U.S. 63 Reconstruction Prebid meeting

Slides:



Advertisements
Similar presentations
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Advertisements

Jon Chiglo, PE Project Director 2014 Construction Plans.
Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Damien Barr, ARM-P, CRIS, CSE- Manager of Risk Management, Wisconsin Department of Transportation (608) Wisconsin Dept. Of Transportation 2010.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
“Get in, do it right, get out, and stay out.”
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Road work season begins Projects kick off in local counties May 19, 2012 By Jason Raiche - staff writer Daily
San Francisco-Oakland Bay Bridge West Approach Seismic Retrofit Project.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
BRIDGE CONSTRUCTION FORUM 2006 Work Window Restrictions.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
Madison Avenue Reconstruction Department of Planning and Development.
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
Public Meeting August 19, 2015 Williams Cr (Shoup Bridge) Replacement Project.
Delmar Boulevard bridge replacement over Interstate 170.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
BS0502 Flood Protection Erie Street Valve Chamber Platform TS-2575 Prebid Meeting – Technical Presentation May 8 th, 2013.
Pavement Preservation Pavement Sealing COS Pre Bid Meeting March 22, 2016.
M-99 (Superior St) Reconstruction Public Open HouseMarch 21, 2016.
Interstate 5 / Empire Avenue Interchange Project B-G-P Airport Authority – April 4, 2011.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
SR 518 Interchange Restoration Pre-Bid Meeting 4/28/16.
Thank you for bringing us to where we are
5th Street Bridge Replacement Project Contract No
Center City Connector 101.
June 26, 2017.
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
DICKINSON AVENUE RECONSTRUCTION
Pinole Valley High School (PVHS) Project Status
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Highway 169 Bridge Replacement & Pavement Resurfacing
Background – Pre Hurricane Dora
Year 2 Autumn Term Week 12 Lesson 1
City of Katy – Pine Forest Workshop Update
SR422 Section 29M, Berks Co. West Shore Bypass Reconstruction
PROJ. 566(17) LOR PID MAJOR WIDENING
Contract 60X10 Informational Meeting Weber I-55
Year 2 Autumn Term Week 12 Lesson 1
Calendar.
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
Commissioners Presentation
Metropolitan District | mndot.gov
Rail Program Management Services Review Grade Separation Recommended Ideas Palo Alto Rail Committee Meeting ……..
Guidance on Assessment of Liquidated Damages
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
Ward Park Restroom Timeline
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

U.S. 63 Reconstruction Prebid meeting Franklin Street to Newell Street in Waterloo June 1, 2017

Reconstruction Location Newell Street US 63 Franklin Street

Seven Projects-One Contract Franklin to Newell Projects: NHSX-63-6(75)—3H-07 (PCC Grade/Replace) NHSX-63-6(87)—3H-07 (Signals/Lighting) NHSX-63-6(90)—3H-07 (CC&P Overpass Bridge) NHSX-63-6(92)—3H-07 (Pedestrian RCB) NHSN-63-6(94)—2R-07 (Water Main) NHSX-63-6(96)—3H-07 (Temp dewatering, Subdrain, Groundwater Suppression System) NHSN-63-6(97)—2R-07 (Grading/Railroad Shoofly)

Franklin to Newell Reconstruction Focus of today’s meeting is construction along the existing CC&P Railroad underpass

US 63 Franklin Street to Newell Street Reconstruction Includes significant coordination with CC&P Railroad Company Essential that all aspects of DS-15055 are understood and followed Coordination with US 63 reconstruction Jefferson Street through Franklin Street Coordination with City of Waterloo Street Program (East 4th Street Resurfacing)

US 63 Franklin Street to Newell Street Reconstruction Detours Existing “soft” detour of US 63 through traffic in effect for this construction season (2017) Seven calendar day “hard” detour this fall for construction of temporary dewatering system (Estimating Proposal Site No. 1) “Hard” detour of US 63 allowed beginning March 5, 2018

CC&P Overpass Rendering

Significant Groundwater Issues Currently suppressing the groundwater table 15 feet Plans include temporary dewatering and shoring for constructing a new groundwater suppression system

Temporary Dewatering To be constructed in 2017 To be operated beginning November 15, 2017 (Estimating Proposal Site No. 2) Will maintain dry pavement during winter 2017/18 Will allow time for improvements prior to spring 2018

US 63 Reconstruction Plans include construction of CC&P railroad shoofly and partial removal of the existing CC&P bridge (including some piling)

CC&P Shoofly Construction Significant coordination with CC&P CC&P to perform portions of shoofly construction and removal Once shoofly is operational, DOT contractor to perform work within 45 calendar days (Estimating Proposal Site No. 3)

Other Work on CC&P ROW Refer to DS-15055 NHSX-063-6(90)—3H-07 bridge beams to be placed during 4 hour Absolute Work Windows All other work to be performed during Conditional Work Windows

Presentations Construction Staging Overview Craig Hunter, HDR Railroad Temporary Shoofly Shoring/Grading Emad Farouz, CH2M