Electron Cloud Effects

Slides:



Advertisements
Similar presentations
Heat load due to e-cloud in the HL-LHC triplets G. Iadarola, G. Rumolo 19th HiLumi WP2 Task Leader Meeting - 18 October 2013 Many thanks to: H.Bartosik,
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
LHCC 3rd June 2015 Mike Lamont for the LHC team
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
Giovanni Rumolo, G. Iadarola and O. Dominguez in LHC Beam Operation workshop - Evian 2011, 13 December 2011 For all LHC data shown (or referred to) in.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
SPS Scrubbing Runs 2014 week 45 and week 50 (part I) H. Bartosik, G. Iadarola, K. Li, L. Mether, G. Rumolo, M. Schenk Thanks to: SPS OP crew, G. Arduini,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Improved electron cloud build-up simulations with PyECLOUD G. Iadarola (1),(2), G. Rumolo (1) (1) CERN, Geneva, Switzerland, (2) Università di Napoli “Federico.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Electron cloud in the LHC: lessons learnt from 2015 experience with 25 ns beams G. Iadarola, H. Bartosik, K. Li, L. Mether, A.Romano, G. Rumolo, M. Schenk.
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
FCC-hh: First simulations of electron cloud build-up L. Mether, G. Iadarola, G. Rumolo FCC Design meeting.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 ELECTRON CLOUDS AND VACUUM EFFECTS IN THE SPS Experimental Program for 2004 J.M. Jimenez Thanks.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
Progress on e-cloud effects (PS and SPS) G. Iadarola, H.Bartosik, G. Rumolo, M. Taborelli, C. Yin Vallgren Many thanks to: G. Arduini, T. Argyropoulos,
200 MHz option for HL-LHC: e-cloud considerations (heat load aspects) G. Iadarola and G. Rumolo HLLHC WP2 meeting 03/05/2016 Many thanks to: K. Li, J.
Electron Cloud Effects: Heat Load and Stability Issues G. Iadarola, A. Axford, K. Li, A. Romano, G. Rumolo Joint HiLumi LHC - LARP Annual Meeting,
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
Pros and Cons of the 200 MHz System G. Iadarola, K. Li, E. Metral, G. Rumolo Thanks to: L. Medina, J. Esteban Mueller, B. Salvant, E. Shaposhnikova, R.
A preliminary overview on the 2014 Scrubbing Run II The scrubbing team, i.e. H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, B. Salvant,
Scenarios for 2017 and 2018 Thanks to Gianni, Fanouria, Gianluigi, Dario, Stephane, Elias, Michi, Jamie, Christoph, Rogelio, Mirko, Riccardo, Hannes,
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Joint LIU / HLLHC day -15 October 2015
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
LHC Machine Status report
Machine Coordinators: G. Arduini, J. Wenninger
Long Shutdown for the LHC: Vacuum Beam Pipes
Longitudinal beam parameters and stability
MD2036: UFO dynamics studies and UFO fast detection
Proposals for 2015 impedance-related MD requests for PSB and SPS
Electron cloud & vacuum pressure observations: 2011 proton run
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Acknowledgments: LIU-PT members and deputies, H. Bartosik
MD2490: Measurement of the TMCI Threshold at Flat-Top
Session 2: Key Challenges for Operation
Observations with different bunch spacings
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Summary of Week 16 G. Arduini, J. Wenninger
Scrubbing progress - 09/12/2012
Scrubbing progress - 10/12/2012
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
News on TMCI in the SPS: Injecting high intensity bunches
Scrubbing progress - 08/12/2012
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Another Immortal Fill….
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

Electron Cloud Effects G. Iadarola, H. Bartosik, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk Many thanks to: G. Arduini, E. Metral, LHC Coordination, BE-BI, BE-RF, BE-OP, EN-ICE, EN-STI, TE-ABT, TE-CRG, TE-VSC for the invaluable support Chamonix 2016

Outline Introduction Scrubbing at 450 GeV Intensity ramp-up with 25 ns beams Beam dynamics observations Heat loads Conditioning observations De-conditioning and re-conditioning observations Effect of Technical Stops and Special Runs Experience with exotic bunch patterns Doublets 8b+4e First lessons to retain and possible strategy for 2016

Recommissioning with beam Introduction One of the main goals of the 2015 run was to explore operation with 25 ns beams Expected challenges from e-cloud effects (as anticipated from 25 ns pilot run in 2012) Decided to operate with ~nominal bunch parameters (1.1 x 1011 ppb in 2.5 um injected) Significant time allocated for scrubbing 5 April 24 June 5 July Recommissioning with beam (low intensity, 6.5 TeV) Scrubbing Run 1 (450 GeV) Intensity Ramp-up (*) (50 ns – 6.5 TeV) TS1 MD1 25 July 10 August 7 September 4 November Scrubbing Run 2 (450 GeV) Intensity Ramp-up (*) (25 ns – 6.5 TeV) Intensity Ramp-up (25 ns – 6.5 TeV) MD2 +TS2 (*) Limited to ~450b. by radiation induced faults in QPS electronic boards (fixed during TS2)

Outline Introduction Scrubbing at 450 GeV Intensity ramp-up with 25 ns beams Beam dynamics observations Heat loads Conditioning observations De-conditioning and re-conditioning observations Effect of Technical Stops and Special Runs Experience with exotic bunch patterns Doublets 8b+4e First lessons to retain and possible strategy for 2016

Scrubbing for 25 ns operation Scrubbing Run 1: 24/6 – 2/7 Scrubbing Run 2: 25/7 – 8/8 50 ns After LS1 the Secondary Electron Yield (SEY) was practically reset (same as beginning of Run 1) e-cloud induced instabilities were observed even with 50 ns During (1+2) weeks of scrubbing at 450 GeV Regularly filling the machine with up to ~2500b. with 25 ns spacing at 450 GeV Main limitations to the scrubbing efficiency: e-cloud instabilities  evidently improving with scrubbing Transients on beam screen temperatures  less critical now with the new Cryo-Maintain rules Vacuum spikes at the TDI8 injection absorber  exchanged during YETS Pressure rise in the MKIs  close follow-up by TE-ABT and TE-VSC team (interlock changes)

Scrubbing for 25 ns operation Scrubbing Run 1: 24/6 – 2/7 Scrubbing Run 2: 25/7 – 8/8 50 ns Secondary Electron Yield (SEY) was reconstructed comparing heat load and RF stable phase measurements against PyECLOUD simulations Observed reduction of the SEY confirmed by steadily improving beam quality

Scrubbing for 25 ns operation Scrubbing Run 1: 24/6 – 2/7 Scrubbing Run 2: 25/7 – 8/8 50 ns SEY was reconstructed comparing heat load and RF stable phase measurements against PyECLOUD simulations Observed reduction of the SEY confirmed by steadily improving beam quality

Outline Introduction Scrubbing at 450 GeV Intensity ramp-up with 25 ns beams Beam dynamics observations Heat loads Conditioning observations De-conditioning and re-conditioning observations Effect of Technical Stops and Special Runs Experience with exotic bunch patterns Doublets 8b+4e First lessons to retain and possible strategy for 2016

Intensity ramp-up with 25 ns beams: beam dynamics Scrubbing Run provided sufficient mitigation against beam degradation at 450 GeV but full suppression of the e-cloud was not achieved During the physics intensity ramp-up we had to learn how to run the machine in the presence of the e-cloud Tricky to ensure beam stability at 450 GeV: need for high chromaticity and octupoles settings and for full transverse damper performance (see talk by K. Li) Slightly changed working point at injection to better accommodate large tune footprint from Q’, octupoles and e-cloud Octupole knob at -1.5 Q’=15/20, 5 x 1011 e/m3 Q’v=15 Qv=.305 Q’v=15 Qv=.300 Q’v=10 Qv=.305 (.28, .31) (.275, .295)

Intensity ramp-up with 25 ns beams: heat loads In the first stages, even with relatively low number of bunches, strong transients of the beam screen temperatures were observed, leading to loss of cryo-conditions : Intensity ramp-up performed in “mini-steps” for fine tuning of cryo-regulations During the first stages, injection speed often decreased to control beam screen temperatures Limitation from transients strongly mitigated over the year by: Modified Cryo Maintain rules to allow for larger temperature excursion Improvement on cryogenic feed-forward control SR1 50 ns 25ns SR2 TS2 High b*

Intensity ramp-up with 25 ns beams: heat loads Around ~1450b. (1.5x1014 p) we started approaching the limit of the available cooling capacity on the arc beams screens. Additional margin gained by: Increased longitudinal emittance blow-up on the ramp optimized filling scheme to gain additional margin By the end of the proton run reached 2244b. (in trains of 36 b.) with 1.2x1011 ppb High b* 72 bpi 144 bpi 72g72 (4x36) bpi Filling pattern 100 ns 1.25 ns 1.3 ns 1.35 ns Target b. length

Scrubbing accumulated during the physics run Heat load per bunch significantly decreased during the physics run Reference fill performed at the end of the run in order to disentangle contributions from scrubbing and beam tuning High b* 72 bpi 144 bpi 72g72 (4x36) bpi 1.25 ns 1.3 ns 1.35 ns Filling pattern Target b. length 100 ns

Scrubbing accumulated during the physics run At the end of the p-p run we repeated an early fill of the intensity ramp-up Very similar beam conditions (filling pattern, bunch intensity, bunch length) After 2 months, significant reduction visible in all arcs (30% to 60% depending on the sector) 14 September – Average arc half cells 4 November – Average arc half cells Average Impedance+synch. rad

Scrubbing accumulated during the physics run At the end of the p-p run we repeated an early fill of the intensity ramp-up Very similar beam conditions (filling pattern, bunch intensity, bunch length) After 2 months, significant reduction visible in all arcs (30% to 60% depending on the sector) Reduction observed mainly in dipole magnets (higher SEY threshold compared to quadrupoles) 14 September Dipoles (instrumented cells in S45) Q6s (IR1&5) 4 November Dipoles (instrumented cells in S45) Q6s (IR1&5) Average Impedance+synch. rad

Scrubbing accumulated during the physics run Electron dose needed to achieve factor two reduction of the heat load at flat top is very large: Difficult to accumulate in a reasonable time with dedicated scrubbing run Possible future strategy (e.g. after LS2): Shorter scrubbing period, to achieve acceptable beam quality Accumulate further dose in parallel with physics (but slower intensity ramp up to be expected) 6 mC/mm2 94 mC/mm2 Scrubbing Run (~2 weeks) 25 ns physics (~2 months) Accumulated e- dose At the end of the p-p run we repeated an early fill of the intensity ramp-up Very similar beam conditions (filling pattern, bunch intensity, bunch length) After 2 months, significant reduction visible in all arcs (30% to 60% depending on the sector) Reduction observed mainly in dipole magnets (higher SEY threshold compared to quads) 14 September Dipoles (instrumented cells in S45) Q6s (IR1&5) 4 November Dipoles (instrumented cells in S45) Q6s (IR1&5) Average Impedance+synch. rad

Achieved in 2015: 2244b. in trains of 36b. Situation at the end of the p-p run Achieved in 2015: 2244b. in trains of 36b. 2244b. Factor 3 spread among heat loads in different sectors Sectors 81, 12 and 23 close to the limit with this filling scheme Sectors 34, 45, 56, 67 (and cold magnets in IRs) have already enough margin to accommodate the nominal beam(1) Avg. per half cell Average Impedance+synch. rad (1) Analysis by D. Berkowitz and S. Claudet

Different heat loads along the LHC The difference among sectors seems not to be a measurement artefact Test cells were calibrated with heaters Sectors with high heat load also show larger BLM signals in the arcs Thanks to D. Mirarchi, S.Redaelli

Different heat loads along the LHC The difference among sectors seems not to be a measurement artefact Test cells were calibrated with heaters Sectors with high heat load also show larger BLM signals in the arcs Compatible with worse vacuum due to a stronger e-cloud activity? Not visible on the localized gauges in the arcs, but number of gauges is limited Thanks to G. Bregliozzi, P. Chiggiato, C. Yin Vallgren Thanks to D. Mirarchi, S.Redaelli

Different heat loads along the LHC The difference among sectors seems not to be a measurement artefact Test cells were calibrated with heaters Sectors with high heat load also show larger BLM signals in the arcs Compatible with worse vacuum due to a stronger e-cloud activity? Not visible on the localized gauges in the arcs, but number of gauges is limited Several tests and analysis performed/ongoing: It is there with only one beam It was observed also with 50 ns, then disappeared with scrubbing It was observed with doublets Difference is increasing with time Unaffected by radial position of the beam Thermal cycle of the beam screen has no effect on the heat load … but origin of different behaviour is still unclear Spread not related to construction differences since heat load distribution in the ring was different in 2012 Thanks to D. Mirarchi, S.Redaelli

Looking at 2016 Still some way to go… Achieved in 2015: 2244b. in trains of 36b. no margin for heat load increase (S12-23) Nominal: 2748b. in trains of 72b. 22% more bunches but 40% less gaps  expected ~50% more heat load Still some way to go…

Outline Introduction Scrubbing at 450 GeV Intensity ramp-up with 25 ns beams Beam dynamics observations Heat loads Conditioning observations De-conditioning and re-conditioning observations Effect of Technical Stops and Special Runs Experience with exotic bunch patterns Doublets 8b+4e First lessons to retain and possible strategy for 2016

Deconditioning & reconditioning Scrub. MD2 TS2 High b* MD3 TS3

Deconditioning & reconditioning Scrub. MD2 TS2 High b* MD3 TS3 By the end of the scrubbing run it was possible to store 1177b. with injections of 144b. without significant beam degradation from the electron cloud

Deconditioning & reconditioning Scrub. MD2 TS2 High b* MD3 TS3 By the end of the scrubbing run it was possible to store 1177b. with injections of 144b. without significant beam degradation from the electron cloud Two weeks later, strong emittance blow-up was observed with 459b. with injections of 72b.

Scrubbing checks at 450 GeV Deconditioning & reconditioning Scrubbing checks at 450 GeV Scrub. MD2 TS2 High b* MD3 TS3 By the end of the scrubbing run it was possible to store 1177b. with injections of 144b. without significant beam degradation from the electron cloud Two weeks later, strong emittance blow-up was observed with 459b. with injections of 72b. Decided to perform check fills at 450 GeV to monitor more precisely the e-cloud evolution

Scrubbing checks at 450 GeV Deconditioning & reconditioning Scrubbing checks at 450 GeV Scrub. MD2 TS2 High b* MD3 TS3 decondit. deconditioning 3h scrub. 3h scrub. 3h scrub.

Scrubbing checks at 450 GeV Deconditioning & reconditioning Scrubbing checks at 450 GeV From vacuum gauges Thanks to G. Bregliozzi, P. Chiggiato, C. Yin Vallgren Scrub. MD2 TS2 High b* MD3 TS3 decondit. deconditioning 3h scrub. 3h scrub. 3h scrub.

Scrubbing checks at 450 GeV Deconditioning & reconditioning Scrubbing checks at 450 GeV Scrub. MD2 TS2 High b* MD3 TS3 Deconditioning can give some problem during the early stages of the intensity ramp-up  it could be more efficient to have the first intensity steps at 6.5 TeV interleaved with the last scrubbing fills decondit. deconditioning 3h scrub. 3h scrub. 3h scrub. Scrubbing seems to be reasonably well preserved during short Technical Stops Deconditioning observed mainly when running with low e-cloud filling schemes but recovery can be achieved rather quickly

Outline Introduction Scrubbing at 450 GeV Intensity ramp-up with 25 ns beams Beam dynamics observations Heat loads Conditioning observations De-conditioning and re-conditioning observations Effect of Technical Stops and Special Runs Experience with exotic bunch patterns Doublets 8b+4e First lessons to retain and possible strategy for 2016

Doublets 5 ns 20 ns Similarly to scrubbing with 25 ns beams to ensure ecloud-free with 50 ns beams, the doublets boost scrubbing for 25 ns beams Doublet trains were tested for the first time in the LHC during the Scrubbing Run e-cloud enhancement could be confirmed experimentally Standard 25 ns beam “Doublet” beam Impedance+synch. rad

Doublets 5 ns 20 ns Similarly to scrubbing with 25 ns beams to ensure ecloud-free with 50 ns beams, the doublets boost scrubbing for 25 ns beams Doublet trains were tested for the first time in the LHC during the Scrubbing Run e-cloud enhancement could be confirmed experimentally But, due to violent e-cloud instabilities, it was impossible to inject enough beam and keep sufficient beam quality for efficient scrubbing with doublets

Doublets Considerations for 2016 Similarly to scrubbing with 25 ns beams to ensure ecloud-free with 50 ns beams, the doublets boost scrubbing for 25 ns beams Considerations for 2016 Doublet trains were tested for the first time in the LHC during the Scrubbing Run e-cloud enhancement could be confirmed experimentally But, due to violent e-cloud instabilities, it was impossible to inject enough beam and keep sufficient beam quality for efficient scrubbing with doublets As long as in physics we are running at the cryogenics limit (with strong load in the dipoles) by definition there is no way to increase the scrubbing efficiency On the other hand, when we will have lowered significantly the SEY in the dipoles, doublets could become interesting to bring the SEY below the threshold for 25 ns To achieve a good efficiency with doublets we need better control of e-cloud instabilities  more bunches in longer trains For this purpose: Doublet should be tested after having accumulated enough scrubbing with nominal beam (i.e. not at the beginning of the run) Operate with high Q’ to stabilize and lower tunes to preserve lifetime Optimize ADT configuration for doublet intensity and working point

Outline Introduction Scrubbing at 450 GeV Intensity ramp-up with 25 ns beams Beam dynamics observations Heat loads Conditioning observations De-conditioning and re-conditioning observations Effect of Technical Stops and Special Runs Experience with exotic bunch patterns Doublets 8b+4e First lessons to retain and possible strategy for 2016

8b+4e scheme Filling pattern designed to suppress the e-cloud build-up (lower thresholds expected from simulations, and verified in SPS MD) Confirmed experimentally in the LHC in 2015 Validated as alternative scenario in case of strong e-cloud limitations Up to ~1850b. in the LHC Standard 25 ns beam Dipoles (instrumented cells in S45) “8b+4e” beam Dipoles (instrumented cells in S45) Average Impedance+synch. rad

Outline Introduction Scrubbing at 450 GeV Intensity ramp-up with 25 ns beams Beam dynamics observations Heat loads Conditioning observations De-conditioning and re-conditioning observations Effect of Technical Stops and Special Runs Experience with exotic bunch patterns Doublets 8b+4e First lessons to retain and possible strategy for 2016

First lessons to retain Scrubbing at 450 GeV allows to mitigate e-cloud instabilities and beam degradation occurring at low energy After this stage, relying on ADT and high Q’ and octupoles, it is possible to preserve good beam quality from injection to collision in spite of the e-cloud still present in the machine  high heat load in the arcs Parasitic scrubbing accumulated during the physics run has lowered the heat load in the dipoles by roughly a factor two (in two months) The doses needed to see an evolution at this stage are very large, practically incompatible with a dedicated scrubbing run Possible recipe for the future (e.g. after LS2): relatively short scrubbing at injection to get the beam under control, then accumulate further dose in parallel with physics (but slower intensity ramp up)

Proposal for the 2016 start-up Arcs will be kept under vacuum  scrubbing should be at least partially preserved during the YETS Scrubbing proposal for 2016: 4 days scrubbing run should be reasonable to recover high intensities at 450 GeV (assuming setup for high intensity is done before, e.g. injection, ADT) A few “refresh” scrubbing fills during first 1-2 weeks of intensity ramp up in physics (to avoid problems with deconditioning) During intensity ramp up: As long as no limitation is encountered, try to maximize electron dose by using long trains (up to 288b. per injection)  it will pay off later If/when cryo limit is reached, move to optimized filling scheme to gain luminosity Use physics fills to accumulate more scrubbing for further intensity increase Doublet test to be performed when SEY is sufficiently low (e.g. at least after recovering the end-2015 situation) to check whether good beam quality can be preserved In case of positive outcome, first scrubbing stores with doublets

Thanks for your attention!

Scrubbing accumulated during the physics run At the end of the p-p run we repeated an early fill of the intensity ramp-up Very similar beam conditions (filling pattern, bunch intensity, bunch length) After 2 months, significant reduction visible in all arcs (30% to 60% depending on the sector) Reduction observed mainly in dipole magnets (higher SEY threshold compared to quads) Practically no measurable heat load in the dipoles at 450 GeV (at least in S45)  SEY should be below 1.4 14 September Dipoles (instrumented cells in S45) Q6s (IR1&5) 4 November Dipoles (instrumented cells in S45) Q6s (IR1&5) PyECLOUD simulations Average Impedance+synch. rad

8b+4e scheme Filling pattern designed to suppress the e-cloud build-up (lower thresholds expected from simulations, and verified in SPS MD)  confirmed experimentally in the LHC in 2015 Standard 25 ns beam 1600b. “8b+4e” beam 1600b.

No e-cloud in the dipoles PyECLOUD simulations for the LHC arc dipoles Doublets 5 ns 20 ns Similarly to scrubbing with 25 ns beams to ensure ecloud-free with 50 ns beams, the doublet would boost scrubbing for 25 ns beams Doublet Scrubbing 50 ns beam ~1400 bunches 1.7 x 1011 p/b 50 ns Scrubbing 25 ns Scrubbing 25 ns beam ~2800 bunches 1.15 x 1011 p/b Preparation work done in 2015: Careful setup in the injectors  doublets available for the LHC with ~1.6x1011 p/doublet First tests with doublets in the LHC allowed to gain experience on the behavior of the different LHC systems (instrumentation, RF, damper, MP) with this bunch pattern Interlocked BPMs (expected to give false readings) were characterized with doublets Interlock windows adapted in order to allow reliable operation No e-cloud in the dipoles Doublet beam ~900 doublets 0.7 x 1011 p/b PyECLOUD simulations for the LHC arc dipoles

No e-cloud in the dipoles PyECLOUD simulations for the LHC arc dipoles Doublets 5 ns 20 ns Similarly to scrubbing with 25 ns beams to ensure ecloud-free with 50 ns beams, the doublet would boost scrubbing for 25 ns beams Doublet Scrubbing 50 ns beam ~1400 bunches 1.7 x 1011 p/b 50 ns Scrubbing 25 ns Scrubbing 25 ns beam ~2800 bunches 1.15 x 1011 p/b No e-cloud in the dipoles Doublet beam ~900 doublets 0.7 x 1011 p/b PyECLOUD simulations for the LHC arc dipoles

Doublets: instabilities and beam degradation With doublets, fast e-cloud induced instabilities were observed, difficult to control even with high Q’ and octupole settings and ADT ON strong emittance blow-up and particle losses

Effect of the bunch pattern 1465b., 144 bpi 1us gap 250 ns gap e-cloud saturation ~bunch 30 e-cloud saturation ~bunch 20

100 ns