SiPM calibration Tagir Aushev (ITEP).

Slides:



Advertisements
Similar presentations
Scintillator Tile Hadronic Calorimeter Prototype (analog or semidigital) M.Danilov ITEP(Moscow) CALICE Collaboration LCWS04, Paris.
Advertisements

Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
Double Chooz: Outer Veto
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan 1.Introduction 2.Recent.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
1 A proposal of new simple system for testing a large number of MPPC for the R&D phase of GLD calorimeter 2007/Feb/6 ACFA ILC Workshop ICEPP, University.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
Tracking System at CERN 06 and 07 test beams Michele Faucci Giannelli.
Yannick Geerebaert LLR Ecole Polytechnique CNRS IN2P3 Palaiseau France INGRID Meeting / March 2008 / France March 2008 status MPPC TEST LLR S.
Measurement of the absolute efficiency,
Status of scintillator KLM study P. Pakhlov (ITEP)
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
SiPM: Development and Applications
R&D on W-SciFi Calorimeters for EIC at Brookhaven E.Kistenev, S.Stoll, A.Sukhanov, C.Woody PHENIX Group E.Aschenauer and S.Fazio Spin and EIC Group Physics.
The MPPC Study for the GLD Calorimeter Readout Introduction Measurement of basic characteristics –Gain, Noise Rate, Cross-talk Measurement of uniformity.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
Self triggered readout of GEM in CBM J. Saini VECC, Kolkata.
Study of the MPPC performance - R&D status for the GLD calorimeter readout – Nov 6-10.
Commissioning and Operation of the CMS Tracker analogue optical link system at TIF with CMSSW: R.Bainbridge, A.Dos Santos Assis Jesus, K.A.Gill, V. Radicci.
Status of HGL R&D collected significant test beam/cosmic data –analysis in progress (Chunhui, Hongkai) –preliminary results: good linearity energy resolution:
Scintillating Tiles for the Muon Inner regions LHCb Muon Upgrade meeting, CERN May Wander Baldini for the Ferrara LHCb group.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
AIDA Plans for WP9 in Bergen In an HCAL for ILD we have ~10 6 channels  corrections due to temperature changes ( Δ T) need to be done automatically online.
28 June 2007G. Pauletta: ALCPG Tests of IRST SiPMs G. Pauletta Univ. & I.N.F.N. Udine Outline 1.IRST SiPMs : baseline characteristics 2.first application.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Multipixel Geiger mode photo-sensors (MRS APD’s) Yury Kudenko ISS meeting, KEK, 25 January 2006 INR, Moscow.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Lecture 3-Building a Detector (cont’d) George K. Parks Space Sciences Laboratory UC Berkeley, Berkeley, CA.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
Ceilometer absolute calibration to calculate aerosol extensive properties Giovanni Martucci Alexander Marc de Huu Martin Tschannen.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
1 June 2015 Action for Our Future Parliament of Youth on Sustainability: An initiative of: Supported with grant funding by: Venue support by:
Module-0 of AFP ToF Detector Libor Nozka on behalf of ATLAS Forward Proton Group Palacky University 1.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan for the GLD Calorimeter.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Prototype Assemblying, SiPM Characterization and QC
IFR Detector R&D status
IFR Detector R&D status
Introduction to the physics of the SiPM
CEPC ScECAL Optimization for the 3th CEPC Physics Software Meeting
Andreas Horneffer for the LOFAR-CR Team
LHC Wire Scanner Calibration
Upgrade activities at Clermont-Ferrand
Planes, Telescope, System
Marcin Chrząszcz Cracow University of Technology Itamar Levy
EKLM: Progress and prospects
Prototype activities update
CMS Preshower: Startup procedures: Reconstruction & calibration
Christophe Beigbeder PID meeting
TC status & remaining tasks
Direct Dump Tests Modify
ITEP&MEPhI status report on tile production and R&D activities
Load-Pull Measurements
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Comparison of CPTA and Hamamatsu SiPMs
Testbeam analysis on module #1
Scintillator HCal Prototype
T2Kロシアグループに向けたMPPC(SiPM)の性能評価
The MPPC Study for the GLD Calorimeter Readout
Presentation transcript:

SiPM calibration Tagir Aushev (ITEP)

Proposal There 18 000 SiPM’s must be calibrated SiPM’s properties vary from one to another some SiPM’s can be bad to optimize total efficiency, all SiPM are preferable to have similar gain/efficiency/etc. and to reject the bad one Some tests are already done in both, ITEP and U of Tabuk using small number of SiPM’s calibrated simultaneously New device will calibrate a large amount of SiPM’s reduces the total calibration time to reasonable level (1-2 months) The proposal is to develop such a device with combined efforts of ITEP and U of Tabuk groups, who have some experience in it

Testing SiPMs at the U Tabuk done for Large Angle Beamstrahlung Monitor(LABM) by R. Ayad, C. Boulahouche, J. Madani to detect synchrotron radiation at large angle (beamstrahlung) to study beam-beam effect Later SiPMs from Advansid(Italy) to be used to save size in the optical Box and for robustness Optical Box: First we use PMs

SiPM tests at U of Tabuk Lab DAQ Dark Pulses and baseline change With temperature Channel by Channel Threshold Finding

Plans & schedule First step is to develop the principal scheme of the device 3 person x month Build a low channel prototype 4 person x month Develop DAQ system to collect, store and manage data Write a software to automatically analyze data from SiPM’s The building of the prototype can start now there is an available funding of about $25k We (ITEP & U of Tabuk) submit soon application for Grants in SA the decision will be made around June, 2013 The man power for the calibration will be provided by U of Tabuk

Backup

SiPM operation ΔHV = 1.4 V ~ 70 V 1 – 1.5 V HV = HVbreak down + ΔHV HVbreak down strongly depends on temperature: ~ 57mV/°C; all important for us SiPM characteristics (gain, efficiency, xtalk, noise) depends only on ΔHV – independently of temperature! choose working point: efficiency < saturation noise (at 0.5 p.e.) < 1 MHz xtalk < 20% to have maximum efficiency but staying in the linear region (robustness against temperature changes) SiPM noise (@ 8 p.e. threshold) < 1kHz << neutron bg rate To stay at the operation point it is sufficient to adjust HV to keep gain constant at chosen value ΔHV = 1.4 V

SiPM data base & distributions For 200 SiPMs available at ITEP we measured main characteristics and put them to SiPM db No big spread! Do we need calibration for the rest 18000 SiPMs?