Current status and next steps

Slides:



Advertisements
Similar presentations
1 Vendor Reverse Auction - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines.
Advertisements

A Proposed Model for GV Express October 2008 RED version.
Assistive Technology Procedures Umatilla Morrow ESD.
Designing Basic Web Sites II: Process Based on Web Style Guide, Lynch and Horton Technical Communication.
NeSSI™ Knowledge Network Dave Veltkamp, CPAC. Overview and Goals New NeSSI™ discussion board/information web site Manage NeSSI™ mailing list through user.
WebCT CE-6 Assignment Tool. Assignment Tool and Assignment Drop Box Use “Assignment” button under Course Tools (your must be in “Build” mode) to: –Modify.
Process, Communication, and Certification Padma Venkata
1 Vendor RFI - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
PDF Wikispaces Blogging PBWorks You are now ready to cut the red ribbon and unveil your project to your intended audience.
Gasoline and Diesel Event User Guide. Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
OJT 2. 50% Coding Defense  Dec (schedule to be posted soon)  Start of user’s manual.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
Deliverable Readiness Review LexEVS 5.1 December 17, 2009.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
INFSO-RI NA2 Status Update ETICS2 second AHM Isabel Matranga Engineering Ingegneria Informatica SpA Darmstadt, February 2009.
1 TRI-MEweb: The Future Is Now Juan Parra Washington DC November 3, 2010.
Online Tech Support Web Forum For F.B.I.S.D By: Team X-Velocity.
Mark Dixon 1 Tech – Introduction. Mark Dixon 2 Module Aims give you experience of: –The Software Development Lifecycle Analyse (of Problem / Application.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
INFSOM-RI WP NA2 Dissemination, Training and Certification Isabel Matranga Engineering Ingegneria Informatica S.p.A. ETICS 2 Kick.
Project 1 (CGNB 413) Briefing
Lesson 3-Multimedia Skills. Overview Members of a multimedia team. Roles and responsibilities in a multimedia team.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Investigator Home Page * The red asterisk * indicates a required field that MUST be completed. You will not be able to submit the change in.
INFSOM-RI A Quality Certification Model for Grid Research Projects the ETICS feasibility Study Adriano Rippa
Ecommerce Applications 2009/10 Session 41 E-Commerce Applications Step by step building of a shop in Shopcreator.
Thank you for looking into Policy Manager Two for your Head Start program Teresa K. Wickstrom Senior Associate Center for Community Futures
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
Tema 3 INEbase history Statistical books available on the web Celia Santos
DataGrid and CrossGrid Helpdesk CERN, 30th October 2002 EDG WP6 meeting Sophie Nicoud (CNRS-Marseille) and José Salt (IFIC-Valencia)
Conference name Company name INFSOM-RI Speaker name SA2 Status ETICS 2 All Hands Meeting Darmstadt, February 18 th 2008 Valerio Venturi INFN –
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
Home Page Note: Fastest Way to Access CONTENT LIBRARY:
Bob Jones EGEE Technical Director
Bodies of Knowledge TAC Meeting Los Alamitos, CA 11 May 2011
JRA2: Quality Assurance
Training Guide for Faculty
NA2 Status Update ETICS2 first AHM Isabel Matranga
Overview on the Work of WG 6
PROPworks ESB Financial Interface
DOCUMENTATION DEVELOPMENT LIFE CYCLE (DDLC)
Modules State College of Florida
CONTENT MANAGEMENT SYSTEM CSIR-NISCAIR, New Delhi
ETICS 2 All-Hands Meeting
StratusLab Project Status
European Commission, DG Health and Consumers Health Information Unit
Lessons Learned, Future Plans and Conclusions
Bulk Fuel,Gasoline and Diesel Event User Guide
ETICS Services Management
SA2 Status ETICS 2 All Hands Meeting Darmstadt, February 18th 2008
School of EE and Computer Science
Training Guide for Faculty
Built by Schools for Schools
System Navigation and Test Launch
ENC 3254: Professional communication for Engineers
Citation Map Visualizing citation data in the Web of Science
Module 01 ETICS Overview ETICS Online Tutorials
EVOSS Walkthrough.
JHM eIRB Emergency Use.
Vendor ITB - Event User Guide
Your 2016 Code of Conduct Annual Acknowledgment - User Guide
Welcome Traceability Software Integrators
LAMAS Working Group December 2013
“PERFORM: Let’s Get Started”
WordPress Unit Web Coordinators
Developing Action Plans
ZTE Customer Request Self-Service Portal Operation Guide V1.0.5
Working Group “Real-Driving Emissions of Light-Duty Vehicles” Work Progress – December
Presentation transcript:

Current status and next steps Grid-QCM Current status and next steps Palermo, 13-15 October 2008

Content Deliverable status Plug-ins implementation status Validation Experts proposal Trial certifications plans Grid-QCM logo proposal Grid-QCM web interface proposal Next months plan Grid-QCM implementation issues Palermo, 13-15 October 2008

Deliverable status DNA2.3 – deadline 28/11/2008 Work in progress The draft version for the internal review is planned to be ready by 06/11/2008 Palermo, 13-15 October 2008

Plug-ins implementation status All the required metrics plug-ins have been identified The related table has been sent to SA1. Feedback required! Open issues Scheduling the implementation of the metrics Determining deadlines for every plug-in implementation and integration Palermo, 13-15 October 2008

Validation Experts proposal Experts will validate Grid-QCM results First feedback will be included in DNA2.3 One of them could be proposed to be included in the advisory board Three experts contacted Two of them replied positively Professor Alain Abran Department of Software and IT Engineering École de technologie supérieure Montréal, Québec Professor Juan Garbajosa Technical University of Madrid Waiting for the answers from the third one Palermo, 13-15 October 2008

Trial Certifications (1/3) Next months activities ETICS 2 self-certification Scheduled at December ’08 (M10) even if Official deadline: M21 It is urgent to test Grid-QCM implementation before the trial certifications with users gLite and UNICORE trial certifications Planned for the second half of January ’09 (M11) Palermo, 13-15 October 2008

Trial Certifications (2/3) Activities planning MoU: waiting for feedback from gLite and UNICORE Certification procedures Who is involved? gLite (contact-point + ENG+ ?) UNICORE (contact-point + ENG+ ?) By when? ASAP to start to discuss about procedures, timing and concrete actions for project certification What? Plan a day for the official certification Projects can begin using the Grid-QCM plug-ins on ETICS in order to tune their code in order to afford the certification Certification (will be final for our report) Palermo, 13-15 October 2008

Trial Certifications (3/3) Projects for the next phase Next steps Results will be evaluated in order to improve the model and the implementation Project team Experts At least 2 other projects needed D4S The fourth one? Palermo, 13-15 October 2008

Logo (1/2) Always issued… Every project is issued with a certificate Result of one of the four Quality aspects Info like the model name etc… Proposed logos should be modified in order to include information on certification results Visual way (colours, icons…) Numeric way Palermo, 13-15 October 2008

Logo (2/2) …limited issuing? Projects need to reach at least a lower bound to get it It doesn’t report results of quality aspects Specific information in the attached documentation Palermo, 13-15 October 2008

Web interface (1/8) Discussion on the draft of the structure. The implementation activities will start after a common acknowledgement on the structure. Palermo, 13-15 October 2008

Web interface (2/8) First way to access the Grid-QCM results Clicking on the Grid-QCM link, only the Grid-QCM related metrics will appear on the screen Link to Grid-QCM results related to this report. Clicking… Palermo, 13-15 October 2008

Web interface (3/8) Second way to access the Grid-QCM results A tab will be dedicated to Grid-QCM. Palermo, 13-15 October 2008

Web interface (4/8) More information on the “tabbed” way Clicking on the main Grid-QCM tab user should be able to browse all the projects only looking at Grid-QCM results Every project should have a tree structure. Going more in depth one can look at more specific metrics. Maximum level is the “class-level” Palermo, 13-15 October 2008

Web interface (5/8) The menu Every metrics at this level will have a its own icon Palermo, 13-15 October 2008

Web interface (6/8) The project level To be discussed The general page Functionality 3 Reliability 2 Maintainability 3 Portability 3 Operating Systems xxxxx, yyyyyy, zzzzzzz Standards wwwwwww, tttttttt, sssssssss LINK TO HISTORY General results for the tested application Trend analysis graphic related to this item Palermo, 13-15 October 2008

Web interface (7/8) The Quality Aspect, metric and EM levels Numeric and Graphical values Trend analysis graphic related to this item LINK TO HISTORY Palermo, 13-15 October 2008

Web interface (8/8) The Metric, component and class levels Numeric values Graphical values LINK TO HISTORY Trend analysis related to this item Palermo, 13-15 October 2008

Next months plan Until M12 QA&TEST presentation (28/10/2008) D2.3 ready for internal review (06/11/2008) Plug-ins implementation D2.3 final version ready (28/11/2008) ETICS self-certification Web interface gLite and UNICORE trial certifications Palermo, 13-15 October 2008

Grid-QCM implementation Open issues From NA1 presentation we got: How is the Grid-QCM score calculated Is it a plugin in itself? Is calculated asynchronously? What about trend analysis? How is the report generator integrated with the metrics disseminators? Palermo, 13-15 October 2008

Q&A http://www.eticsproject.eu Palermo, 13-15 October 2008