Ohio Department of Transportation

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

Session 1 Outline Overview of Phase II What is expected? What should we be doing today? What are others doing? Suggested steps to move your program forward.
Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Stormwater 101: How to stay out of trouble with TDEC.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
City of Puyallup Planning Commission Presentation February 8, 2012.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Overview of Montana’s Stormwater Regulatory Program.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Barb Loida, Carolyn Adamson, Dave Bauer MECA 2014.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
An Overview of our Community’s Stormwater Management Program
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Pollution Control: For Field Office Construction Sites.
MS4 Permit – Meaning, History, and Annual Report Results Watershed Partners 4/13/
North Hennepin Community College MS4 Plan October 24, 2014.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Hampden Township Stormwater Management Program
MS4 & Construction Storm Water Permits
Municipal Separate Storm Sewer System (MS4) Permit
ODOT District MS4 Liaison Training: Why are we here?
Supervisor, RIDEM RIPDES Permitting Program
MS4 On-site evaluations & common findings
Inspector Challenges.
Presentation to the Livingston City Council on the Phase II MS4 Permit
Iowa Certified Construction Site Pollution Prevention Inspector
MCM #3 Illicit Discharge Determination and Elimination (IDDE)
Charlotte-Mecklenburg Storm Water Services
TPDES Construction Management at the City of Laredo
Summit County MS4.
Sacramento County Stormwater Quality Program
Stormwater Management Program
EPA Public Meeting Dallas, Texas May 10, 2005
John Tinger U.S. EPA Region IX
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
MS4 OVERVIEW 2015.
MS4 = Municipal Separated Storm Sewer System
Sacramento County Stormwater Quality Program
Stormwater Construction General Pemit (CGP) TXR150000
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Ohio Department of Transportation Ohio EPA Audit Findings of ODOT’s MS4 Stormwater Management Program August 10, 2016 Session Presenter: Becky Humphreys, PE, ODOT Stormwater Program Manger ODOT Office of Hydraulic Engineering

Audit of ODOTs MS4 Program - Agenda ODOTs MS4 Program Audit Summary of Findings What authority does OEPA have? What did OEPA look at? What did OEPA find? What are ODOT’s Responses to each of the violations?

Ohio EPA Authority The Federal Water Pollution Control Act of 1948 - the first major U.S. law to address water pollution. Clean Water Act - June 22, 1969: The Cuyahoga River catches fire in Cleveland, drawing national attention and helping the passage of major revisions to Federal Water Pollution Control Act – became known as Clean Water Act. National Pollutant Discharge Elimination System (NPDES) Permits - 1992 Ohio became a delegated state. MS4 Permit – (Municipal Separate Storm Sewer System) The CWA made it unlawful to discharge any pollutant from a point source into navigable waters, unless a permit was obtained. EPA's National Pollutant Discharge Elimination System (NPDES) permit program controls discharges. Whenever a municipality, industry, or other entity wishes to discharge water to a surface water of the State, they must first obtain a permit from the Ohio EPA Division of Surface Water (DSW). This permit is called a National Pollutant Discharge Elimination System (NPDES) permit. NPDES permits regulate wastewater discharges by limiting the quantities of pollutants to be discharged and imposing monitoring requirements and other conditions. The limits and/or requirements in the permit help ensure compliance with Ohio's Water Quality Standards and Federal Regulations, all of which were written to protect public health and the aquatic environment. In August of 1992, the U.S. EPA delegated to Ohio EPA the authority to issue general NPDES permits. Ohio law regarding general permits (Ohio Revised Code Section 6111.035) was originally written to apply to coal mining and reclamation activities. It was revised to expand the scope of general permits to storm water discharges. Polluted storm water runoff is often transported to municipal separate storm sewer systems (MS4s) and ultimately discharged into local rivers and streams without treatment. EPA’s Stormwater Phase II Rule establishes an MS4 stormwater management program that is intended to improve the Nation’s waterways by reducing the quantity of pollutants that stormwater picks up and carries into storm sewer systems during storm events.

ODOTs MS4 Program - Overview ODOT has been implementing and reporting on storm water best management practices (BMPs) as part of their MS4 permit since 2003. Permit allows ODOT to discharge storm water from ODOT owned storm sewer systems. ODOTs MS4 regulated area has changed due to 2010 Census ODOT will be updating their existing Storm water Management Plan (SWMP) between now and December 2017. Changes coming with how ODOT will manage, implement and report on MS4 program requirements due to OEPA audit.

ODOTs MS4 Program - Audit What did OEPA look at? Field Audit Audit conducted between January and December 2014. OEPA visited 1 ODOT facility and 2 active construction sites in each district between January and November 2014. MS4 Program Audit OEPA completed ODOTs MS4 audit on December 5, 2014.

ODOTs MS4 Program – Audit Findings Minimum Control Measure Number of Violations MCM 1 - Public Education/Outreach No violations MCM 2 - Public Involvement/Participation MCM 3 - Illicit Discharge Detection and Elimination 3 violations MCM 4 - Construction Site Storm Water Runoff 7 violations MCM 5 - Post Construction Storm Water Management MCM 6 - Pollution Prevention/Good Housekeeping 2 violations Refer to actual SW audit findings letter to reference other program based violations * Ohio EPA and Ohio DOT are still in negotiations over these. None of these violations are final yet.

ODOTs MS4 Program – Audit Findings MCM 1 & MCM 2 No violations Refer to actual SW audit findings letter to reference other program based violations

ODOTs MS4 Program – Audit Findings Failed to map all Home Sewage Treatment Systems (HSTS) discharging to ODOT’s MS4 Failed to demonstrate a working relationship with local health departments Failed to develop an IDDE plan that meets the expectations of the permit. (i.e. a plan to evaluate, prioritize, and eliminate illicit discharges) MCM 3 (IDDE) Violations Refer to actual SW audit findings letter to reference other program based violations

ODOTs Response to MCM 3 Violations Violation: Failed to map all Home Sewage Treatment Systems (HSTS) discharging to ODOT’s MS4 Ohio Revised Code requires local Boards of Health to locate and keep records on all HSTSs ODOT proposed to create a webpage to be included on ODOT’s Storm Water Webpage that shows: All Ohio counties Hyperlinks to each county health department Contact person from each ODOT District Refer to actual SW audit findings letter to reference other program based violations

ODOTs Response to MCM 3 Violations Violation: Failed to demonstrate a working relationship with local health departments. ODOT developed a new process for when illicit discharges are detected: Identify illicit discharges during routine asset inventory, inspection, or maintenance activities. Report any findings to local health department. Annually request status of the identified illicit discharges from local health departments. Report annually to Ohio EPA. Refer to actual SW audit findings letter to reference other program based violations

ODOTs Response to MCM 3 Violations Violation: Failed to develop an IDDE plan that meets the expectations of the permit. (i.e. a plan to evaluate, prioritize, and eliminate illicit discharges) ODOT revised IDDE plan: Investigate High and Medium Priority locations by June 30, 2017 (89 locations previously identified dry weather flows). Investigate Low Priority locations by December 31, 2018 (671 locations previously identified dry weather flows). Investigations will include: Collect water sample Test to determine if discharge is illicit Track illicit discharges to the source where flow enters ROW Contact appropriate local Health Department Refer to actual SW audit findings letter to reference other program based violations

ODOTs MS4 Program – Audit Findings Failed to demonstrate adequate review of SWPPPs Monthly inspections required to be done by ODOT personnel. Failed to demonstrate implementation of an enforcement mechanism to ensure compliance on construction sites. SWPPPs are developed at final grade. MCM 4 (Construction) Violations Refer to actual SW audit findings letter to reference other program based violations

ODOTs MS4 Program – Audit Findings Failed to consistently include construction sequence which addresses the timely installation of sediment ponds. Failed to comply with all permanent and temporary stabilization requirements. Failed to consistently maintain sediment and erosion controls. MCM 4 (Construction) Violations Refer to actual SW audit findings letter to reference other program based violations

ODOTs Response to MCM 4 Violations Violation: Failed to demonstrate adequate review of SWPPPs ODOT contends that adequate reviews are required. Construction is not allowed until SWPPP is reviewed by the project engineer. SWPPPs are reviewed on ALL projects not just those within the MS4 boundary. New checklist forms and tracking procedures are being developed. ODOT requires the monthly inspections on all construction projects obtaining coverage under a Construction General Permit.

ODOTs Response to MCM 4 Violations Violation: Monthly inspections are required to be performed by ODOT personnel. ODOT contends Ohio EPA’s interpretation of this part of the permit. The language in the permit does not specify that the inspections must be performed by an ODOT employee or independent contractor. ODOT proposed to implement a software inspection tool. should increase the quality of inspections and documentation of deficiencies. ODOT proposed to do QA assessments on a representative sample of projects. FHWA allows contractors to perform QC inspections on soil compaction, concrete and storm sewer installations. The Ohio EPA has made an interpretation based on an assumption that monthly inspections performed by an ODOT employee or independent contractor will reduce pollutants beyond a construction contractor hired inspector who holds a Professional Engineer’s license and Certified Professional in Erosion and Sediment Control certification. ODOT contends that an ODOT employee or independent consultant who is not involved in the day to day workings of a construction contractor’s means and methods will not provide better quality inspections and ultimately reduce pollutants from ODOT’s construction sites.

ODOTs Response to MCM 4 Violations Violation: Failed to demonstrate implementation of an enforcement mechanism to ensure compliance on construction sites. ODOT contends that this is not a violation since we have protocols in place to enforce compliance. ODOT provided a clear explanation of these protocols. ODOT proposed continual assessment of these protocols. Mention briefly the protocol. 1)ODOT project engineer can direct work. Project Engineer first sends notice to contractor to correct any deficiencies. 2)Stop pay for any soil erosion/sedimentation items 3)Removal of personnel from the project 4)Suspend work 5)Notify the contractor’s surety – failure to provide insurance would prevent being awarded any future work.

ODOTs Response to MCM 4 Violations Violation: SWPPPs are developed at final grade. ODOT updated specifications to include mandatory use of electronic files to develop the SWPPPs. ODOT contends that interim grading plans are not practical for linear projects. ODOT proposed that adding existing conditions plans will allow inspectors to update the SWPPP and make it the living document Ohio EPA is looking for. Mention briefly the protocol. 1)ODOT project engineer can direct work. Project Engineer first sends notice to contractor to correct any deficiencies. 2)Stop pay for any soil erosion/sedimentation items 3)Removal of personnel from the project 4)Suspend work 5)Notify the contractor’s surety – failure to provide insurance would prevent being awarded any future work.

ODOTs Response to MCM 4 Violations Violation: Failed to consistently include construction sequence which addresses the timely installation of sediment ponds. ODOT proposed that revisions to specifications requiring an existing conditions plan will address the timely installation of sediment controls. Mention briefly the protocol. 1)ODOT project engineer can direct work. Project Engineer first sends notice to contractor to correct any deficiencies. 2)Stop pay for any soil erosion/sedimentation items 3)Removal of personnel from the project 4)Suspend work 5)Notify the contractor’s surety – failure to provide insurance would prevent being awarded any future work.

ODOTs Response to MCM 4 Violations Violation: Failed to comply with all permanent and temporary stabilization requirements. ODOT proposed that revisions to specifications and implementing the software inspection tracking tool will help resolve this issue. Mention briefly the protocol. 1)ODOT project engineer can direct work. Project Engineer first sends notice to contractor to correct any deficiencies. 2)Stop pay for any soil erosion/sedimentation items 3)Removal of personnel from the project 4)Suspend work 5)Notify the contractor’s surety – failure to provide insurance would prevent being awarded any future work.

ODOTs Response to MCM 4 Violations Violation: Failed to consistently maintain sediment and erosion controls. ODOT proposed that revisions to specifications and implementing the software inspection tracking tool will help resolve this issue. Mention briefly the protocol. 1)ODOT project engineer can direct work. Project Engineer first sends notice to contractor to correct any deficiencies. 2)Stop pay for any soil erosion/sedimentation items 3)Removal of personnel from the project 4)Suspend work 5)Notify the contractor’s surety – failure to provide insurance would prevent being awarded any future work.

ODOTs MS4 Program – Audit Findings Failed to develop comprehensive map of all post construction practices discharging to the MS4. Failed to develop mechanism to ensure maintenance of all post construction practices. Failed to consistently interpret and implement the post construction requirements found in the General Construction Permit. MCM 5 (Post Construction) Violations

ODOTs Response to MCM5 Violations Violation: Failed to develop comprehensive map of all post construction practices discharging to the MS4. MOU between ODOT and OEPA - all BMPs through July 31 2009 were compliant per an assessment of $2.5M. ODOT developed post construction BMP inventory database for all BMPs from that date forward. ODOT also developed Inventory/Inspection Manual for Post Construction BMPs.

ODOTs Response to MCM5 Violations Violation: Failed to develop mechanism to ensure maintenance of all post construction practices. ODOT proposed to incorporate inspection and maintenance into work plans by July 1, 2017. ODOT is developing Post Construction BMP Collector App. Inspection tracking Maintenance tracking

ODOTs Response to MCM5 Violations Violation: Failed to consistently interpret and implement the post construction requirements found in the General Construction Permit. ODOT made many revisions to the BMP sections of our Location & Design Manual (Volume 2 – Drainage). ODOT conducted 5 training classes on Post Construction BMP Design across the state. ODOT performs self auditing reviews of BMP design.

ODOTs MS4 Program – Audit Findings MCM 6 (Pollution Prevention/ Good Housekeeping) Violations Failed to develop Storm Water Pollution Prevention Plans (SWPPPs) for all maintenance facilities. Failed to conduct training of employees regarding the implementation of the SWPPP.

ODOTs Response to MCM6 Violations Violation: Failed to develop Storm Water Pollution Prevention Plans (SWPPPs) for all maintenance facilities. ODOT hired task order consultant to develop SWPPPs and provide initial training ($1.22M over 3 years).

ODOTs Response to MCM6 Violations Violation: Failed to conduct training of employees regarding the implementation of the SWPPP. ODOT hired task order consultant to develop SWPPPs and provide initial training ($1.22M over 3 years).

Questions? Becky Humphreys, P.E. ODOT Stormwater Program Manager becky.humphreys @dot.ohio.gov 614-387-1125