CMS GEM services: Cooling

Slides:



Advertisements
Similar presentations
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
Advertisements

OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
RBX Cooling Dan Karmgard for the HCAL RBX Group. 1 Mar 01 2RBX Production Readiness Review - D. Karmgard, University of Notre Dame Outline Introduction.
Test 1A Same material Voluntary Outside regular class.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
Lesson 5 Fluid Systems.
GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
LIEBE project: WP3 – Construction and tests Project coordination meeting – 30/01/ /01/2015 LIEBE project meeting1 M. Delonca on behalf of the WP3.
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Cooling System Solutions
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
CLEX TBM T0 Cooling system Design strategy 1 V. Soldatov, A. Vamvakas, BE-RF
Organising 904 RPC lab Ian 23 April Already done, ISR I3-I4 tunnel is empty. Move out and chamber/gap sorting done in the ISR. Manpower available.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
A two-stage system for the future cooling system.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
LHCb Muon Station Cooling Studies (done by Ricardo Antunes Rodrigues (ST/CV)) This simulations were made for the Muon Station 1, with the follow assumptions:
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
RFQ Cooling Schemes and Instrumentation PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Andrew Lambert - Engineering Division Lawrence Berkeley.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
DCal-ALICE integration and installation plan and status A. Tauro.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
6.5 Recommended Velocity Of Flow In Pipe And Tubing.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
GEM Integrated PCB readout and cooling
Corrosion of Brass quick connectors on Yoke Cooling circuit
Integration and Services RE3/1 and RE4/1
Integration and Services RE3/1 and RE4/1
Gas Detectors (GEM) The 6th Egyptian school for high energy physics
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
YE2 – YE3 distance Manual measurements
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
cooling and supports of the forward endcap EMC
SPS cryogenic proximity equipment and SM18 validation
Mini-drawers, FE-ASIC , Integrator
Integration issues at IHEP
EMU Slice Test Run Plan a working document.
Chamber Design and Integration RE3/1 and RE4/1
Insertable B Layer Cooling System
Overview of T1 detector T1 is composed by 2 arms
CO2 Cooling IPNL Nick Lumb, 28/01/09.
RPC SYSTEM LAYOUT and DIMENSIONS
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

CMS GEM services: Cooling P. Tropea – CMS Gem Workshop III, 18-20 April 2012

P. Tropea - CMS GEM Workshop 18 April 2012 GEM Cooling Introduction What? Chamber on-board cooling design & performances are described in Antonio and Andrey presentations. 34 W per chamber, distributed on 30 VFAT (1W each) and 1 HV divider (4 W). Typical need of about 1.7 l/min for each chamber in order to extract the power and keep very low ΔT on water along the circuit, as indicated by CFD studies. How much? 36 double chambers for each station of GE1/1 (on CMS nose) 18 double chambers for each station of GE2/1 (on YE1) Power to be cooled on each station: GE1/1: 2.45 kW +z, 2.45kW -z GE2/1: 1.22 kW +z, 1.22 kW –z Total power: 7.35 kW How? Existing cooling system on CMS Endcaps, with demineralized water: can we re-use it? P. Tropea - CMS GEM Workshop

The design performances 18 April 2012 The CMS Endcap cooling circuit The design performances Existing systems on YEs Demineralized water cooling system dedicated to copper circuits Specification: Total flow: 1200 l/min Total power: 170 kW as per spec EDMS 440027 Pureness of water: demineralized water, 0.5 mm strainers Some margin exist on the total available flow and power, to be verified by tests! This circuit feeds, on all YEs: RPC chambers CSC chambers HE-RBX LV cable trays Disk cooling HE cable trays P. Tropea - CMS GEM Workshop

The Endcap cooling circuit 18 April 2012 Schematics of the existing cooling system The Endcap cooling circuit Schematics based on design (V. Delachenal): to be updated with as-built and measurements of performances (1 flow meter on each end) P. Tropea - CMS GEM Workshop

The Endcap cooling circuit 18 April 2012 YE1 cooling manifold The Endcap cooling circuit GE 1/1: 36 double chambers to be connected to the 18 cooling loops now in use for HE-RBX only – 2 chambers in series on each loop GE 2/1: 18 double chambers to be connected to the 18 cooling loops now in use for RE 2/2 and RE 2/3 chambers (on each loop: 1 GE 2/1, 2 RE 2/2, 2 RE 2/3 in series) Flow rate is regulated to 2 l/min on each circuit 2 1 P. Tropea - CMS GEM Workshop

P. Tropea - CMS GEM Workshop 18 April 2012 YE1 cooling manifold and available ports The existing system YE1 manifold: 3D “as built” model by Boki Based on measurements on the peripheral connections & PSL cad drawings Missing data on the part after the manifold: model to be completed after LS1 measurements P. Tropea - CMS GEM Workshop

P. Tropea - CMS GEM Workshop 18 April 2012 GE 1/1 manifold Existing System Basic schematics existing for the nose region cooling: to be transformed into a 3D as built model Open questions: connectors? Series/parallel of chambers? P. Tropea - CMS GEM Workshop

Reuse of YE cooling for GEM project 18 April 2012 Outlook Reuse of YE cooling for GEM project Finalize the flow needs for the different chambers: optimization of cooling contacts, tests. Series/parallel feeding of chambers to be defined Finalize the on-board design, based on fluid velocity (<1.5 m/s) & water quality (no pipes smaller than 6 mm ID, no Al or brass components can be foreseen) Specify the max flow rate needed for the full YE cooling circuit and compare with max flow available on pump (keeping in mind an additional 5% flow on the Endcap circuit already added with respect to design by RE4 station) Study the integration and connectivity system for the new chambers (profit of LS for on-site measurements and development of 3D as built model) P. Tropea - CMS GEM Workshop