An early success story of people for the people

Slides:



Advertisements
Similar presentations
Achieving the MDGs: RBA Training Workshop Module 6: Urban Development Investment Cluster May 9-12, 2005.
Advertisements

GG4GenB Human Impact on Landforms The visual impact of ski runs on the landscape – some tree removal.
1 PRODUCTION OF A MANUAL FOR STATISTICS ON ENERGY CONSUMPTION IN HOUSEHOLDS MESH PROJECT 3 th Working Meeting Vienna, 3 th May 2012 WP2: DISCUSSION OF.
CONSTRUCTION OF SPORTS AND TOURISM CENTER DOLI – VAREŠ Vareš, April MUNICIPALITY VAREŠ.
Committed to smart, sustainable technology. Natural Gas Heat Pumps Opportunities for teaching HVAC concepts, theories & issues.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
EUR 147,000 2 nd floor of 6 story building, 90 M2 3 room apartment on Mill Street 31, Riga, Center 3 bedroom apartment in the quiet Riga center. Autonomous.
„Extension and modernization of water and wastewater infrastructure in Arad County”
RAINWATER HARVESTING IN THE HOSPITALITY SECTOR
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
The Australian Alps are the highest mountain ranges of mainland Australia. They are located in south-eastern Australia and run across the Australian Capital.
6 Buildings, 12 Houses General description: The property is located 1.5 km away from the biggest summer holiday resorts on the Bulgarian Black Sea - Sunny.
Project „ DEVELOPMENT OF SPORTS, RECREATION AND WELLNESS COMPLEX IN ROKISKIS”. Total value 5,8 million Eur.
A Sustainable Residential Design Project Project 16 DS 413: Design Studio 413 May 9, 2012.
Project International training and sports centre Cenkovice L&P plus, spol. s r.o.
The influence of European funds in developing local communities The,,Băile Figa” Balneary Park – from project to tourism destination The Mayoralty of Beclean.
INVESTMENT PROJECTS THE TIME IS NOW! Mr. Bozidar Laganin FDI Advisor Seoul May, 2007 Investment Forum in Seoul Serbia Investment and Export Promotion Agency.
Project location, The project and financial overview
Applying scientific thinking in the service of society Water and Sanitation Low carbon cities meeting 04 – 06 October 2010.
APEC Low Carbon Model Town Project Phase1 Tianjin Yujiapu Feasibility Study 1 APEC LCMT Project Feasibility Study Phase 1 Tianjin YUJIAPU Low-Carbon CBD.
What do the following have in common? Airplanes, bridges, cars, dams, electricity, skyscrapers, landfills, helicopters, offices, pumps, restrooms, spaceships,
Geothermal Heating System in the City of Bijeljina Bijeljina, City of Bijeljina City of Bijeljina Bosnia and Herzegovina.
CARRYING OUT EXAMINATION AND ISSUE OF THE CONCLUSION ACCORDING TO PROJECTS OF PLANNING OF THE OCCUPIED PLACES (ON AN EXAMPLE OF THE CITY SETTLEMENT)
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
NUMBER OF FLOORS: means the number of floors that are counted from the vertical section of a building at a point where the building has the most floors.
Building of the tourist complex “Saygon Step” Idea of the project: the result of the project implementation will be creation of a complex recreation center.
TRACECA INVESTMENT FORUM Brussels 2012 International Issykul Airport Reconstruction Project KYRGYZ REPUBLIC.
Reconstruction of coastal recreational parkland in Nova Kakhovka Project idea: landscaping of the city park along the Dnipro River (length is 1 km), development.
Dubrovnik Conference Island of MLJET Island of MLJET NEEDS & OPPORTUNITIES IN INFRASTRUCTURE KOMUNALNO MLJET D.O.O. FRANO HAZDOVAC, DIRECTOR.
KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute.
Variable Load on Power Stations
Unique assets … of Glentrool: 1.Surrounded by forest 2.Local tourist attractions 3.Amazing local scenery and outdoor activities 4.Only village in the.
Learning the Basics of Recreation Facilities 3 chapter.
DISTRICT HEATING District heating is an infrastructure which allows heat generated in a centralized location to be distributed to residential homes and.
EXPO – 2017 ASTANA Malika Bekturova population is ASTANA INFO PEOPLE total area is HECTARS average temperature (in summer) - 25C (77F) ASTANA.
Seminar for Eastern Europe, Caucasus and Central Asia Countries (EECCA) on Water Statistics September 2012, Almaty, Kazakhstan J.Otgonbayar, Water.
AIMAG GROUP OVERVIEW AIMAG GROUP An integrated system of companies for innovation and quality of service. A multi-utility company for the.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, EnergoAlem Company Electricity Market.
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
Russia. Tver region. Zavidovo. This is a unique place for medicine.
DRAFT Status Report: Five-Year Energy Plan Town of Athol January 2013.
The Assessment of Water Utility's Efficiency in Libya ) Case Study (
Sustainability Assessment of Family House - Case Study
sHPP VRŠUMA Draga, KO Draga, Tutin, SRBIJA -Business Plan-
ANAVARGOS SEA VIEW.
Environmental Services
„Banat sun 4 all-Pilot project for promotion and implementation of solar energy for sanitary water heating“ 1.
Information about the resort recreation area "Kenderli"
Feasibility Study Phase1 Tianjin YUJIAPU Low-Carbon CBD
Industrial Zone Alatau district of Almaty
Sustainable development of lakes in Cluj County
CONSTRUCTION OF SKI COMPLEX «ARTYBASH»
NPUST Experience on UI GreenMetric World University Ranking
uacn property development company plc
Water Works For Baqa Al-Sharqyah Town -Analysis And Re/Design
Urban planning & Infrastructure optimization
Who We Are ACE is a group of Anglesea locals promoting community energy projects in Anglesea SCEG, some of whose members live in Anglesea, promotes.
18/11/07 Danube Water Conference 2018, Vienna, Austria
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Practical information and implementation
CONSTRUCTION PROJECT IN YAGOTYN DISTRICT, KIEV REGION
Views from and onto the Chalet
The SWITCH Approach to Integrated Urban Water Management
Sport Center Description and examples
Metropolitan Mayors Caucus Illinois Energy Bills
A Practice of Building a Low-carbon City in Chenggong New District Kunming, China Chengong Municipal People’s Government May 2016.
The constructed area is about 2,988 m2 and the property contains ten bedrooms, seven bathrooms, various living rooms, some of them with fireplaces. There.
Samui Low Carbon Town, Thailand
Sanitation Study and Wastewater Network System AL Tayba Village
Views from and onto the Chalet
Presentation transcript:

An early success story of people for the people Intercommunity Development Association I.D.A Molivisu www.ghitumolivis.ro/ghitu/index.php An early success story of people for the people

Owner: I.D.A. Molivisu Partner: Energy Services Group PROJECT: CREATION OF GENERAL AND SPECIFIC INFRASTRUCTURE FOR TOURISM ACTIVITIES IN THE CLIMATE AREA GHITU-MOLIVISU, AREFU VILLAGE, ARGES COUNTY Owner: I.D.A. Molivisu Partner: Energy Services Group No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/3120035, www.energyservicesgroup.ro

Who may be interested Avid nature lovers who dream of a landscape of stunning beauty : Molivisu sunny glade surrounded by imposing massive Ghitu Ghitu Peak area 30,4 ha Molivisu Glade Area 62,5 ha Ghitu Peak area 365 ha No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/3120035 www.energyservicesgroup.ro 3

WHAT CAN BE INTERESTING Of the two contrasting “mountain-glade”, has emerged the idea of a resort: Molivisu Resort No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/3120035 www.energyservicesgroup.ro

Future Resort Molivisu It will be located at 167 km from Bucharest and only 67 km from Pitesti Arefu village development strategy aims to transform Ghitu sight in a tourist resort of national interest, in accordance with EU standards and placed on thematic tours. The Urban Area Plan have been the foundation for implementing the tourism infrastructure of the future resort. Development zones (A, B, C, D, E, F, H), due to the infrastructure of tourism, will be the result of the current infrastructure project implementation. No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/3120035 www.energyservicesgroup.ro

The proposed project: Creation of general and specific infrastructure for tourism activities in the climate area Ghitu-Molivisu, Arefu Village, Arges county Specific objectives: Development of infrastructure and utilities: water, sewer, electricity, road Creating and camping equipment platforms, including specific utilities (toilets, running water, lighting, garbage collection points) Construction of swimming pools, beaches, pools Sports building Ski slope construction Construction / development practice runs for other winter sports Building cycling tracks No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/3120035 www.energyservicesgroup.ro

Objectives that will form the basic infrastructure of the resort Molivisu Ski slope A1 Features: Length 1048,62 m Degree of difficulty - Medium Equipment: air lifts, artificial snow production equipment the car to beat the snow, night lighting installation No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/3120035 www.energyservicesgroup.ro

Ski slope A2 Features:: Length 342,67 m Degree of difficulty– low Equipment: treadmill, installation of night lighting No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/3120035 www.energyservicesgroup.ro

Recreational infrastructure on the A1 bottom area ski slope Features: Pool Multi Sport Field Children Playground Pavilion for the arts Campground Access paths No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/3120035 www.energyservicesgroup.ro

Planning for inprovment the natural deposit of peat land for valorification in tourist purpose (Molivişu Peat) Features: alley access for visitors recreation location ecologic al ornamental lighting No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040) 21/3120035 www.energyservicesgroup.ro

TOURISTIC OBSERVATORY Features: built area = 154 sqm area held = 462 sqm sniper central equipment placed under glass pavilion situated on the 2nd floor rear windows on the perimeter of the building shooting and projection rooms shooting exhibition space elevators, toilets No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040)21/3120035 www.energyservicesgroup.ro

Recovery of tourist resources in renewable energy - SHP(small hydropower plant) Number of small hydro-power plant– 3 Number of micro hydro units– 7 Installed power– 47,5 kW estimated annual energy production– 214 MWh

Infrastructure and utilities Development of 6 km length communal road, with 6 m width of the carriageway, pavement and cycling track Drinking water network of 12 km in length, with five households of water (catchment, treatment, pumping) Implementation of sewerage network in the length of 17 km, with five treatment plants Grid achievement length 9.24 km, 11 stations in different power transformer to provide electricity to all areas of development No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040)21/3120035 www.energyservicesgroup.ro

Project indicators Estimated value of investment : 59.283.219 lei/14.424.141 euro Land area occupied by the project : 44 ha Estimated annual income : 1.701.190 lei No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040)21/3120035 www.energyservicesgroup.ro 14

INDICATORS on investment objects   Investment objects Investment value [lei] 1 Ski slope medium difficulty 7.463.550 2 Ski slope low difficulty 1.241.620 3 Touristic observatory in Ghiţu Peak 1.827.700 4 Recreational infrastructure including associated utilities on the bottom area ski slope 3.206.230 5 Planning for improvement the natural deposit of peat land for valorification in tourist purpose in Molivisu Glade 1.357.360 6 Recovery of tourist resources in renewable energy 1.034.590 7 Communal road 14.997.330 8 Electric distribution networks for electricity supply 3.214.639 9 Capture, treatment and distribution plant for potable water 15.918.910 10 Wastewater sewer system 9.021.290 Total 59.283.219 No. 10, Stelea Spătaru street, district 3, Bucharest, Tel/Fax:(0040)21/3120035 www.energyservicesgroup.ro