Mock-up and integration status

Slides:



Advertisements
Similar presentations
STREGA C1:Cryogenic Last Stage Suspension (10 MIN) Task -C1: thermal conduction investigation of final stage suspension; This part of the suspension system.
Advertisements

STREGA C2:Cryogenic suspension system for advanced resonant detectors (5 MIN) Task -C2: development and construction of advanced cryogenic system for resonant.
The application of GEANT4 simulation code to the verification of a brachytherapy calibration procedure F. Foppiano 1, S. Garelli 1, P. Moresco 1, G. Paoli.
The application of GEANT4 simulation code to the verification of a brachytherapy calibration procedure F. Foppiano 1, S. Garelli 1, P. Moresco 1, G. Paoli.
Torino Exploiting commercial CMOS technologies for:  detection of Minimum Ionizing Particles for High Energy Physics experiments  direct detection.
Luca Stanco – INFN - Padova22 September Significance of TAU observation in OPERA Questions to OPERA: 1. Does it exist the  –  oscillation ? 2.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Analyses of Triangular Die with a Hole ToNICADD-FNALBy Praveen Reddy and Meung Kim ME, NIU.
CERN – March 10, 2006TAN Installation Workshop - The LHCf experimentOscar Adriani The LHCf experiment Measurement of Photons and Neutral Pions in the Very.
BAND-GEM Istituto di Fisica del Plasma, IFP-CNR – Milano
Stereo microscope – 5.4% air manual mm spacing manual.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
Test Configuration for Control For the test configuration we used a VME based control system, constituted by a VME crate with a VMPC4a from Cetia (CPU.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 31/8/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto.
Automated Reconstruction of Industrial Sites Frank van den Heuvel Tahir Rabbani.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
20to2T5m100cm Images Van Graves February 13, 2014.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Brick gas tightness & emulsion-lead compatibility Opera Collaboration Meeting Hamburg, June 2004 F.Laudisio, G.Romano, C.Sirignano Salerno Emulsion.
FP6−2004−Infrastructures−6-SSA Interconnection & Interoperability of Grids between Europe and China the EUChinaGRID Project F. Ruggieri – INFN Project.
A GRID solution for Gravitational Waves Signal Analysis from Coalescing Binaries: preliminary algorithms and tests F. Acernese 1,2, F. Barone 2,3, R. De.
Hadronic interaction studies with the ARGO-YBJ experiment (5,800 m 2 ) 10 Pads (56 x 62 cm 2 ) for each RPC 8 Strips (6.5 x 62 cm 2 ) for each Pad ( 
External micro-PIXE analysis of the metal deposition on a CMS pitch adapter M. Massi, L. Giuntini, M.E. Fedi, C. Arilli, N. Grassi, P.A. Mandò, A. Migliori,
Survey techniques for experiments and advanced 3 D Digital Reconstruction Aurelie Maurisset, Christophe Bault, Andrea Catinaccio October 1 st 2010 Ref.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
9th July 2009Christophe BAULT1 REVERSE ENGINEERING: TEST OF CATIA CMS Tracker mock-up scanned with Faro Laser Scanner CMS Tracker mock-up scanned with.
LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA Dimensions of 1 iron brick  100 x 100 x 200 mm3 1 ROW of 1200 mm length  12 iron blocks.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
EUChinaGRID project Federico Ruggieri INFN – Sezione di Roma3 EGEE04 - External Projects Integration Session Pisa 25 October 2005.
Measurements of DB supporting systems Fiducialisation Sylvain GRIFFET, 21/03/2011 Measurements performed in February and early March /13 EDMS n°
SiO x coated fiber optic sensor for gas monitoring in RPC S. Grassini 1, M. Parvis 2, M. Ishaiwi 2 1 Dip. di Scienza Applicata e Tecnologia 2 Dip. di Elettronica.
By Jan Haas. Overview 1. Gravitation as a wave 2. Weber bars 3. Laser interferometers 4. LISA.
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
CMS Muon detector from LHC to HL-LHC Pigi Paolucci INFN Napoli 1P. Paolucci (CMS group of Napoli) - Jan 2015.
Danilo Domenici – LNF. Detector Upgrades Overview CSN1 - 4 Maggio 132 Inner Tracker QCAL CCAL.
Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 General.
Stave thermal analysis Cooling connections CO2 warm Test
Feedback on transfer line sizing and flow calculations for UT
Integration and Services RE3/1 and RE4/1
Integration and Services RE3/1 and RE4/1
new straw end plug: D=10.6 mm straws support frame Levan option
YE2 – YE3 distance Manual measurements
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
T1 status (a selection from EDR presentations)
Results of an Airborne LiDAR survey between Teignmouth and Sidmouth
  1. Michele Iacovacci, Università (PA) & INFN – Napoli. FTE: 40% – Experiments:, Past: ARGO-YBJ (Tibet, Cina) – search for VHE.
WP 4 CERN Nov 2, 2009.
Chamber Design and Integration RE3/1 and RE4/1
ELiTES The European-Japanese collaboration in Gravitational Wave research Dr. Michele Punturo Istituto Nazionale di Fisica Nucleare (INFN) European Gravitational.
update on UT cooling system
HPL DG d=1.4mm/e= mm.
TO LOW ENERGY NEUTRONS AND TO LOW ENERGY NEUTRONS AND
FocalSpec Ltd High precision 3D and tomographic imaging sensors and systems Unique world wide patented Lateral Chromatic Imaging (LCI) technology Laboratory.
Tuesday 22nd January - morning
Transfer Line and CSC Rφ Reconstruction
DESIGN OPTIONS FOR ORBIT CORRECTORS IN D2 and Q4
Phase 2 R&D – Brief Introduction –
Pierluigi Paolucci & Giovanni Polese
RPC SYSTEM LAYOUT and DIMENSIONS
Cosmic ray test of RPC for the ATLAS experiment
Indoor 3D Reconstruction from Laser Scanner Data
-·.-...-· A. -.. ) ,.,.. -.,., · o# --·'1>,.. ·-·-. ·-· ;'/' : ,.,. - ' p ·-·- ·-- 'II"; -.-. t-.. p
Pierluigi Paolucci & Giovanni Polese
Optimization of the LiDAR optical design for measurement of the aerosol extinction vertical profile. Alessia Sannino *1, Antonella Boselli 3, Gaetano Sasso4,
Microscan3 Core – Technical Addendum
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

Mock-up and integration status 1,2 E. Voevodina, 3 I. Crotty, 2,3 S. Buontempo, 3B. Smiljkovic  1 Universita Federico II di Napoli, 1-80125 Napoli, 2 Istituto Nazionale di Fisica Nucleare (INFN), Sezione di Napoli, 3 European Organization for Nuclear Research, Geneva (Switzerland) RPC Upgrade Working Meeting RPC, 21 February 2017

3 methods to determine the value "Z" for RE3/1 1. Survey using laser scanner and laser tracker; 2. Manual measurements; 3. IR - sensors.

Analysis Data from Laser Scanner 19th of December 2016 Results of Scanning of Space between YE/-2 and YE/-3 for RE-3/1 in P5 ME-3/1/13 Extract of YE-2 point cloud, around CSC chamber ME-3/1/13 The average error is +/-1.8 mm; The max. error is +/-3.0 mm Extract of YE-3 point cloud, surface in front of CSC chamber ME-3/1/13 Neutron shielding RE -3/2

Analysis Data from Laser Scanner 10th of January 2017 Results of Scanning of Space between YE/+2 and YE/+3 for RE+3/1 in P5 Extract of YE+2 point cloud, around CSC chamber ME+3/1/13 The average error is +/-2.5 mm; The max. error is +/-3.0 mm Inspection of the positions of the M12 holes Extract of YE+3 point cloud, surface in front of CSC chamber ME+3/1/13

Scan YE/-2 Scan

Scan YE/-3

Manual measurements YE/-2 YE/-3 Collar

Results from manual measurements Principle scheme of the manual measurements in the CSC chamber Nuances of the CSC chamber design

Results from manual measurements Principle scheme of the manual measurements Available space for RE3/1 between ME3/1 and YE3 is about 80 mm including the clearance between mobile elements

Results from IR - sensors * IR sensors was installed in 10th of January 2017 Results will be come later

Conclusion Results from available from laser scanner and manual measurements; Discrepancy between manual measurements and 3D model / laser scan; Laser scan will check on afternoon; Initial results from IR- sensors will be do this week.