VDOT’s Operations Program Opportunities May 20, 2016

Slides:



Advertisements
Similar presentations
Eric Graves, P.E. City Traffic Engineer Alpharetta, Georgia
Advertisements

FDOT District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer.
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Virginia’s Statewide TOC and ATMS Contract
6TH ANNUAL CONFERENCE.
Public Works Dr. Adnan Alshiha. Public Works The community infrastructure Public work covers many functions: Street and traffic Water and sewage Engineering.
SIXTH ANNUAL AMOTIA CONFERENCE Asset Maintenance in Louisiana Rhett A. Desselle, P.E. 10/03/2014.
October 7, 2013 Gregory Whirley Commissioner 2013 Fall Asphalt Conference.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Rick Via Statewide Incident Management Program Manager Office: Leveraging Technology & ITS to Enhance Traffic.
Emerging Transportation Technologies in Virginia Ken Earnest Assistant Division Administrator Operations Division.
Southeastern Pennsylvania Transportation Authority Business Services Division Procurement & Contracts Department Doing Business with SEPTA.
Red Light Safety Camera Program Update Presented by Public Works Department Traffic Engineering Division Board of County Commissioners June 19, 2012.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
ACEC Joint Conference on Regional and National Economy Trends & Opportunities June 14, 2012 William C. Cuttler, P.E. Assistant District Administrator -
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
1 Dixie ITS Architecture Study Section ? Utah ITS History.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
Operation & Maintenance Budget Public Works Department FY Budget Worksession July 13, 2015.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
Local Rural Highway Investment Program (LRHIP)
Project History and Background. Senate Bill Directed UDOT to Implement Traffic Traffic Signal Coordination Systems Established a Traffic Signal.
Georgia’s Intelligent Transportation System
Success with Miami-Dade County’s ATMS Upgrade Success with EMBEDDED INTEGRATORS Presented at: ITS America Annual Meeting Houston, Texas May 4th, 2010 by.
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
Tracy Lovell, PE HSIP PROJECT PROCESS. HSIP Process  Identify the location – RD Corridor, Emphasis Area, etc.  Conduct Road Safety Audit with multi-disciplinary.
Regional Transportation Management Center Shared Operations Center – Mn/DOT Traffic Operations – Mn/DOT Maintenance Dispatch – State Patrol Dispatch 400.
CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins.
Work Zone Safety Virginia Work Area Protection Manual International Municipal Signal Association March 8, 2016 Paul Kelley & Ginger Quinn WZ Safety Coordinators.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
VDOT’s Operations Program Update and Opportunities June 6, 2014 Dean Gustafson, P.E., PTOE State Operations Engineer Operations Division.
VDOT’s Operations Program Update and Opportunities July 17, 2015 Dean Gustafson, P.E., PTOE State Operations Engineer Operations Division.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
Transportation Report
City of Santa Cruz American Recovery and Reinvestment Act (ARRA) December, 2009 Update.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Facing Funding and Weather Challenges: Impact of Weather Events on Treatment Selection and Pavement Condition PPRA Fall Meeting 2014 November 17-19, Baltimore,
Stage 2 Light Rail Transit Program “In the ground ready”
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Transportation Engineering Business Development Workshop Department M
The Central Avenue Connector Trail
Public Works/Municipal Utilities Department
Local Government Roundtable Session Arlington, Virginia
Chapin Town Hall Meeting
Intelligent Transportation Systems
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Traffic Signal Performance Measures in a Small Urban Area
VDOT’s Operations Program Update and Opportunities May 17, 2013
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
Kerr Tar Project Update – June 2016
Florida Transportation Commission FY 2009
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
Mobility Fund High Impact/Low Cost Projects: Cape Fear RPO
Highway 169 Bridge Replacement & Pavement Resurfacing
Maricopa County Transportation Improvement Program
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Responsibilities and FUNDING
ITE Midwestern District Conference June 20, 2017
Contract 60X10 Informational Meeting Weber I-55
Meadow Lake Boulevard Street Extension Project
VDOT Information Session
Central Corridor - Light Rail Transit Metropolitan Council
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Major Initiatives in Hampton Roads
Presentation transcript:

VDOT’s Operations Program Opportunities May 20, 2016 Dean Gustafson, P.E., PTOE State Operations Engineer Operations Division

Current & Upcoming Contracting Opportunities Status I-95 Fiber & ITS Installation Exit 76 – 86 (UPC 106938) Currently Advertised – Bids Due 5/25/16 Central Region Traffic Signal Contract (Includes some ITS installation) Scheduled Advertisement – Late 2016 Architectural Services for New Richmond TOC/VSP/Engineering Facility Imminent Advertisement (Facility Construction Contract planned for Fall 2017) Southwest Region Sign, Guardrail and Pavement Marking Contracts Several On-call and project-specific opportunities over the next two years 2

Current & Upcoming Contracting Opportunities Status Northern Region Roadway Lighting & Utility Maintenance Scheduled Advertisement – June 2016 Traffic Signal Controllers and Parts Scheduled Advertisement – July 2016 On-Call Traffic Signal Construction Contract Scheduled Advertisement – Sept 2016 On-call TE/ITS Consultant (Professional Services) Scheduled Advertisement – Spring 2017 3

Current & Upcoming Contracting Opportunities Status Signal System Contracts Traffic Signal Controllers Controller Firmware Statewide Central Signal System Software One RFP yielding 1 to 3 Contracts Scheduled Advertisement – Summer 2016 Traffic Monitoring Contracts Purchase traffic data for the statewide traffic monitoring program Installation, repair and maintenance of count stations Two RFPs with 1 Award per Region Scheduled Advertisement – Early 2017 4

Current & Upcoming Contracting Opportunities Status ITS / Operations On-call Services Scheduled Advertisement – June 2016 Operations On-call Design Services Eastern Region Construction Engineering & Inspection Services Underway – EOIs received 5

Current & Upcoming Contracting Opportunities Statewide TOC Services Re-procurements Status Statewide ATMS Sole Source Award expected June 2016 Operations Program Support Scheduled Advertisement – June 2016 ITS Maintenance Scheduled Advertisement – Summer 2016 TOC / SSP Operations Statewide Platform as a Service (PaaS) RFP Advertisement – Summer 2017 6

Transportation Fund (ITTF) Projects FY17 Activity Project Location I-64 HRBT Overheight Detection Hampton Roads (I-64 corridor) I-95/I-395 ICM: Multimodal Traveler Info Washington to NC (I-95 corridor) US60/US17/VA143 & 199 Arterial Improvements East-West (I-64); Coastal (US17) I-95 Hard Shoulder Running Fredericksburg (I-95 corridor) Emerging Technology Statewide Effort Adaptive Signals

CALL TO ACTION 8