phase 3) Terry Rd. to Gibbs Pond Rd. Design-Build Project PIN , Contract No. D
Calvin, Giordano & Associates, Inc.
CIVIL/ENVIRONMENTAL ENGINEERING SERVICES FOR CITY OF FORT LAUDERDALE RIVER OAKS NEIGHBORHOOD AND STORMWATER PRESERVE PARK RFQ#
City of Margate Civil Engineering Services R.F.Q
2nd Street Drainage and Paving Improvements
Mitigation Services for Fort Lauderdale Executive Airport
Transportation Engineering Business Development Workshop Department M
The Central Avenue Connector Trail
Jefferson County SA Red Rocks Site Approval
DISTRICT 7 DESIGN-BUILD PUSH BUTTON (FEDERAL SAFETY AND STATE FUNDS)
CITY OF HALLANDALE BEACH
Project Status & Right-of-Way Acquisition
Project Management Team Meeting #3
Interdisciplinary teams Existing or new roadway
DISTRICT 7 DESIGN-BUILD PUSH BUTTON (FEDERAL SAFETY AND STATE FUNDS)
Santa Cruz avenue sidewalks Project
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
CITY OF BOCA RATON TRAFFIC ENGINEERING SERVICES FOR INTERSECTION OF PALMETTO PARK ROAD AND NE/SE 5TH AVENUE APRIL 30, 2015 RFP#
City of Bloomfield Hills
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
City Name Service Category R.F.Q September 14, 2012.
Board of Selectmen Meeting
Transportation Projects
Construction Management & Inspection
Maricopa County Transportation Improvement Program
Calvin, Giordano & Associates, Inc.
SE 12th Street Roadway Improvements February 8, 2005.
PROJ. 566(17) LOR PID MAJOR WIDENING
Lyle Parkway to SR 540 (Winter Lake Road)
State Aid Standards Development
Contract 60X10 Informational Meeting Weber I-55
S.R. 26 Road Rehabilitation in Clinton County
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Walker Street Reconstruction Project 25% Design Public Hearing
City of West Palm Beach Quarterly Procurement Event Engineering Services Department February 15th 2019.
Construction Considerations
Sprague Avenue Phase II Survey Results and Next Steps
St. Andrews Agenda Item 11.A & 11.B
2019 Capital Program Title of Presentation
Alex Henry FDOT District Seven Safety Office
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

Design Services for Wiles Road Broward County Project #104026

ORGANIZATIONAL CHART INTRODUCTION OF EVERYONE – ROLE AND EXPERIENCE NICK ERIC MIKE CHRIS HBC is our subconsultant for Utility Coordination and S&PM. They are also available for peer review of the plans during design. Florida Engineering & Testing supplementing our environmental reporting Radise for geotechnical engineering Lakdas for Structural engineering Aerial Cartographics of America for Photogrammetry Dickey Consulting for PR 22% CBE provided - 15% minimum met

CGA has a 21% CBE goal for this project. THE CGA TEAM Firm Services Key Staff CBE Calvin, Giordano & Associates, Inc. Roadway, Lighting, Landscape Architecture, Signalization, Drainage and Other Associated Improvements. Jenna Martinetti, P.E.; Nicholas Mahon, P.E; David Frodsham, P.E; Eric Czerniejewski, P.E., Env SP; Sandra Lee, AICP CEP, LEED AP BC+D; Michael Conner, RLA; Robert Roush, PE; Steve Watts, PSM; Jon Cooper, P.E. -- HBC Engineering Company Utility Coordination and Signing & Pavement Marking Adebayo Coker, P.E. Mohan V. Thampi, P.E., R.E.M. Florida Engineering & Testing, Inc. Environmental Engineering Support Mark A. Mesiano, PE Lakdas/Yohalem Engineering, Inc. Structural Engineering Lakdas Nanayakkara, P.E. Radise International, L.C. Geotechnical Engineering Gregory Stelmack, PE Thomas Mullin, PE Aerial Cartographics of America (ACA), Inc. Photogrammetry Iarelis Hall, PSM Dickey Consulting, Inc. Public Involvement Sheryl Dickey CGA has a 21% CBE goal for this project. INTRODUCTION OF EVERYONE – ROLE AND EXPERIENCE NICK ERIC MIKE CHRIS HBC is our subconsultant for Utility Coordination and S&PM. They are also available for peer review of the plans during design. Florida Engineering & Testing supplementing our environmental reporting Radise for geotechnical engineering Lakdas for Structural engineering Aerial Cartographics of America for Photogrammetry Dickey Consulting for PR 22% CBE provided - 15% minimum met

PROJECT MANAGER JENNA MARTINETTI, PE Over 13 years of engineering experience Started as a roadway designer Senior PM for roadway, stormwater, water, sewer, land development, and park design projects Experience includes FEMA grants, LAP/JPA and FDOT projects, and County Incentive Grant Projects Advanced Traffic Control Certification

TEAM EXPERIENCE FDOT Pre-qualified MPO/Complete Streets Experience: Community Incentive Grant Program (CIGP) experience Davie Rd Phase 1 College Avenue Nova Drive FDOT LAP projects Davie Rd Ph. 2 Andrews Avenue Tamarac Bike Lanes Broward County Mast Arm Conversion - 35 Intersections Upgraded FDOT pre-qualified in all work groups required for the project Project Approach discussion

PROJECT CHALLENGES Widening reduces/eliminates swales and requires curb & gutter Key elements: Analyze existing profile to confirm 0.3% min. longitudinal slope Overbuild/reconstruct where needed Reduce existing lane widths Install exfiltration trench for water quality Similar Experience: Davie Rd Ph. 1 – widened for new travel and bike lane, added curb & gutter, reconstruction and overbuild, modifications to the drainage system

PROJECT CHALLENGES Widening encroaches on existing trees Key elements: Obtain tree survey Review horizontal clearance Coordination with landscape architect for impact to trees, need for root barriers Site triangles for side streets to be verified Similar Experience: Davie Rd Ph. 1 – widening required relocation of over 45 large royal palms within the R/W as well as removal, replacement or relocation of other species of trees. Davie Rd Ph. 2 – root barriers had to be installed where trees were adjacent to new sidewalk Nova Dr – trees within the swales utilized decorative retaining walls. In-house LA and certified arborists

PROJECT CHALLENGES Widening encroaches on side street and development median noses Key elements: Verify R/W information Minimize impacts Modify where needed Coordinate with the individual condo associations as part of public outreach Verify site triangles for sides streets Similar Experience: Davie Rd Ph. 1 – Driveways were modified to accommodate widening impacts and bring to ADA compliance

PROJECT CHALLENGES Widening impacts existing irrigation and existing bus stops Key elements: Specify proper maintenance or repairs to the existing irrigation system, including notes regarding private systems encountered during construction Coordinate with BCT to meet requirements for 8’ wide pad Coordinate any future bus stop, shelter or pad upgrades. Similar Experience: Davie Rd Ph. 1 – multiple irrigation systems existed requiring replacement. Bid documents included a line item to pay for this. BCT coordination allowed for removing sidewalk from the project to avoid BCT damaging and replacing it months later with the future shelter/pad project.

PROJECT CHALLENGES Lighting location Key elements: Obtain available safety study Review horizontal clearance of existing poles Photometric analysis taking existing trees and new lane into account Coordination with FPL for additional hardening projects Potential for pedestrian scale lighting Similar Experience: Davie Rd Ph. 1 & 2 – existing lighting was supplemented by proposed fixtures SR 870/Commercial Blvd – areas around the intersections were upgrades to have lighting. Andrews Ave – upgrading to LED

PROJECT CHALLENGES Existing conditions at the Coral Springs Nursery Key elements: Coordinate early with City and owner to determine site needs and code requirements Review grades for installation of valley gutter to maintain stormwater on public R/W Similar Experience: Tamarac Bike Lanes – community club house parking requires modification due to bike lane widening. Parking is being relocated to a side street as a separate contract.

PROJECT CHALLENGES Grade differential at R/W line Key elements: Review areas where R/W is higher than adjacent private property Review areas where adjacent property is higher. Provide handrail or gravity wall where required Similar Experience: SR 870 – gravity wall was required at the R/W line due to adjacent backyards being too low.

PROJECT CHALLENGES Overhead utility lines Key elements: Early coordination with UAO’s, particularly FPL Consider constructability, as well as final placement of mast arms and uprights near FPL Similar Experience: SR 870 – FPL transmission and distribution surrounded and crossed the intersection. Transmission lines had to be de-energized for the installation of the new mast arms. Utility work schedules were provided as part of the bid documents.

PROJECT CHALLENGES Right Turn Lane Impact Drainage District Permitting Additional R/W not available at existing right turn lanes New turn lanes constructed where R/W available Coordination with Broward County and property owners Drainage District Permitting Sunshine Water Control District North Springs Improvement District Complete Streets/Bike Lane Buffers R/W may not be available through out the corridor to provide the 2’ buffer the County prefers Striping buffer can be provided and meet the County’s 4’ minimum bike lane width Additional lane will be built in turn lane location

WHY the CGA TEAM? INTEGRATED APPROACH Engage all stakeholders in the planning, design, and construction of the project. Multiple Services in-house allowing for expedited design to meet the project schedule. Experience on similar projects Well defined QA/QC process Clear and efficient communication. EXPERIENCE, PERFORMANCE & SATISFACTION

QUESTIONS?