Emergency Planning 101 A Regulatory Review & Tips for Getting Started

Slides:



Advertisements
Similar presentations
Emergency Preparedness and Response
Advertisements

Disaster Planning What Supervisors Need to Know. Session Objectives You will be able to: Recognize the types of workplace disasters you may face Understand.
Emergency Planning and Community Right to Know Carter Hanson / Patrick Cudahy 2011.
29 CFR Hazardous Waste Operations and Emergency Response (Hazwoper) Presented By: Etech Environmental & Safety Solutions, Inc.
A Brief Overview of Emergency Management Office of Emergency Management April 2006 Prepared By: The Spartanburg County Office of Emergency Management.
Key Federal Reporting Requirements Material/ Statute RegulationsIncidentReport to/byReporting Air Emissions (Clean Air Act) 40 CFR 63.10(d)Start up, shutdown.
Prepare + Prevent + Respond + Recover + Mitigate Louisiana State Police Emergency Services Unit.
EPCRA Emergency Planning and Community Right-to-Know Suzanne Powers
Superfund Amendments & Reauthorization Act (SARA TITLE III) OR Emergency Planning & Community Right-to-Know Act (EPCRA) Presented by Ian Ewusi IERC Field.
Fall “To the extent that a grant is used to train emergency responders, the State or Indian tribe shall provide written certification to the.
Part 5 Rules Spillage of Oil and Polluting Materials Tracy Kecskemeti DEQ Water Bureau Southeast Michigan District Office
Hazardous Materials Incidents by Chris Hawley
Roundtable on Security & Terrorism - Industry Perspective M. J. Garrett, CIH Manager - Corporate Safety Carolinas HealthCare System Spring Meeting Carolinas.
Risk Management Program Quality Assurance Program Plan David R. Taylor US EPA Region 9 Quality Assurance Office.
California Accidental Release Prevention Program California Accidental Release Prevention (CalARP) Program.
Erika White September 11,  1984: Methyl isocyanate release at Union Carbide in Bhopal, India - 2,000 immediate fatalities  1985: M ethylene chloride.
Virtual Environmental, Health & Safety Manager Compliance Management System T. Cozzie Consulting, Inc. telephone
Solano County Department of Environmental Management Environmental Health Services Division Hazardous Materials.
EPCRA1 The Emergency Planning and Community Right-to-Know Act (EPCRA) The Emergency Planning and Community Right-to-Know Act (EPCRA)
Oregon State Police Office of State Fire Marshal Emergency Planning & Response Section An Overview of the Superfund Ammendment & Reauthorization Act (SARA)
Presented to: RETA National Conference – Atlanta November 5, 2014 If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us.
Hazards Analysis. The Next 55 Minutes... l Overview of Hazards Analysis l Scenarios for EPCRA and RMP l Resources.
EPCRA BACKGROUND EPCRA 301 Toxics Release Inventory (TRI)(Form R)/ RMP (Risk Management Program) Federal Forms Tier Two Oreg on has HSIS.
Tim Date, Manager Risk Management Planning Unit
ISAT 422: Environmental Management Disasters and Right to Know n Unlike OSHA, focus is on non-employees – Neighbors in community – Emergency responders.
Overview of the Emergency Planning and Community Right to Know Act Southern Plains Area USDA/ARS.
GW Lupton, Management Analyst Risk Management Planning Unit State Emergency Response Commission Risk Management Plan: Protecting the Community Florida.
State Emergency Response Commission SERC January 5, 2009 TENNESSEE EMERGENCY MANAGEMENT AGENCY.
Clean Air Act Section 112(r) Federal Program Update U.S. EPA Pacific Southwest Region Emergency Prevention and Preparedness February 15, 2007 CUPA Training.
Solid Waste Laws. Federal Legislation RCRA (1976)- The Resource Conservation and Recovery Act) CERCLA (1980) –The Comprehensive Environmental Response,
Who? What? Why? How? Each year, more than 1400 hazardous chemical emergencies are reported in Missouri.
Emergency Planning in your business St. Louis City LEPC General Meeting September 4, 2013.
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
Preventive Emergency Planning Emergency Plans should focus not just on response but on reducing risk Emergency Planning that focuses on risk should consider.
Florida Accidental Release Prevention and Risk Management Planning (ARP/RMP) Act State Emergency Response Commission Preparing for Facility Risk Management.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 18 Environmental Law.
Spill Response Plans 1 Aaron W. Martinez Pipeline Safety Specialist NuStar Energy L.P.
HAZWOPER: Awareness Level 29 CFR (q). Headline Stories Ammonia Evacuates Industrial Site Acid Spill Sends Workers to Hospital Fuel Spill Contaminate.
Denise Imbler, Program Administrator Florida Hazardous Materials Planning and Prevention Program
Bill Pippins Michael White Regional Planner/ Trainer.
Hazardous Materials Business Plan Training Topic 2
Mark Hyland, Operations Director, Maine Emergency Management Agency.
A Brief Overview of Emergency Management Office of Emergency Management September 2004 Prepared By: Marybeth Solesbee, CEM.
Environmental Regulation.  Complex set of laws  Constantly changing  Cover: Release, treatment, storage and disposal of Hazardous materials Into air,
Consulate Emergency Response/Contingency Plan Training Topic 4
Michelle Merrington Kelsey Bardsley. What is EPCRA?  Gives the public the right to know and receive information on chemical spills or accidental releases.
TIER 2 REPORTING Bernardine Zimmerman TIER 2 CHEMICAL REPORTING PROGRAM or
Emergency Planning and Community Right-to-know Reporting Kathleen LeGreid - Environmental Protection Agency EPA EPCRA (Emergency Planning Community Right-to-know.
© BLR ® —Business & Legal Resources 1603 Disaster Planning What Supervisors Need to Know.
Hazardous Materials Incidents by Chris Hawley CHAPTER 1: Laws Regulations and Standards.
Hazardous Waste.
Spill Prevention Control & Countermeasure (SPCC) Annual Training
CO Chemical Safety Workshops for Regulated Facilities
Lecture (13): Hazardous Waste Management
North Carolina Hazardous Materials Regional Response Teams
Consolidated Emergency Response/Contingency Plan Training Section 4
Coordinating with Station Emergency Response Agencies
“Science and Safety in our Schools”
Local emergency planning committee 101
Hazardous Materials: Ch01
Why do you have to report?
Spill Prevention Control and Countermeasures
The Emergency Planning & Community Right-To-Know Act
Chemical Facility Anti-terrorism Standards
Emergency Planning and Community Right-to-Know Act (EPCRA)
Solano County Department of Environmental Management Environmental Health Services Division Hazardous Materials.
Environmental Protection Agency
Why EPCRA ? Key hazardous chemical releases Increased public concern
FIRE/ EXPLOSION/ BOMB THREAT QRC
CRISIS MANAGEMENT PLAN
Presentation transcript:

Todd Dresser, CHMM, TURP Todd.Dresser@esis.com 603-921-0913 Emergency Planning 101 A Regulatory Review & Tips for Getting Started Todd Dresser, CHMM, TURP Todd.Dresser@esis.com 603-921-0913

Fertilizer explosion West, TX- 15 Dead, including 12 firefighters Why are we here? Fertilizer explosion West, TX- 15 Dead, including 12 firefighters

My facility won’t effect anyone else. West, TX – April 2013

Is this a local concern? Danvers, MA

What are the Requirements? EPCRA & SARA Title III RCRA Oil Pollution Prevention Act (SPCC) CFATS – Chemical Facility Anti-Terrorism Standard CAA – Risk Management Program OSHA – Process Safety Management Standard* MA Hazardous Materials Processing* Regulation

EPCRA – Emergency Planning & Community Right to Know Requires facilities storing materials in excess of Threshold Planning Quantities (TPQs) – typically 10,000 lbs to file annual Tier II with local emergency responders. Lower TPQs (e.g. 100 to 500 lbs) for extremely hazardous substances (EHSs – chlorine, AA, HF) EHS facilities must work with LEPC & FD to develop emergency response plan. Tier II filers are expected to support and participate in LEPC/REPC. Provides broad authority to LEPC/FD to request information to support local planning effort.

RCRA – Resource Conservation & Recovery Act LQGs are required to develop a Contingency Plan and share it with local emergency responders. LQGs are now required to work with local responders to develop a site pre-plan. SQGs are encouraged to develop a Contingency Plan and share it with emergency responders.

Oil Pollution Prevention Act Facilities that store more than 1320 gallons of petroleum on site are required to develop a Spill Control & Countermeasures Plan (SPCC Plan). Regulated sites must initiate control measures to prevent the release of petroleum. Site must identify and train response staff. Site must identify off site resources to provide spill response when needed. Site is required to conduct monthly inspections.

Chemical Facility Anti-Terrorism Standard Facilities storing specific materials above planning threshold are required to report and screen their facility for risk using Homeland Security protocol. Facilities deemed a risk may have to complete more in depth screening or may be inspected by Homeland Security. Sample materials of concern: anhydrous ammonia, chlorine, propane

Clean Air Act – Risk Management Program Facilities that store respiratory toxins (e.g. chlorine or anhydrous ammonia) above planning thresholds must prepare RMP plan. RMP plan will include a comprehensive review of the facility, identify control or mitigation measures, requires the preparation of a worst case and realistic release scenario. These facilities can pose major risks that can impact square miles.

OSHA – Process Safety Management Standard Facilities that store or use specific flammable or toxic materials on site usually in excess of 10,000 lbs are required to develop a PSM plan. The standard requires the facility to conduct a comprehensive hazard analysis and to initiate control measures to mitigate the risk posed by site operations. These facilities can pose a major hazard. These sites should actively coordinate with local responders to develop a training and response plan.

MA Hazardous Materials Processing Standard Most businesses using hazardous materials are now required to provide process information to local responders & obtain a permit from the FD. This standard applies OSHA PSM type requirements on facilities that have tanks/containers with a volume of 300 gallons. Grants broad authority to FD to seek information for planning purposes. Requires facilities to work with FD to develop an emergency response plan.

Leveraging Regulations to Collect Information Create review checklist for use during site plan or permit review process. Ask applicant if any of these requirements apply to their operation. Require a written response. Hint: Also ask for a copy of their chemical inventory to compare. Require applicants to provide copy of their response plans and to work with responders to develop pre-plan. Remember state & federal agencies will help if sites are unresponsive.

The Following Municipal Facilities Are Often Subject to these Regulations Highway Garage Drinking Water Plants Wastewater Plants Ice Rinks Municipal Pools Motor pool/fleet operations Grounds/field maintenance Airports Port Authorities

Goals for Pre-planning Identify & address historic problem areas. Identify & plan for likely scenarios. Collect & organize the info you would need if these events occur.

Things to Consider Process or system upset Structural failure Transportation release Problems caused by loss of power or water External impacts Potential for run away reactions Weather induced problems Issues causing greater concern during a fire

Use the 80/20 Scale Focus on what you can manage. Work through scenarios for 3 most likely problems. Inspect, maintain, repair or upgrade your equipment. Develop procedures and train staff to support effort. Review, practice and update procedures. Drills help alleviate the mental fog that can occur in a crisis.

Coordinating with Emergency Responders Invite the fire dept. to tour your facility. Share your Contingency Plan. Make the most of your Knox box. Create a Pre-plan Review high hazard/critical processes or storage areas. Label and photograph these areas. Do you need specialized medical support Cyanides, Hydrofluoric acid or others? Consider a drill.

Prepare a Pre-Plan Identify critical do’s & don'ts's Establish incident command and notification procedures. Identify safety controls to be maintained. Plan for 3 likely potential problems. Identify potential external impacts - develop notification or response procedures for these receptors. Train staff Review plan with emergency responders.

Sample Pre-Plan

Critical Questions

Process Descriptions & Scenarios

Materials of Concern

Shutdown Procedures Insert photos of the process controls and storage containers into the plan to assist responders.

Potential Offsite Impacts

Locus Map for Reference

Plant Schematic

Critical Chemical Info

Insert Your Logo Here????

Questions?? Todd Dresser, CHMM, TURP Todd.Dresser@ esis.com 603-921-0913 https://www.linkedin.com/todddresser