SLAC I&C Division / EE Department

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut SwissFEL Timing System.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
Stephanie Allison/John Dusatko EPICS Collaboration Meeting May 1, Timing and Event System for the LCLS Electron Accelerator*
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Stephanie Allison Facility Advisory Committee Meeting Apr 16, 2007 Timing and Event System S. Allison, M. Browne, B. Dalesio, J.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
INTRODUCE OF SINAP TIMING SYSTEM
Overview of SINAP Timing System Electronics Group Beam Diagnostics & Control Division SINAP.
Micro-Research Finland Oy Timing System with Two-Way Signaling cRIO-EVR Jukka Pietarinen EPICS Meeting Padova October 2008.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
LCLS Timing Software and Plan 1 Controls Timing Workshop EPICS Collaboration Meeting SLAC LCLS Timing Software and Plan April Kukhee Kim.
John Dusatko 2012 EPICS Timing Workshop The SLAC Timing System April 24, The Accelerator Timing System at SLAC: Experiences, Ideas & Future Plans.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Micro-Research Finland Oy MRF Timing System Jukka Pietarinen Timing Workshop CERN February 2008.
Micro-Research Finland Oy Components for Integrating Device Controllers for Fast Orbit Feedback Jukka Pietarinen EPICS Collaboration Meeting Knoxville.
Dayle Kotturi Lehman Review May 10-12, 2005 LCLS Timing Outline Scope SLC Master Pattern Generator Introducing the PNET VME receiver.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS-I/LCLS-II Timing System Low Level Kukhee Kim for LCLS Timing Team ICD Software,
UED at ASTA: LLRF and triggers Need < 100 fs jitter Currently we measure > 500 fs RMS phase noise in 10 Hz to 10 MHz bandwidth at 476 MHz Excessive phase.
MRF & Cosylab on timing system: integration support Joze Dedic the best people make cosylab … Head of Hardware.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
EPICS Collaboration Meeting Timing Workshop April 24, 2012.
Outline Introduction to LCLS Some background on SLAC Timing
MTCA use in Linac to replace CAMAC Tom Himel June 4,
Stephanie Allison LCLS Controls Software Meeting Dec 6, 2007 How To Set Up for the Event System on an IOC with an EVR(s) Assumes.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
The recent history and current state of the linac control system Tom Himel Dec 1,
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
SLAC Aerial View. SLAC Timing System Specifications Blue Book: (~1968) - Resolution: 50 nSec - Jitter: 15 nSec - Main Trigger Line Waveform: + /
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
John Dusatko USPAS Fundamentals of Timing & Synchronization January 25, 2008 / Santa Rosa, CA 1 The LCLS Timing & Event System -
Design of New LLRF System for the SPring-8 Storage Ring T. Ohshima on behalf of RF team of SPring-8-II project LLRF Workshop Shanghai.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN SwissFEL Timing System status & plans Babak Kalantari :: Large Research Facilities /Controls :: Paul Scherrer Institut.
ESS LLRF and Beam Interaction
MicroTCA Development and Status
Outline Introduction to LCLS Some background on SLAC Timing
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
LCLS Timing Software and Plan
Electronics, Trigger and DAQ for SuperB
New xTCA Developments at SLAC
SLAC Timing System Overview
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Event Displays for EVR IOCs
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Timing Outline Scope The order of things
A Portion of the SCP RF Control System LCLS Related
Fill-pattern Control System for KEKB
LCLS Event System - Software
Low Level RF Status Outline LLRF controls system overview
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
EPICS Collaboration Meeting
Timing and Event System for the LCLS Electron Accelerator
LCLS Timing Outline Scope The order of things
Low Level RF Status Outline LLRF controls system overview
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
EVG-to-EVR Data Transfer (Dayle Kotturi)
Low Level RF Status Outline Overview showing hardware instances
Breakout Session: Controls
LCLS Machine Protection System
Timing and Event System Status DOE Review of the LCLS Project SC5 - Controls Systems Breakout Session S. Allison, M. Browne, B. Dalesio, J. Dusatko,
Presentation transcript:

SLAC I&C Division / EE Department 2012 EPICS Timing Workshop The Accelerator Timing System at SLAC: Experiences, Ideas & Future Plans John Dusatko SLAC I&C Division / EE Department

Introduction This talk will focus on the SLAC Timing System giving a bit of history up to the development of the LCLS-I timing system and relate some of our experiences from that. This is followed by a description of our plans for LCLS-II and other systems Finally, I’ll present some ideas/wishlist for new features

Background / History Legacy Timing System: Developed in the 1980s for the SLC: CAMAC-based, generates triggers based on six AC mains-derived “Timeslot” signals Whole system triggered off of 360Hz “Fiducial” (Generated from the three AC mains phases) Uses obsolete components *Still* in use (ran part of LCLS-I before upgrade and still running FACET) LCLS-I: Gave us the chance to develop a new timing system: Decision to use MRF Event System Had to co-exist with original SLC timing and was initially slaved to it (no longer following upgrade)  This requirement affected some of our design decisions

LCLS-I Timing/Event System Architecture ~ Linac main drive line Low Level RF Fiber Cable TRD Rx FIDO PDU Linac Master Osc Raw 360 Hz LCLS Timeslot Trigger LCLS Master Oscillator 476 MHz TRD Tx Sync/Div 119Mhz + FID TO: - Cav BPM - MPS BLM - MPS PIC - BCS Sq Wave on Coax 119Mhz + FID Sq Wave on Coax 360 Hz 119 MHz TRD Rx fiber distribution SLC MPG P N E T I O C E V G F A N SLC events LCLS events LCLS-I Timing as originally implemented / Slaved to SLC Timing: formed event codes from SLC Timing Pattern (PNET) Master Pattern Generator EPICS Network Digitizer LLRF BPMs Toroids Cameras Wire Scanner SLC klystrons I O C E V R D E V LCLS Timing System components are in RED TTL m P P N E T P D U TTL-NIM convert. SLC Trigs

LCLS-I Timing/Event System Architecture Linac main drive line ~ Fiber Cable FIDO PDU TRD Rx Linac Master Osc Raw 360 Hz LCLS Timeslot Trigger LCLS Master Oscillator 476 MHz Sync/Div 119Mhz + FID TRD Tx TO: - Cav BPM - MPS BLM - MPS PIC - BCS Sq Wave on Coax 119Mhz + FID Sq Wave on Coax 360 Hz 119 MHz TRD Rx V M T G C P U E V G F A N 60Hz Timeslot 1 LCLS events Fiber distribution IRQ & Timeslot From MPS (Enet) Digitizer LLRF BPMs Toroids Cameras Wire Scanner SLC klystrons EPICS Network C P U E V R D E V TTL LCLS-I Timing De-Coupled from the SLC System. VMTG module provides Timeslot info and CPU forms event codes directly. The LCLS-II Timing System will look very similar to this TTL-NIM convert.

LCLS-I Timing System Features & Comments: Has ~122 EVRs across 1.5KM of machine (not counting dev units) 85 PMC EVRs 37 VME EVRs (LLRF & BPM Subsystems) Due to distances, we had to use Single-Mode Fiber (replaced Multi-Mode SPFs with SM) Developed Separate TRD (Timing Reference Distribution) subsystem to provide 119MHZ w/360Hz phase-modulated fiducial to systems that didn’t need overhead of an EVR Developed Custom HW (Sync/Div, TRD, VMTG) in addition to MRF Event HW Extensive SW development effort (more so than the HW dev) Made some changes to MRF HW

LCLS-II will timing will be very similar to LCLS-I LCLS-II Timing System LCLS-II will timing will be very similar to LCLS-I Have its own EVG LCLS-II will run on different timeslots than LCLS-I Both LCLS-I & -II timing systems will “know” about each other (via a synchronizing signal) Using uTCA platform as well as VME

LCLS-II Timing System Micro TCA Will be used in at least the BPM subsystem, possibly LLRF as well Development effort underway Interim timing solution: PMC-EVR-200 on uTCA adapter Planning on using/adapting Stockholm University uTCA Timing Module (dev’d for XFEL) as final solution Developed for XFEL Distributes triggers & clock on uTCA backplane Double-wide (with RTM I/O) in development Contains fiber phase stabilization mechanism

Other SLAC Machines & Future Plans FACET: (1st 2/3rd of Linac) Uses SLC timing for all Legacy Systems Uses Event System for all new subsystems (accelerator controls as well as experiments) XTA: X-Band Test Accelerator (stand-alone machine) Uses Event System for timing / coupled to SLC timing SPEAR-III: Considering Event System for booster upgrade PEP-X: Could/Would use Event System in some form Grand SLAC Timing System: Would tie together all related systems (don’t know what this would look like yet…)

Timing Features Wishlist Desired Features: EVR Standby trigger capability FPGA Gateware mod to EVR to support stby triggers (completed on VME-EVR) Greater than 256 event codes Experiment support keeps asking for more ECs! Fanout Module Upgrade Added diagnostics for SFP status readout & single-level fanout ports Fiber Phase Stabilization SU uTCA module has this feature Additional Diagnostics on EVG side Readout of parameters (RF power, phase, fiducial rate, etc.) from Sync/Div chassis EVR SFP (optical xcvr) Diagnostics Readout for maintenance