Setting-up MSU & Equipment handling WFP Logistics, We Deliver
Lesson Objectives By the end of this lesson, you will be able to: 1 Identify and assess equipment and verify completeness of inventory 2 Describe the process of frame layout and site layout 3 Assist with erection of storage equipment Execute basis operations and recognize the maintenance needs for standard warehousing equipment (E.g.: Generators, security lights and forklifts) 4
Mobile Storage Units (MSU) Assembly
WFP Kissidougou Forward Logistics Base Follow the link: https://youtu.be/5LKi80nggjE?list=PLAKQZOExh9hLweFrbi9QIBHfvVwbdVM5E
Mobile Storage Units (MSU) Assembly
Mobile Storage Units (MSU) Assembly
Mobile Storage Units (MSU) Assembly
Mobile Storage Units (MSU) Assembly
Mobile Storage Units (MSU) Assembly
Mobile Storage Units (MSU) Assembly
Mobile Storage Units (MSU) Assembly
Mobile Storage Units (MSU) Assembly
Mobile Storage Units (MSU) Assembly
Mobile Storage Units (MSU) Assembly
DO NOT PRINT IN WORKBOOK Diesel generators The main components DO NOT PRINT IN WORKBOOK
Diesel generators The need for maintenance Preventive maintenance A-Check: Daily Routine Checks DO NOT PRINT IN WORKBOOK B-Check: Every 300-350 running Hrs C-Check: Every 800-1500 running Hrs
The need for maintenance Diesel generators The need for maintenance DO NOT PRINT IN WORKBOOK
The consumption calculation Diesel generators The consumption calculation DO NOT PRINT IN WORKBOOK
Diesel generators The consumption calculation Rapid exercise in group: What is the total running hours? What is the total fuel consumed? Whart is consumption per hours? What is the cosumption per day (8 hrs)? DO NOT PRINT IN WORKBOOK Solution: Total running hours (in time) 35:35 Total running hours (in number) 35.58 Total fuel (in liter) 77.00 Consumption per hour 2.16 Consumption per day (8 hrs) 17.31
Diesel generators Forklifts DO NOT PRINT IN WORKBOOK Electric reach truck Order picking 1 – 2.5 tons Inside Waherehouse Electric Counter balance truck Stacking 2.5 – 4.5 tons Ideal on Emergency hubs (Existing in rough terrain, 4x4 versions) Telescopic Handler Stacking 4 – 10 tons Ideal on Emergency Hubs Heavy duty Multi tasking
DO NOT PRINT IN WORKBOOK Handling Equipment Forklifts Follow the link: https://youtu.be/d1uEMJYLS5g?list=PLAKQZOExh9hLweFrbi9QIBHfvVwbdVM5E DO NOT PRINT IN WORKBOOK
Equipment handling exercises Forklift exercise: Participants are shown basic operations and go about a small circuit where they have to pick up an empty pallet and place on top of a stack of empty pallets. Generator exercise: As a group, participants are shown the components and the basic daily check routine. Individually and in turn, they have to demonstrate the daily check and explain to the facilitator what they are doing. Security lights: Participants have to deploy the light, do the daily routine checks and start the generator on the unit. DO NOT PRINT IN WORKBOOK
Setting-up an MSU and equipment handling The group will be led outside and will start the MSU Assembly. From 09:00 to 15:00 – MSU Assembly (Lunch from 12:00 to 13:00) From 15:00 to 17:00 – Handling equipment (Split the group: Half on the Forklift and half on the generator and the security lights) DO NOT PRINT IN WORKBOOK
Questions WFP Logistics, We Deliver