LOCATION MAP PROPOSED 7-STOREY SCHOOL BUILDING MURCIA TOWN PROPER

Slides:



Advertisements
Similar presentations
It’s on the floor. It’s on the floor. It’s on the floor.
Advertisements

Marriott Cincinnati North Union Centre 6189 Muhlhauser Road, West Chester, OH local Features: Indoor pool Self service.
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
BRIGHTON, UK 8 TH – 10 TH MAY 2014 BRIGHTHELM – DISABLED INFO.
IVCF Philippines Campsite Development Project. IVCF Core Value Designing and running camps and conferences that cultivates personal transformation in.
F. A. Day Middle School Newton, MA Site Plan & Entry Plaza 1 st, 2 nd & 3 rd Floor Classrooms Cafeteria Administration and Student Services Suites West.
Muskegon County New Jail Facility and Juvenile Transition Center Presentation to JJTCC, September 5, 2013.
Government of the Republic of Montenegro The Ministry of Education and Science Directorate of Public Works SECONDARY SCHOOL OF MEDICINE.
Paving the way for Regeneration of Crewe Proposed Lifestyle Centre Christ Church Car Parks Crewe.
Perspective View 5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland.
Turns Right Angles Angles Angles ©mdhazrin. One Complete Turn 90   1 round clockwise Angles: Angles: Turns & Right angles 90   360  ©mdhazrin.
MAC MARITIME TRAINING AND RESEARCH INSTITUTE PROJECT PLANNING
SCHEMATIC DESIGN PRESENTATION
Warm Springs Community Park 1 Administrative Building 3 School of Engineering (EAST) 2 Library and Student Service Center (WEST) 1. Administrative Building.
3a. Pursue funding for the program plan to effect a transformation that is almost complete…Information Commons.
GATEWAY CENTER SPACE UTILIZATION STUDY September 17, 2007.
Rooms & Suites – Superior Room One Bedroom Suite – Bedroom (Sea View)
As a World Class financial institution, UMB is anything but “ordinary”
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Maps, Maps, Maps! What types of maps can we see?.
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
ADDITION & REMODEL Eugene Field Elementary School.
PROPOSED RESIDENTIAL SCHOOL FOR
Building Plans.
Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102, (Ph. 1) Source of Funds:Fund.
Our school gym building has three kinds of sports. The third floor is a table tennis court. The fourth floor is badminton and a basketball courts.
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
Welcome to Our Virtual Tour. Student Lounge Second Floor.
Welcome to Our Virtual Tour. Student Lounge Second Floor.
BRANDON BAPTIST CHURCH MASTER PLAN 8/31/2015 BRANDON BAPTIST MASTER PLAN BRANDON BAPTIST CHURCH MASTER PLAN 1.
New mcmurran science complex new college next library phase. no funding yet. freeman center addition (2010 opening). service for students. workout rooms,
Your Birchwood Park Golf Centre and Horizones Health and Fitness Club are changing...
Hotels April 18 th, context Elements Layout Rooms Amenities Motels.
North Augusta High School Design Development Presentation.
Example 1 Writing Powers Write the product as a power and describe it in words. a. 44= to the second power, or 4 squared 9 to the third power,
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
B equeathing a L egacy… THE THOMASIAN ALUMNI CENTER.
THE LOCATION Building Stack Basement Parking units Ground Floor -Corporate & Residential Lobby -4 Commercial Units 2 nd Floor- 3 rd Floor-Commercial.
LOCATION Easily accessible from EDSA and Quezon Avenue Located right across GMA Network Center Commercial Vicinity: Trinoma SM City North Edsa Tomas Morato.
University of Colorado - Boulder Athletics Department Strategic Plan Athletics Complex Expansion.
What do we have at school?
ANAVARGOS SEA VIEW.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Zoom In Game.
EPHS - FIRST LEVEL ROOM MAP NOTE: INFORMATION/HELP DESK IS ON THE
Multipurpose Cultural Center
SKILL- Direction North West East South North- West North- East
Goding Elementary Existing Conditions Presentation February 13, 2013.
Columbus State Community College
All Saints Church proposal
EPHS - FIRST LEVEL ROOM MAP NOTE: INFORMATION/HELP DESK IS ON THE
Student #7 starts with Locker 7 and changes every seventh door
2007 Bond Issue Capital Improvement Program
What’s there in the living room? There is/are… music room computer room art room playground classroom library.
Primary Longman Elect 2A Chapter 1 There is Is there …?
Where …? Unit 2 Open Day.
Mathematics Unit 45: Twisted Building
BY HERBER.
3B Chapter 1 Open Day.
3B Chapter 1 Open Day.
PE/MULTI-PURPOSE ROOM COVERED OUTDOOR LEARNING CENTER
Maps, Maps, Maps! What types of maps can we see?.
North Augusta High School – Phase 2A and 2B
P.2A Unit 2 Grammar time 1 Where is the ________?
Where’s the classroom? It’s on the second floor. 2A : Unit 1.
Student Center and Fitness Center Catholic High School
ROOM OUTLINE FOR NORTH AND SOUTH WINGS
Presentation transcript:

LOCATION MAP PROPOSED 7-STOREY SCHOOL BUILDING MURCIA TOWN PROPER LUX MUNDI COMPLEX BACOLOD GOVT. CENTER CAPITOL LAGOON LOCATION MAP PROPOSED 7-STOREY SCHOOL BUILDING

VICINITY MAP PROPOSED 7-STOREY SCHOOL BUILDING LUX MUNDI PROPERTY RICE FIELD LUX MUNDI PROPERTY 7-STOREY BUILDING PROPOSED SITE FISH PONDS CHURCH VILLAGE SCHOOL BUILDINGS TO MURCIA PROPER A C C E S S R O A D SITE INFO: 7-STOREY BLDG. FOOTPRINT = 524.00 S.M. PARKING SLOT = 12 CARS SWIMMING POOL = 437.25 S.M. PARK = 2,820.00 S.M. VICINITY MAP PROPOSED 7-STOREY SCHOOL BUILDING

SITE DEVELOPMENTP PLAN PROPOSED PHASE - 2 PROPOSED SWIMMING POOL PLAYGROUND PROPOSED PARK PROPOSED 7-STOREY BUILDING PARKING AREA PARKING AREA SITE INFO: 7-STOREY BLDG. FOOTPRINT = 524.00 S.M. PARKING SLOT = 12 CARS SWIMMING POOL = 437.25 S.M. PARK = 2,820.00 S.M. SITE DEVELOPMENTP PLAN PROPOSED 7-STOREY SCHOOL BUILDING

GROUND FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING FLOOR INFO: ADMIN 1 AUDIO VISUAL ROOM = 84 SEATS - 63.00 S.M 1 COMPUTER LABORATORY = 36 SEATS - 63.00 S.M 1 ADMIN ROOM = 6-7 TABLES - 40.70 S.M 1 LIBRARY = 32 SEATS - 77.00 S.M 1 SPEECH LAB = 32 SEATS - 49.00 S.M LOBBY - 46.00 S.M 2 PWD TOILETS - 5.60 S.M 1 SHE AND HE TOILET - 35.34 S.M PUBLIC AREAS - 144.70 S.M TOTAL = 191 SEATS - 524.00 S.M ADMIN ROOM LIBRARY AUDIO VISUAL ROOM COMPUTER LAB SPEECH LAB HE SHE PWD LOBBY PWD GROUND FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING

SECOND FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING FLOOR INFO: 5 CLASS ROOM = 200 SEATS - 315.00 S.M LOBBY - 31.00 S.M 2 ELECTRICAL ROOMS - 5.40 S.M 1 SHE AND HE TOILET - 35.34 S.M PUBLIC AREAS - 130.26 S.M TOTAL = 200 SEATS - 517.00 S.M CLASSROOM - 1 CLASSROOM - 2 CLASSROOM - 3 CLASSROOM - 4 CLASSROOM - 5 HE SHE LOBBY SECOND FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING

THIRD FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING FLOOR INFO: 5 CLASS ROOM = 200 SEATS - 315.00 S.M LOBBY - 31.00 S.M 2 ELECTRICAL ROOMS - 5.40 S.M 1 SHE AND HE TOILET - 35.34 S.M PUBLIC AREAS - 130.26 S.M TOTAL = 200 SEATS - 517.00 S.M CLASSROOM - 1 CLASSROOM - 2 CLASSROOM - 3 CLASSROOM - 4 CLASSROOM - 5 HE SHE LOBBY THIRD FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING

FOURTH FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING FLOOR INFO: 7 DORMITORY ROOMS WITH SINK = 44 BEDS - 245.8 S.M 1 RECTOR ROOM WITH LOUNGE = 1 BED - 20.35 S.M 1 STUDY ROOM = 13 SEATS - 23.30 S.M. 1 SHE TOILET = 4 W.C, 5 SHO, 4 LAV. - 28.21 S.M 1 HE TOILET = 4 W.C, 5 SHO, 4 UR. 3 LAV. - 28.21 S.M 2 LINEN/ELECT. ROOM - 6.80 S.M PUBLIC AREAS - 164.33 S.M TOTAL = 309 BEDS - 517.00 S.M HE SHE ROOM -1 ROOM -2 ROOM -3 ROOM -4 L O B B Y ROOM -5 ROOM -6 ROOM -7 RECTOR ROOM FOURTH FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING

FIFTH FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING FLOOR INFO: LOBBY 19 HOSTEL ROOM WITH T&B = 36 BEDS - 309.00 S.M 1 RECTOR ROOM WITH LOUNGE = 1 BED - 20.35 S.M 1 STUDY ROOM = 13 SEATS - 23.30 S.M. 2 LINEN/ELECT. ROOM - 4.50 S.M PUBLIC AREAS - 159.85 S.M TOTAL = 37 BEDS - 517.00 S.M RM -8 RM -9 RM -10 RM -11 RM -12 RM -13 RM -14 RM -15 RM -16 RM -17 RM -18 RM -19 LOBBY RM -1 RM -2 RM -3 RM -4 RM -5 RM -6 RM -7 FIFTH FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING

SIXTH FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING FLOOR INFO: LOBBY 18 HOSTEL ROOM WITH T&B = 35 BEDS - 297.82 S.M 1 SUITE ROOM WITH LOUNGE = 1 BED - 31.42 S.M 2 LINEN/ELECT. ROOM - 4.50 S.M PUBLIC AREAS - 183.26 S.M TOTAL = 36 BEDS - 517.00 S.M RM -9 RM -10 RM -11 RM -12 RM -13 RM -14 RM -15 RM -16 RM -17 RM -18 SUITE LOBBY RM -1 RM -2 RM -3 RM -4 RM -5 RM -6 RM -7 RM -8 SIXTH FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING

SEVENTH FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING FLOOR INFO: 1 RESTAURANT = 231.00 S.M ROOF DECK = 286.00 S.M TOTAL = 517.00 S.M SEVENTH FLOOR PLAN PROPOSED 7-STOREY SCHOOL BUILDING

PERSPECTIVE PROPOSED 7-STOREY SCHOOL BUILDING

PROPOSED 7-STOREY SCHOOL BUILDING SOUTH EAST VIEW NORTH EAST VIEW NORTH WEST VIEW SOUTH WEST VIEW PROPOSED 7-STOREY SCHOOL BUILDING