ILC-CR-0004 Main Linac extension: Implementation status

Slides:



Advertisements
Similar presentations
A Capture Section Design for the CLIC Positron Source A. VIVOLI* Thanks to: L. RINOLFI (CERN) R. CHEHAB (IPNL & LAL / IN2P3-CNRS) O. DADOUN, P. LEPERCQ,
Advertisements

Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
A.Seryi, Oct. 26, BDS comparison and positron source A.Seryi October 26, 2005 Discussion of BDS and positron source is given in [1] “Comment on.
Update on ILC ML Lattice Design Alexander Valishev, for the FNAL LET group FNAL AP Dept. Meeting March 7, 2007.
ALCW15 Mike Harrison AD&I and Change Request status.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
4/23/2015ALCW15 : Accelerator / M. Woodley1 / 30 TDR lattice (2015a) review and status.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
10/9/2014LCWS14 : Accelerator : ADI / M. Woodley1 / 14 Status of ILC Decks.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
16 August 2005PT for US BC Task Force1 Two Stage Bunch Compressor Proposal Snowmass WG1 “It’s the latest wave That you’ve been craving for The old ideal.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Positron source beamline lattice Wanming Liu, ANL
Design options for emittance measurement systems for the CLIC RTML R Apsimon.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
October 23, 2007ALCPG07 Accelerator Physics (Simulations) Parallel Session1 ILC Lattice Descriptions: The Big Picture M. Woodley, SLAC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
N.Solyak, RTMLLCWS’08, Chicago Nov.16-20, RTML progress 2008 Nikolay Solyak.
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
Summary of Day1 of the Mini-WS and Santander Plan K. Yokoya CRWG 9, KEK 2016/4/19 MiniWS summary1.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
K. Yokoya CRWG, ECFALC2016, KEK
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
Specifications for Central Region Layout
ILC2016x 12/08/2016 LCWS2016 (Morioka, Japan).
ILC DR Lower Horizontal Emittance, preliminary study
Introduction and Meeting Objectives
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
LCLS2sc MAD files: Injector to Bypass Line
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
ILC Z-pole Calibration Runs Main Linac performance
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
Update on ILC ML Lattice Design
SC Quadrupole Magnets in ILC Cryomodules
LCWS2015 : Beam Dynamics / M. Woodley
RTML Design and Cost reduction Nikolay Solyak Fermilab
Alternate Lattice for LCLS-II LTU Y
Beam-Based Feedback in LCLS-II
AD & I : BDS Lattice Design Changes
Accelerator Physics Technical System Group Review
Cost Comparison of Undulator and e-Driven Systems
RTML and Main Linac Design (2.6.1 and 2.7.1)
ILC BDS Emittance Diagnostics: Design and Requirements
Kaoru Yokoya CRWG Meeting, Feb.2, 2016
01SEP17.
Electron Source Configuration
Extract from today’s talk given to DCB
PS2 Injection/Extraction Layout
Linear Collider Positron Source and Central Integration Update
Central Region Working Group
Emittance Diagnostics
ILC - Global Design Effort
Y. Nosochkov and M. Woodley (SLAC)
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

ILC-CR-0004 Main Linac extension: Implementation status Tuesday, November 3, 2015, 11:35 AM, 25 minutes 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley Overview the most recent “official” release of ILC lattice description files (MAD8 Extended Standard Input Format files), corresponding to the TDR, was made at ALCWS-2015 in April and designated “ILC2015a” https://bitbucket.org/whitegr/ilc-lattices goals of present work: implement Change Request #2 (CR02) … single 4.1 m L* for both detectors merge ILC2015a FF design with T. Okugi design … FF length increased by 11.64 m includes Change Request #6 (CR06) … IP BPM fix error in laser wire chicane length in BSYs … maintain identical e- and e+ systems BSY length decreased by 23.87 m photon path length (undulator exit to target) decreased by 12.23 m ~372 m to ~360 m 40 m drift space in e- system (d/s dogleg) to bypass target infrastructure implement Change Request #4 (CR04) … extension of Main Linac tunnels pLET system (pDR → IP) length increased by 2965.609 m (after changes mentioned above) part of length increase in pLTL, part between pBC2 and pML, the rest at the end of pML (before pMPSCOL) includes Change Request #10 (CR10) … BC1 and BC2 part of Main Linac path length difference (e-/e+) set to 10 x CDR FF offset got 28.5453 mm bigger (old: 1.6652 m; new: 1.6938 m) 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley LTL to turnaround match LTL FODO cells DR extraction turnaround BC2 to Main Linac match Return Line Main Linac Main Linac extension IP 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley e+ system changes for CR04 pLTL add 20 “RETURNCELLC” FODO cells after MARKer “M_8_cell_end” did NOT change FODO cell length (still 72.493 m cell length) add 32.939 m to “RTMATCH” beamline just upstream of turnaround rematch return line to turnaround pBC2 add 88.5 m to “BC2_ML_2” beamline (matching between pBC2 and pML) rematch pBC2 to pML pML inserted space for an additional complete 12-string (36 ML unit) cryo unit … details to follow pBSY shorten laserwire chicane from 76.9 m to 42.6 m shorten center drift from 11.5 m to 5.0 m replace eight (8) quadrupoles used to match to FF through polarimeter chicane old: length = 3 m, bore = 80 mm new: length = 2 m, bore = 12 mm rematch BSY to FF through polarimeter 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley LTL turnaround LTL FODO cells 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley LTL turnaround RTMATCH 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley kickers BC2 Main Linac BC2_ML_2 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley Main Linac BSY DUNIT1 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley positron Main Linac extended at downstream end (before MPS collimation) inserted space for an additional complete 12-string (36 ML unit) cryo unit include space for end boxes, service boxes, and warm drifts same quadrupole center-to-center spacing as Main Linac same cryo unit-to-unit spacing as Main Linac replace cryogenic quadrupoles with BDS “Q75L2000” magnets core length = 2 m, bore = 75 mm maintain Main Linac optics (β-functions) no additional cryomodules included (drifts, quads, BPMs, XCORs, and YCORs only) if populated with cryomodules, would provide an additional ~30 GeV of acceleration 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

From “TDR lattice (2015a) review and status” (ALCW-2015) https://agenda.linearcollider.org/event/6557/session/7/contribution/77/material/slides/1.pdf Recreating the TDR CFS geometry subsystems comments EBSY1 / EBSY2 PBSY1 / PBSY2 Redefinition errors discovered during “deck integration”: polarimeter chicanes were copied from *BSY2 to *BSY1 as separate laserwire detection chicanes names of elements (bends and drifts) were not changed names of parameters that defined bend and drift lengths were not changed values of parameters that defined bend and drift lengths were changed in *BSY1 files when *BSY1 file is loaded, LW chicane is 45.1 m long when *BSY2 file is loaded, LW chicane is redefined to be 76.9 m long (ΔL = 31.8 m) TDR CFS coordinates include BSY LW chicanes that are each 31.8 m too long PBDS was 0.95 m shorter than EBDS due to rematching between PBSY and PFFS, so: shorten PMPSCOL by 0.95 m and rematch modify PBSY2 such that EBDS and PBDS are now identical redefine TDR CFS coordinates for TPML2BDS Treaty Point (e+) to be symmetric w.r.t. IP with TPS2EBDS treaty point (e-) 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley MPS collimation FF kickers 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

From “Report of Global Timing Working Group” EDMS number: D00000001097725 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

From T. Okugi’s presentation at POSIPOL2015 ΔS = ±340 mm From T. Okugi’s presentation at POSIPOL2015 https://eventbooking.stfc.ac.uk/uploads/posipol/posipolokugi20150902.pdf 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

From “SB2009 Proposal Document” https://ilc-edmsdirect.desy.de/ilc-edmsdirect/file.jsp?edmsid=D00000000900425 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley Continuing Work MAD8 SURVEY tape-file output precision (10 digit) is too small for total LET (length > 32 km) … need to use sum(Li) for μ-level precision! investigate using MAD-X instead of MAD8 fix path length between kickers and septa in DR (127 μm + 32 μm = 159 μm error) make identical modifications to electron systems DR injection/extraction model space for 12-string (36 ML unit) cryo unit in eML FODO cells in eLTL add path length adjustment chicane in e+ source system Okugi-san’s chicane after booster linac (same location relative to booster linac) assume ±230 mm range (as specified in CR04) … set initially to +230 mm and readjust path lengths don’t move booster linac or include new energy compressor yet (Change Request) verify BSY laserwire chicane offset large enough for laserwire photon detection old (polarimeter) chicane offset was 20 mm … offset now is 8 mm don’t change eBSY fast abort line (requires further study) shift all Treaty Point coordinates to restore IP to origin (0,0,0) earth’s curvature following and vertical dispersion only if time permits release ILC2015b in 2015 (!) 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley Conclusions and Outlook implementation of CR-0004 is about 50% complete need to apply positron system modifications to electron systems need to add positron path length correction chicane need to shift coordinate system / Treaty Points to restore IP at origin (0,0,0) still hoping to finish in 2015! e+/e- path lengths now differ by exactly 10 x CDR (within 1 μm) there are sub-millimeter path length errors in DR Injection/Extraction layout to fix all changes (such as they are) will be available from the Lattice Repository (from the “dev” branch) ILC2015b to be next release 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley

LCWS2015 : Beam Dynamics / M. Woodley End Thanks! 11/3/2015 LCWS2015 : Beam Dynamics / M. Woodley