IBL project for DT Science-Techno Tea

Slides:



Advertisements
Similar presentations
3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:
Advertisements

IBL Insertable B-Layer
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Activités mécaniques 17 septembre 2013 D. Laporte F. De Matos / Y. Orain / P. Ghislain Atlas / SLHC.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)
Stave -1 status and other reports Stave Loading Meeting, November 8 th 2011 G. Barbier, F. Cadoux, A. Clark, D. Ferrère, C. Husi, G. Iacobucci, A. La Rosa,
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
IBL MoU G. Darbo – INFN / Genova 17 April 2010 o IBL MoU Contribution prepared for Marzio’s talk at April RRB G. Darbo - INFN / Genova.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
WG3 Insertion/Extraction Testing Program R. Vuillermet 11/04/20111.
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
IBL Progress D. Ferrère for the IBL community LHCC Upgrade Session – June 14 th 2011 Detailed progress was reported at the IBL General meeting, June 8-10.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
EC: 7 DISK concept Preliminary considerations
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
Straw man layout for ATLAS ID for SLHC
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
DT-LHCb coordination meeting 18 April 2016
Local cooling LAPP – Annecy /IN2P3
Baby-MIND Modules & Services
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Detector building Notes of our discussion
IBL Technical Aspects H. Pernegger / CERN.
ADO-PO section meeting. ADO : Atlas Detector Operation
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Hybrid Pixel R&D and Interconnect Technologies
Antti Onnela CERN – EP – Detector Technologies group
LumiCal mechanical design, integration with LDC and laser alignment
Integration issues at IHEP
Rod adaptors for module tests Module positioning studies
WG4 – Progress report R. Santoro and A. Tauro.
SIT AND FTD DESIGN FOR ILD
Mechanics of the MVD Daniela Calvo on behalf of the MVD group
Update on ATLAS insertable B-layer
Presentation transcript:

IBL project for DT Science-Techno Tea R. Vuillermet PH/ADO/PO 14/05/2012 R.Vuillermet

Overview Introduction to IBL project IBL project structure IBL challenges Focus on WG3 WG3 Partners Scale one mock-up Scenario and tools for beam pipe extraction and IBL insertion 14/05/2012 R.Vuillermet

Introduction to IBL project IBL : Insertable B-layer B Like “Beauty” An additional layer of Pixel will be inserted into the Pixel detector of ATLAS Why an additional layer ? To be closer to interaction point and closer to the decay of the Beauty particle To gain into track reconstruction by having a 4th point To compensate the ineluctable degradation of the current B-Layer To implement the most recent silicon and chips technology 14/05/2012 R.Vuillermet

Increased luminosity requires Higher hit-rate capability Higher segmentation Higher radiation hardness Lighter detectors Radiation hardness improvement compared to now on pixel sensors IBL approx. factor 5 Phase-2 approx. factor 10-30 14/05/2012 R.Vuillermet

IBL project structure Project leader : Giovanni Darbo (Genova, IT) Technical coordinator : Heinz Perneger (PH/ADE) Working group leaders : WG1 : Module Fabian Huegging Bonn & M. Garcia-Sciveres LBL WG2 : Stave and Flex E. Vigeolas CPPM & O. Rohne Oslo WG3 : Integration and Installation, R. Vuillermet CERN & F. Cadoux UniGe WG4 : Off detector T. Flick Wuppertal & S. Debieux UniGe Each working group meet with there teams every 2 weeks All the working group leaders with PL and TC meet once a month during a IBL Management Board 14/05/2012 R.Vuillermet

IBL Challenges WG1 : New technology for the module : Planar and 3D (first time tested in experiment) Those modules are qualify with x5 more irradiation dose (5xE15 neuton eq/cm2) than the current B-layer New Front End Chip x6 bigger in the surface than current Pixel (26888 /2880 channels) Qualified for 250Mrad instead of 50Mrad, Increase the number of included transistor 87Milliong (3.5M with current B-layer) ~2 cm FE-I4 R/O Chip 27 k Pixels 87 M transistors 14/05/2012 R.Vuillermet

WG2 : Lighter structure, use of carbon foam New cooling technology for the Pixel with Co2 instead of C3F8 (cooling pipe diameter 1.5mm) New Stave’s flex with multilayers 2 aluminium layers sand 4 layers copper Connection across the thickness with via (new technology) K9 Foam bloc K13C /RS3 parylen coated face plate Peek end blocs K13C/RS3 Omega Stiffener Flex Bus ID 1.5mm Ti boiling pipe 14/05/2012 R.Vuillermet

WG3 : Develop the scenario for Beam pipe extraction and IBL insertion, whereas this operation was never foreseen during the design of the current pixel detector. Integration of the stave in very limited space Tight integration of all modules services in a narrow space Stave Handling frame Beam Pipe 14/05/2012 R.Vuillermet

Optobox concept for Pixel readout upgrade and IBL WG4 : New electronic for read out (ROD read out driver) x4 more channel per board Have to transmit signal of 1.60Mbytes on long cable (6-8m) Guaranty low V drop in the power lines Define and develop services with their connections Optobox concept for Pixel readout upgrade and IBL 14/05/2012 R.Vuillermet

WG3 : Integration & Installation Partners Several partners are collaborating in these tasks : UniGe (Geneva) for the integration and loading tool Loading of the stave on the beam pipe (operation to be done in SR1) LAPP (Annecy)for the service organisation Wrapping of the services to be able to insert IBL with their services into the Inner Support Tube (Ø86mm) Integration and routing of services on the front face of the Inner Detector 14/05/2012 R.Vuillermet

LPSC (Grenoble) for the extraction/insertion supports Brandeis (Boston) for the LGT development Seattle for the IST fabrication LAL (Paris) for the design of : sealing ring (feed through and electrical shielding) IST support 14/05/2012 R.Vuillermet

At CERN : Part time job Design and integration of the IBL Package Christophe Bault (PH/DT) for the design and integration of PP0 area Francois-Xavier Nuiry (PH/DT) for the design and integration of the flex + thermal mock-up Denis Diyakov (PH/ADO) for the Services integration up to USA 15 Erik Richards (PH/ADO) for the services integration on the Calorimeter end plate and optobox design\ Sebastien Michal (PH/ADO - UniGe) for the CAD management, PP1 integration, integration with Pixel and DBM Mock-up assembly and tests Marco Ciapetti (PH/ADO) for the integration of the scale one mock up and its associated tooling. Louis Rose-Dulcina and Francisco Limia-Conde (PH/ADO) for the assembly and tests of tooling in building 180. Safety aspect for activation of the working area Olga Beltramello (PH/ADO) Mechanical simulation Dimitar Mladenov (PH/ADO) Part time job 14/05/2012 R.Vuillermet

Scale one mock-up (b180) Mock-up of the inner detector Support tools for insertion/extraction Supporting structure on side C with Mini vans Supporting structure on side A with bridge scaffolding 15/11/2011 R. Vuillermet

Scenario and tooling for beam pipe extraction and IBL insertion The removing the beam pipe in situ, is an operation that was never imagined during the design of the Pixel supporting structure. This operation is delicate for several reasons : The beam pipe is a long object (7.4m) The beam pipe deforms under its own weight of about 40mm, when place on 2 supports at its extremities The pixel modules are radially located at 8 mm from the beam pipe and are extremely fragile The wire system that support the beam pipe is not directly accessible as it is located at 3m from any hands access The working space to insert tools are rather small The possibility to control visually the removing operation is limited or impossible ... Despite what is looking like “impossible mission” we have imagined tools and procedures to perform this extraction operation And have developed a scale one mock-up of the inner detector and its environment to test, improve, practise the tools and procedures 15/11/2011 R. Vuillermet

Remove the beam pipe Concept and tools PP1 support Beam pipe support : A-side C-side Central wire support Concept : As their is not space out of the beam pipe to access and support it we have explored what can be done from the inside the beam pipe The tools The Long Guiding Tube (LGT) The LGT was imagined and design such that it can take the load of the beam pipe and can control actively its central deflection (using muon alignment system connected to a tension mechanism). Once on the LGT, the beam pipe can slide out of the inner detector. The collar removing tools The collar removing tool is disassembling the collar and collecting the wires such that the beam pipe can slide through the Pixel B-Layer. Reception tooling For support, and handling of the different items that need to be transfer with the surface. 15/11/2011 R. Vuillermet

Remove the beam pipe Concept and tools The beam pipe flange on A-side is too close to the B-layer envelope . The flange need to be cut on the aluminum section The LGT is inserted inside the Beam Pipe and supported at both sides. The support collar at PP0 A and C-side are disassembled and extracted with wires at PP1. Beam pipe is extracted from the C-side and it pulls the wire at PP1 New cable supports are inserted inside Pixel volume at PP0. A support carbon tube (Inner Support Tube IST) is pushed inside the Pixel volume along the LGT. C-side A-side 15/11/2011 R. Vuillermet

The LGT with a space frame are moved out from the IST The IST is supported in 2 points at PP0 by the wire system and on PP1 walls on side C and A at the level of the Pixel cruciform. The LGT with a space frame are moved out from the IST . The new beam pipe with the IBL Package are inserted from C-side. C-side A-side 15/11/2011 R. Vuillermet

Removing the beam pipe The Long Guiding Tube (Brandeis) An aluminium tube equipped with an optical system able to measure its deflection in the several points and equipped with a mechanical system applying a torque at both extremities pilot by a regulation soft to compensate the middle deflection. Horizontal displacement Vertical displacement LGT with dummy beam pipe during calibration process 15/11/2011 R. Vuillermet

Deflecting under its own weight LGT “OFF” Deflecting under its own weight LGT “ON” Self compensating its natural deflecting 15/11/2011 R. Vuillermet

Remove the collar supporting the beam pipe Screw driver tool Bolt Catching tool Collar catching tool Extraction test with the first prototype tool New tool 15/11/2011 R. Vuillermet

IBL : A small detector (compare to ATLAS) with many challenges in all domains ... 14/05/2012 R.Vuillermet