Why we need an improved LASER calibration system

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group 10th ICATPP Conference on Astroparticle,
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
FLASH Toroid Review Progress since last meeting in April Next steps Summary Johnny Ng FLASH Coll. Mtg. 7/25/03.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
NINO RO chip qualification with the laser test system Sakari and Fadmar.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
The ATLAS Tile Calorimeter: Commissioning and Preparation for Collisions Presented by Oleg Solovyanov On behalf of the Tile Calorimeter Collaboration of.
Timing Counter Report of Feb. 14 th, 2007 P.W. Cattaneo.
Pavel Šťavina, Bratislava 2004 Slovak contribution to experiment ATLAS  Even though Slovakia is small country with limited finances we have fulfilled.
David BAILLEUX US CMS on behalf of the Caltech group Laser Monitoring System - Electronics review 20 March Overview Overview Laser control Laser.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
CAL CALIBRATION Overview and Stability Thomas Schörner-Sadenius Hamburg University ESCALE Meeting DESY, 7 June 2005.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
PMT Calibration Bryan Musolf. Goals Transform raw data into graphs for 30 PMTs Observe how the gain and # of photoelectrons (PE) change as a LED intensity.
CMS ECAL Laser Monitoring System Christopher S. Rogan, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Calibration of the PHENIX Lead Scintillator Calorimeter H.Torii for the PHENIX Collaboration Kyoto Univ./RIKEN Contents Lead Scintillator Calorimeter(PbSc)
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Calorimeter calibration -Initial calibration -Gain following -Archiving.
ATLAS Tile Hadronic Calorimeter:
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
The ATLAS Tiles Hadronic Calorimeter
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Calibration of energies at the photon collider Valery Telnov Budker INP, Novosibirsk TILC09, Tsukuba April 18, 2009.
Calibration and monitoring of the ATLAS Tile Calorimeter
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
The ATLAS Tile hadron calorimeter The ATLAS Tile hadron calorimeter Ana Henriques/CERN on behalf of the ATLAS collaboration ANIMMA 2015, April Content:
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
Muon Detectors Tile Calorimeter Liquid Argon Calorimeter Solenoid Magnet Toroid Magnets 46m 22m SemiConductor Tracker(SCT) Pixel Detector Transition Radiation.
Sensitivity of HO to Muons Shashi Dugad for HO group India-CMS Meeting 6-7 Oct
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
Laser System Status and Plans November 20 th, 2008 R.Febbraro / S. Viret LPC TileCal Operations 1. Diode 4 study 2. Stability preliminary results 3. Next.
 13 Readout Electronics A First Look 28-Jan-2004.
Discussion on the integrator specifications with comparison of the 3 options Debriefing meeting at LPC, 28 April 2016 François Vazeille  Summary of the.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
TileCal EM scale status Irene Vichou University of Illinois at Urbana on behalf of TileCal Collaboration MPI Hadronic Calibration Workshop May 3 rd, 2006.
PreShower Characterisations
Practical advices for using TCT (mostly for Particulars setups)
Minimum Bias Trigger Scintillators
Upgrade activities at Clermont-Ferrand
Using diode laser for atomic physics (I)
HF Test station at P5 A.Mestvirishvili.
A First Look J. Pilcher 12-Mar-2004
CMS ECAL Calibration and Test Beam Results
Dual-Readout Calorimeter: DREAM
Instrumentation for Colliding Beam Physics 2017
Correction of saturation effect of ICCD
Status of the Crystal Ball
New developments in photodetection
MEG II実験 液体キセノン検出器の建設状況
Presentation transcript:

Why we need an improved LASER calibration system

TileCal calibration system

The Laser box Q-switched DPSS (diode-pumped solid state) LASER The laser box is the control system for laser: Monitor of the laser light intensity Attenuate the light intensity according to needs Provide the trigger to DAQ corrected for laser time jiitter Laser is used for: Monitor PMT stability Measure PMT linearity Monitor PMT stability during LHC stacks

Beam expander (light distribution) This system should deliver a fixed and constant fraction of laser light to each Drawer (48 PMT) But The light sent to PMT is not stable in time. The monitoring of PMT stability becomes problematic. A new system has been designed in Pisa.

Instabilities of the present system Drift of laser with time Instability of channels connected to a clear fibre from the patch pannel

Diffusive sphere (being tested in our lab) Light OUT (clear fiber bundle) Light IN (liquid fiber) This system would provide a stable distribution of light to PMT but at the price of Large inefficiencies. We would need a Laser more powerful than what we have.

The stability of PMT gain (the Pisa method) The method developed in Pisa exploits the distribution of photoelectrons, a well known technique: (e electron charge, f excess noise fraction) In our case the coherence of laser light makes it substantially more complicate: the linear relation between V/E and E in the case of coherent laser light, for two value of K, is shown in figure. We need to measure K and G in all PMT

Gain stability This is an example of time evolution of PMT gain. The statistical precision of the gain is better than 0.5%. This method, developed in Pisa is the most precise to follow the evolution of PMT gain since it is insensitive to changes of laser light. With this procedure we can follow the evolution of Calorimeter response in between Cs scans. With Cs scans we have a very precise and careful measure of the e.m. scale of the detector, but the scans are rather invasive and can be run only in shutdowns.

Saturation (I)

Saturation (II)

Set up a new sistem to be tested in bat 175 at CERN (CERN, LIP,Clermont, Pisa) New laser: better intensity and time stability: Cost 40000 (Pisa contributes with 10000) New light mixer (Pisa, LIP) New patch pannel to distribute light (LIP) New light control system with diodes (Clermont) The set-up should be ready by summer 2010 Tested in 2010 and 2011 and installed during the 2011 shut down.