DEVELOPMENT AND DEPILLARING WITH CONTINUOUS MINER

Slides:



Advertisements
Similar presentations
AUSTAR COAL MINE A2 MAINGATE ROADWAY DEVELOPMENT Experiences and Lessons Learned Presenter Glenn Sobey Development Mining Engineer Austar Coal Mine.
Advertisements

2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
Introduction of Continuous Miner Monitoring at Clarence Colliery ACARP Roadway Development Workshop Introduction of Continuous Miner Monitoring at Clarence.
General Information  Mine Started on :  Extractable reserves: 17.5 MT  Mine leasehold area: 4.6 Sq. Km  Workable seams ==>1. Queen Seam (thickness.
1Copyright © Xstrata plc Tensionable Tendons Phil Howes Tahmoor Colliery.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
UTILIZATION OF BOOSTER FANS IN UNDERGROUND COAL MINES
Development Taskforce Presentation
Design Optimization of Longwall Chain Pillars
The 30M2 Continuous Miner. Customer Name 30M2 Overview %Heavy duty high power miner for mid-height seams %High productivity from efficient cutting and.
Fall Protection and Ladder Safety Training. Course Outline  Introduction  Fall Protection  Ladder Safety  Wrap-up.
DRIVAGE OF INCLINES IN MANDLA NORTH COAL MINE of Jaiprakash Associates Limited, Noida by by M N Jha & M S Sandhu 1.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Reinforced Concrete Design II
1 2 Outline Airflow Measurements –How to take air readings –Measuring areas –Mean Entry Velocity Principals of Airflow When and Where to take Air Measurements.
Pike River Coal Mine ACARP Presentations August 2008 Peter Whittall – General Manager, Mines PIKE RIVER COAL.
Control of Airborne Respirable Dust Hazards: A Training Program for Underground Coal Miners The Penn State Miner Training Program University Park, PA
MSHA MINE EMERGENCY OPERATIONS MSHA has three mine rescue stations. Each station has different response vehicles. The stations are: 1) Pittsburgh National.
Australian Coal Mining
Amrit Prakash Jonko 08MN23.  A method of mining whereby high value ore is mined in such a manner as to make the low-grade ore left in the mine incapable.
16 Beltana Development ACARP Roadway Development Operators Workshop Sept
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
ACARP Presentation Cutting A Smarter Metre Process optimisation techniques currently being utilised.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Using Belt Air to Ventilate Active Working Areas.
ACARP Roadway Development - Operators Workshop March 2008
Technologies and Equipment to Control and Improve UNDERGROUND MINE SAFETY Lunagas Pty Limited Beijing, CHINA, Beijing, CHINA, April 2004 Les Lunarzewski.
Preventing Silicosis in the Mining Environment. 1.Prevention of Silicosis to Improve Mine Workers Health and Quality of Life. 2. Compliance with MSHA.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Contestant Briefing Hello I am ______and this is ________. You are to conduct a Pre-shift examination of the Bee No. 1 head gate section, for the oncoming.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Week 8. COAL Timing Will Be Big Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year by.
ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for.
On-Shift Examination Scenario Continuous Miner Section What you will need: Pencil and paper to take notes or perform calculations Calculator to calculate.
ACARP Roadway Development Operator Workshop No 7 A Systems Approach to Roadway Development Mick Kelly, BMA Coal.
Dust Control Training Program for Underground Personnel
Coal Mine Serious Accident Operator: Excel Mining, LLC Mine: Mine No. 3 Accident Date: November 29, 2011 Injured: Travis w. Pigg Classification:
1 Beltana Development. 2 Beltana Overview Process Control Continuous Improvement Summary.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Experience with Mining through Surface to Seam Large Diameter Boreholes. 26/11/14 Scott Dennis – Appin Mine.
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
Pre-Shift Examination Scenario Continuous Miner Section What you will need to complete this exercise: Pencil and paper to take notes or perform calculations.
A ventilation curtain was hung from the roof bolt plates and extended across the last open crosscut. The ventilation curtain was rolled up by the victim.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Indiana Mine Rescue Statement 2013 Thank your for assisting us with our emergency at the Vincennes No. 1 Mine. You are located at the fresh air base established.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Date - 01/02/2003 San Juan Coal Company Thermal Coal Customer Sector Group 1 #BHP Roof Control Jeopardy.
Remote Reading Tell-tale Systems in Underground Mines Chris Wagner Strata Engineering (Australia) Pty Ltd.
AUTOMATED DRILLING IN UNDERGROUND MINES
HIGH WALL MINING PRATEEK SHARMA B.TECH MINING II YEAR
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
CLIC Civil Engineering Update
Thin seam mining MINE PORTAL TEAM CALL/WHATSAPP
SBN Far Detector Installation & Integration
Challenging Geotechnical Doctrine with Datalogged Instrumentation
CMM activities in Kazakhstan - Current status and potential prospects
Who Wants to be a Miner? Sample Question You will work in groups
Objectives Upon completion of this module you should be able to:
Extension SR1 WP3 Electrical installations
ELECTRIC SHOCK AND EARTHING
HYDRAULIC POWERED SUPPORTS By DC Ratkuria. POWERED SUPPORTS Hydraulic powered roof supports are self advancing structures which are interconnected along the length.
North Goonyella Mine Longwall Health, 8th June 2017
REVISION 1 1. Foundations.
William Lawrence Geowork Engineering
HERO UNIT Training Module
Roof Control Jeopardy.
LIFT,ESCALATOR AND MOVING WALKS
2019 Governor’s Cup PRESHIFT CONTEST Roof Control Plan
MINING OF THICK COAL SEAM COAL MINING METHOD BY DC RATKURIA
Presentation transcript:

DEVELOPMENT AND DEPILLARING WITH CONTINUOUS MINER

Diagram of a mine with longwall and continuous mining system

Room and Pillar working – utilising continuous mining systems

FIRST WORKINGS First workings are conducted for two main reasons: To develop the pillars, bords and/or panels to enable their subsequent extraction, and To develop multiple main entries for access to the coal reserves. These entries are supported in the long term by the pillars consequently formed.

FIRST WORKINGS The number of development headings driven in any area of workings can vary between two and eight. This is dependent primarily on the purpose of development, and the second method of working together with the following factors: Mine capacity, Pillar and /or pillar and panel system relating to depth of working, productivity and panel extraction system, Number of continuous miner units operating, Coal clearance system, Men and material transport, and Ventilation.

FIRST WORKINGS

Typical Development Layout The standard layout consists of a five road development, with the main conveyor and feeder breaker positioned in the central roadway. This provides working areas to carry out all the main development functions: One heading for the CM to be cutting One heading ready for cutting One heading for ventilation rearrangement and survey work One heading for cleaning by LHD One heading for supporting by Quadbolter

OPEN ENDED LIFTING – METHOD A

OPEN ENDED LIFTING – METHOD B

SPLIT AND FENDER This is the most common method of pillar mining. The pillars are usually square or rectangular with dimensions dependent on the depth of working. Typically a pillar dimension of 45 x 45 meter is used at depth of around 450 m. Basically the pillars developed by the first working are split into sub-pillars and the fenders are then lifted (mined). The width of the lift is governed by the length of the continuous miner, roof conditions and support rules of the individual mine. Generally the split is supported by roof bolts or other means of supporting, depending on the timing of the mining. Roof bolting and W-straps were supplemented with timber props and bars.

SPLIT AND FENDER The lifting operation took place usually towards the goaf side with the pillar, with the basic philosophy of working adjacent to a competent rib.  However, in mines with competent roof conditions, lifting from both sides of the split was possible, and with the approval of mine inspectorate.  When extracting on both left and right, pillars up to four meters in width were left in the fenders to provide temporary support. However, the current system of splitting with mobile breaker line supports, lifting from both sides of the split is standard practice. A small stook (support Buttress) of coal seam ( min width 2.0m) is normally left to control caving, particularly on the goaf side.  

Typical De-pillaring layout

PRICE LIST OF DIFFERENT MACHINERIES IN THE CM PANEL Sl. No. Equipment Quantity Country of Origin Unit Price US $ Total Price 1 Continuous Miner 12CM15-10D 1 no. USA 2,791,265.00 2 Shuttle Car 10SC32B 2 no. RSA 934,617.00 1,869,234.00 3 Feeder Breaker BF14B-3-7C 743,312.00 4 Quad Bolter Australia 1,183,225.00 5 Electrical Equipment UK 971,115.00 TOTAL PACKAGE VALUE – US DOLLARS 7,558,151.00 (US Dollars Seven million Five hundred Fifty Eight thousand one hundred Fifty One only)

SHUTTLE CAR 10SC32

ROLE OF SHUTTLE CAR IN THE OVERALL PROCESS. The function of shuttle car is to transport the coal that is sheared by continuous miner from the face to the place where feeder breaker is installed. Capacity of a 10SC32 shuttle is 10.19 tons and the fill factor is about 0.85.

Joy Shuttle Car Model 10SC32B Specifications General Type : JOY 10SC32 Operating voltage: 1050 V Voltage Rating: ±10% Total Rated Power: 202.6kW 2 × 85 kW Traction Motors 1 × 18.6 kW Conveyor Motor 1 × 14 kW Pump Motor Weight 20,500kg (approximately) empty Cubic Capacity : 10.19cu meters Dimensions (l × w × h): 8.99m × 3.05m × 1.31m Ground clearance: 290mm (Nominal) Ground Bearing Pressure: 520 kPa empty; 830 kPa loaded Gradient (in line of advance): Below 6 degrees. If greater than 6 degrees, a new gear with reduction of 66.56: 1 could be used. Cross gradient: not greater than 5 degrees Total Service Life: 1.5 million tones

SPLIT AND FENDER

SPLIT AND FENDER

SPLIT AND FENDER

Split and Lift using Breaker Line Supports

Split and Lift using Breaker Line Supports

Breaker Line Support (BLS) Advantages. Greater positive setting loads and roof support on goaf edge . Cost saving in timber usage to defray their capital cost. Able to be reset to the new breaker line position as extraction takes place faster than timber breaker lines can be set. Increases potential continuous miner cutting time and productivity. Through remote control they remove the active goaf edge area personnel who would be required otherwise to set the breaker-line props thus further improving safety.

MOBILE BREAKER LINE SUPPORT

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel Remote Reading Telltale (3m + 10m) Remote Rib Exto. (3m + 10m) 1 2 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 3 1 2 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 3 4 1 2 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 2 x 2.4m SG bolts (breaker line) 5 3 4 6 1 2 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences 6 Extraction sequence Remote Reading Telltale (3m + 10m) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 5 3 7 4 6 8 1 2 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 5 7 9 3 4 6 8 10 1 2 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 5 9 3 7 4 11 6 8 10 12 1 2 13 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 5 9 3 7 4 11 6 8 10 12 1 2 13 14 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 5 7 9 3 4 11 15 6 8 10 12 1 2 13 14 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 5 7 9 3 4 11 15 16 6 8 10 12 1 2 13 14 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 5 3 7 9 4 11 17 15 16 6 8 10 12 18 1 2 13 14 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 5 9 3 7 4 11 17 15 19 16 6 8 10 12 18 20 1 2 13 14 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 5 9 21 3 7 4 11 17 15 19 16 6 8 10 12 18 20 22 1 2 13 14 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 5 9 21 3 7 4 11 17 15 19 16 23 6 8 10 12 18 20 22 24 1 2 13 14 BARRIER PILLAR Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 5 3 7 9 4 11 17 15 19 21 16 23 27 6 8 10 12 18 20 22 24 1 2 13 14 25 28 BARRIER PILLAR 26 Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel 5 3 7 9 4 11 17 15 19 21 16 23 29 27 31 6 8 10 12 18 20 22 24 30 32 1 2 13 14 25 28 BARRIER PILLAR 26 Breaker lines installed for 3 rows before extraction commences Remote Reading Telltale (3m + 10m) 6 Extraction sequence 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Pillar stress cells (5m + 10m) Auto warning telltale (single height 10m – trigger 5mm) Remote Rib Exto. (3m + 10m) Auto warning telltale installed during pillar split

BARRIER PILLAR Proposed Monitoring Scheme CM1 Panel Remote Reading Telltale (3m + 10m) Remote Rib Exto. (3m + 10m) 5 7 9 3 4 11 17 15 19 21 16 23 30 27 32 6 8 10 12 18 20 22 24 29 31 1 2 13 14 25 33 28 35 BARRIER PILLAR 34 36 26 Pillar stress cells (5m + 10m) Breaker lines installed for 3 rows before extraction commences Extraction sequence 6 2 x 2.4m SG bolts (breaker line) Breaker lines installed during pillar split Auto warning telltale (single height 10m – trigger 5mm) Auto warning telltale installed during pillar split

OLD BEN METHOD – PANEL AND PILLAR EXTRACTION Developing multiple headings, usually three, to the limits of the area to be extracted. These panels, along with newly formed pillars (in the virgin coal) were extracted in retreat. Here, the secondary development consisted of three roads, leaving reserves for pillar extraction on either side. The total panel width was greater than 200 m. Tertiary development, consisting of three roads, was done towards the end of the panel to increase overall extraction. From this development, short fenders were then developed and extracted.

OLD BEN METHOD – PANEL AND PILLAR EXTRACTION

OLD BEN METHOD – PANEL AND PILLAR EXTRACTION

WONGAWILLI METHOD The Wongawilli system was developed at Wongawilli Colliery in the southern coalfield of New South Wales in the early 1960s. Generally with the Wongawilli system, a panel is created by a secondary development consisting of three to five roads and leaving a continuous pillar of coal between the development and the previously caved area. The pillar is normally between 50 m and 150 m wide and is extracted by developing and extracting 7 m wide ribs in a modified split and lift system. The pillars formed by the development are extracted as the rib extraction retreats. As a result of the length of the rib pillars, this method resembles a shortwall face.

WONGAWILLI METHOD This method was developed to provide a single working place to extract coal in a stress-relieved area and to utilize the coal seam as support during extraction. An overall extraction of 90 per cent was achieved by this system.

WONGAWILLI METHOD The main disadvantages of the Wongawilli system area: ➤ Excessive floor lift when splitting successive headings in a large panel ➤ Difficulties when removing stooks on the return run out of each heading ➤ Difficulties with ventilating rib pillar panels when the roof caves completely, thus filling voids in the goaf area and choking the ventilation flow.

WONGAWILLI METHOD 1. Provision of a single working place 2. Extraction of coal in stress relieved areas 3. Maximise extraction of the seam, 4. Simple system readily understood by all employees. The method provides; a) A straight goaf line b) Simple ventilation system, with air being coursed via the goaf, and c) Working within de-stressed areas.

WONGAWILLI METHOD

Rib pillar extraction method

Rib pillar extraction method

Rib pillar extraction method – systematic cutting and support sequence

Rib pillar extraction method – systematic cutting and support sequence

Rib pillar extraction method Panel Layout and Cutting Sequence The area allocated to rib-pillar mining is divided into workable sections, and the primary development normally consists of four roadways from the main development to the limit of the remnant. The two outer roads are utilized as return airways, and the two inner road travelling and conveyor-belt roads. The inner roads also serve as intake airways The secondary development consists of three roads, two being intake airways and one a return airway. Cross conveyor installations are used to ensure that the tramming distance for shuttle cars is minimized.