Technical Operations and R&D at JIVE

Slides:



Advertisements
Similar presentations
E-VLBI down-under Tasso Tzioumis ATNF, CSIRO July 2005 Towards e-VLBI.
Advertisements

Onsala Space Observatory Present status and technical directions of the EVN Michael Lindqvist Onsala Space Observatory, Sweden Arpad.
ASKAP Central Processor: Design and Implementation Calibration and Imaging Workshop 2014 ASTRONOMY AND SPACE SCIENCE Ben Humphreys | ASKAP Software and.
First e-EVN Science and Future Astronomy projects via EXPReS Michael Garrett Joint Institute for VLBI in Europe e-VLBI Workshop, Sydney, 13 July 2005.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
DBBC3 Development - Digital Base-Band Converter 3
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Recent eVLBI developments at JIVE Arpad Szomoru Joint Institute for VLBI in Europe.
A Proposal Constructing mm/sub-mm VLBI Network by East-Asian Power M. Miyoshi (NAOJ) EAVN Symposium Hokkaido Univ. 2015/07/10 1 Oct VERA
VLBI/eVLBI with the 305-m Arecibo Radio Telescope Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman Jon Hagen.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
Prof. Steven Tingay (ICRAR, Curtin University) Workshop on East-Asian Collaboration on the SKA Daejeon, Korea, November 30 – December 2, 2011 A long baseline.
E. Momjian, T. Ghosh, C. Salter, & A. Venkataraman (NAIC-Arecibo Observatory) eVLBI with the 305 m Arecibo Radio Telescope ABSTRACT Using the newly acquired.
TOG, Yebes, November 2007, A. Szomoru, JIVE Arpad Szomoru, JIVE EXPReS progress, Mark5 and e-VLBI.
NEXPReS Period 3 Overview WP8 FlexBuff High-Bandwidth, High-Capacity Networked Storage Ari Mujunen Aalto University Metsähovi Radio Observatory Finland.
EVN Performance and Reliability Iván Agudo. Collection of Highlights A large improvement of the EVN in terms of new stations & sensitivity! First fringes.
SA1: second year overview Arpad Szomoru JIVE January 30EXPReS Board Meeting, Utrecht, the Netherlands: SA1Slide #2 Outline Accomplishments in 2007.
NEXPReS Period 3 Overview WP5 Cloud Correlation Arpad Szomoru, JIVE.
NEXPReS Period 3 Overview The hunt for 4Gbps fringes Or, may the fringe be with you Or, nothing like living on the edge Arpad Szomoru, JIVE.
EXPReS FABRIC meeting at Poznan, Poland1 EXPReS FABRIC WP 2.2 Correlator Engine Meeting Poznan Poland JIVE, Ruud Oerlemans.
WP7: Computation in a shared infrastructure Mark Kettenis JIVE Presented by Norbert Meyer PSNC.
TOG, Torun, April 2009 Arpad Szomoru, JIVE EVN/JIVE Technical developments.
EVN Amplitude Calibration Iván Agudo. Quality of Calibration EVN Amplitude Calibration, Iván Agudo (JIVE) EVN TOG Meeting, Cagliari, Italy,
NEXPReS Period 3 Overview WP2 EVN-NREN Richard Hughes-Jones, DANTE.
The UniBoard a RadioNet FP7 Joint Research Activity Arpad Szomoru, JIVE.
NEXPReS WP5 - Cloud Correlation Work Package Overview Arpad Szomoru JIVE.
SA1: Production e-VLBI service Period 2 Overview Arpad Szomoru JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO),
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,
TOG, Dwingeloo, March 2006, A. Szomoru, JIVE Status of JIVE Arpad Szomoru.
SA1: technical progress
SA1: overview, first results
RFI Protection Activities in IAA RAS
Korea Astronomy and Space Science Institute
RFI Protection Activities in IAA RAS
e-VLBI: Creating a Global Radio Telescope via High-Speed Networks
Mark 5 / VLBA Correlator Topics
EXPReS, NEXPReS, UniBoard
RadioNet FP7 Joint Research Activity
The UniBoard Generic Hardware for Radio Astronomy Signal Processing
The UniBoard A RadioNet FP7 Joint Research Activity, 9 partners
EVN TOG-meeting Onsala Space Observatory
SA1: Production e-VLBI service
Tao An (SHAO) & Zsolt Paragi (JIVE) et al.
EVN Performance and Reliability Jun Yang, JIVE 4 Dec, 2009
The Development of Broadband VLBI Technologies in SHAO
JIVE UniBoard Correlator (JUC) Firmware
UniBoard2 applied in the Square Kilometer Array
EXPReS Annual Review April 17
Arecibo (JIVE/EXPReS +)
Alan R. Whitney MIT Haystack Observatory
e-EVN: practical considerations
Observational Astronomy
Observational Astronomy
The 40m YEBES RT and the HSA
SA1: third year overview
VLBA Correlator Interfaces for VSOP-2
The Uniboard  FPGA Processing for Astronomy
Wide-field, high sensitivity VLBI
EVN Amplitude Calibration Jun Yang, JIVE
UNIBOARD : VLBI APPLICATION CHARACTERIZATION
The e-EVN Arpad Szomoru, JIVE.
Project of Direct Sampling Digital Backend for Quasar VLBI-network
Correlator Growth Path
DBBC Stutus Report November 2007
Nataliya Zubko, Jyri Näränen, Markku Poutanen
Jumping JIVE is an ambitious series of initiatives
Technology and the Future of the EVN
Presentation transcript:

Technical Operations and R&D at JIVE Arpad Szomoru, JIVE

Mark5, SUs, MarkIV correlator Mark5, general New Linux kernel + newest SdK would break e-VLBI Has been investigated by Paul Boven Fixed by Conduant Still some minor issues with SdK9.4 Finally upgrade to non-antique Linux version! (Wheezy) Mark5B/C 2 units permanently converted to B 1 extra unit currently B+, 6 C units in place 1 C unit on loan to Yebes 1 C unit on loan to Torun for DBBC verification MkIV Correlator Gone! Correlator boards sent to Hawaii

Jive5AB Jive5ab has taken over most operational VLBI in EVN No major show stoppers, mishaps Much development ongoing

e-status Full 1024 Mbps available from most stations Ef, On, Nt, Mh, Hh, Tr, Ys using DBBCs operationally Mc doing tests Jb received DBBC Channel dropping possible when needed (except Ar) Ar still at 512 Mbps Irbene: full EVN member in 2015? Still attempting to bring e-Merlin back into array

SFXC Correlator Used for all EVN operations, both recorded and real-time: e-VLBI with 13 stations at 1024 Mbps Coherent de-dispersion Multiple phase centers in real time! Primary beam shape determination: Beams from Ef, On, Bd, Sv, Ys Single map from Tr More needed!

SFXC Hardware 40 nodes; 384 cores (Intel Xeon 5500/5600/E5-2600) QDR Infiniband interconnect (32 Mbit/s) 8 nodes with 10 GbE (currently limited to 20 Gbit/s total) 13 stations @1Gbit/s real-time (with cross-polarisations)

SFXC Correlator: phasing up the EVN Phased array mode Coherent summing of signals Mult. phase center capability for phased array mode under development Implementation at KVN

UniBoard and beyond UniBoard-based EVN correlator UniBoard2 Can now accept data from Mark5, FlexBuff Interesting problems remain Two UniBoards at JIVE 32 stations at 1 Gbps Or 16 at 2 / 8 at 4 Project review took place in September Very positive feedback from panel UniBoard2 Prototype will use 20nm FPGA technology Some (or all?) production boards with 14nm (pin compatible) Main board, optimized for use as AA-low beam former Full mesh, Hybrid Memory Cubes and QSFP+ cages on break-out board Tender has been issued, manufacturer selected

Joint EVN – LBA observations Arpad Szomoru, JIVE

Some history 32 hour real-time (near-) continuous e-VLBI demo Involving telescopes in Australia, Japan, China, Europe, the Americas At opening of IYA2009, Paris Led to three-epoch observations by Giroletti et al. Then, nothing (not known, not supported,….)

Why bother? NEXPReS has finished For time being, no formal collaboration between JIVE + EVN and LBA, CSIRO, AARNET New Zealand looking at refurbishing 32m telescope Obviously working together with Australians But how to get them involved in world-wide VLBI? SKA looming on horizon, eating up radio astronomy VLBI will remain important, considering what baseline design looks like But have to showcase this importance Be global, connected, active, transparent LBA already observes regularly with some EVN stations

Science case (?) Left: source at Dec 0 (RG001) 17 hours in total Longest N-S and E-W baselines with different telescopes Right: source at Dec -10 (now includes Ar) 19 hours in total

Science case (!) SGRA* High frequencies preferred, KVN perfect for this

And now Board approved collaboration In call for proposals Until now, one very good candidate, did not ask for joint observations though Not sufficiently known in community?

Towards 2 - 4 Gbps operations Arpad Szomoru, JIVE

Status Current Problems: Recording media Common LO setting DDC mode needed! Lack of FS support To do: Test DDC mode Find solution for FS Buy FlexBuffs/Mark6 Test Jive5AB on Mark6 Aim for 2Gbps for now (VLBA, CDAS, R1002)