Ed Daly for W. Robby Hicks

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Material choice Ofelia Capatina OC, Material choices Discuss material choices for – Helium tank – Flanges, joints, bellow OC,
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Industrial Studies of ILC Cavities & Component Production in the Americas IPAC 11 – Kyoto, Japan May 23, 2010 Science Projects Homeland Security Medical.
SPX - Cavity WBS U , U , U Genfa Wu SRF Scientist Accelerator Systems Division/RF Group DOE Lehman CD-2 Review of APS-Upgrade.
INTRODUCTION Definition:
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
Advanced Energy Systems, Inc. Prototype Cavity Fabrication & Test Presented by Ilan Ben-Zvi, BNL for Michael Cole, AES.
1.3GHz Input Coupler for ILC
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
56 MHz SRF Cavity and Helium vessel Design
October, 2009 Cost of SRF Components Gary McIntyre October, 2009 Internal Review.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
Mechanical design considerations for beta=1 cavities OC, 28/July/20111SRF2011 Chicago O. Capatina, S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo,
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Hao Guo LINAC Department Institute of Modern Physics.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
All Metal Gate Valve from VAT
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Cryomodules Matthew Howell and Stephen Stewart Cryomodule Design Team Members.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
IFMIF Power Coupler for HWR Superconducting cavities SRF LINAC GROUP H. Jenhani 1, N. Bazin 1, P. Bosland 1, B. Branas 2, P. Brédy 1, P. Carbonnier 1,
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
Adjustable tuner HENRY PRZYBILSKI / PIERRE-ALAIN LEROY.
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
SRF Advances for ATLAS and Other 
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
First Wall Panel - Overview
LCWS11 WG4 Fully featured accelerating structure engineering design
PIP-II SSR1 Cryomodule Technical Issues Leonardo Ristori TTC Meeting
CERN – Zanon discussions
(4 areas/website front)
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Fredrik Fors Mechanical Engineering, JLab 09/29/2016
Superconducting RF Crab Cavities
IHEP Cryomodule Status
Cryomodule Assembly Plan
SNS PPU Helium Vessel Design and Assembly
SNS PPU Cryomodule Vacuum Vessel
SNS PPU Helium Vessel Design and Assembly
SNS PPU Cryomodule Thermal Shield & MLI
SNS PPU Cryomodule Design Overview
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
HWR and Test Cryomodule for China ADS
Presentation transcript:

Ed Daly for W. Robby Hicks C100 Helium Vessel Ed Daly for W. Robby Hicks

Outline Introduction Design verification Show design satisfies requirements Design validation Show design was validated through testing and prototype Fabrication Cost comparison Summary

Introduction to C100 Helium Vessel Design presented is part of 12 GeV Upgrade Project at JLAB Requires 10 each 100 MV cryomodules (C100) Requires 80 cavities (7 cell, 1497 MHz, CW) Production schedule spans FY09,10 and 11. Original design used Titanium Helium Vessel Two versions installed in three prototypes New design uses Stainless Steel Helium Vessel Motivation – reliability, cost, manufacturing

Requirements for C100 Helium Vessel Maintain interface for: Tuner mechanism Helium circuit Assembly Tooling Nitronic rod support system Incorporate a cavity alignment feature (with fabrication/assembly tolerance stack-up < .010” RSS)* Provide transition from Nb beam-line to SST helium circuit Transmit 820 lbf tuning force Support an internal pressure of 5 atm (@ 4.5K) Support an external pressure of 2 atm (@ 300K) Consistent with Cavity Processing Techniques

Design Verification Cryomodule assembly tooling attachment points Tuner attachment point Nitronic rod support system brackets (x4) Niobium to SST transition Slide shows the interfaces with tuner nitronic rods and assembly tooling

Design Verification Helium circuit inlet and outlet Shows interfaces with helium circuit and alignment feature Helium circuit inlet and outlet Machined alignment feature (fabrication/assembly tolerance stack-up ~.009” RSS)

Design Verification Tuner installed and successfully tested in HTB No binding! Tuner installed and successfully tested in HTB

Design Validation Helium vessel design was validated by: Thermal shock in liquid nitrogen & leak check of braze joint (x3/joint) VTA cycle to 2K (x2/cav) Thermal cycle to 2K in HTB (x1) Functionally tested in HTB Pressure test of “Helium Vessel Head Test Fixture” Note : HTB is the Horizontal Test Bed – a facility for testing up to two cavities with cryomodule boundary conditions 4 prototypes and 4 production brazements Production brazements were ebeamed into cav assy C100/HTB cavity string installation

Helium Vessel Head Test Fixture Design Validation Pressure Test: Design pressure is 75 psi Test fixture was pressurized to 82.5 psi* (110% of the design pressure) Helium Vessel Head Test Fixture *TOSP A-06-021-T

Fabrication Process Stainless Steel Helium Vessel 1- Braze joints (x2) 3-SST TIG welds 2- Heater installation! Stainless Steel Helium Vessel

Fabrication Process SST Plug Nb Tee SST Transition plate Braze joint components: 1) Machine parts with proper joint clearances (.001”-.004” radial) 2) Transition plate outer features are post machined 3) Weld preps on Nb tee are post machined 4) Alloy is cut to shape (~.015 thk) Parts prepped for brazing: 1) All parts cleaned in ultrasonics With Micro 90 and DI rinsed for 20 minutes 2) Parts are triple rinsed with pure DI water and dried with dry nitrogen 3) Stainless parts are etched (nitric 30%, hydrofluoric 4%, water 66%) for 1 hour 4) Nb parts are etched with BCP 1:1:1(nitric, phosphoric, hydrofluoric) for 1 minute 5) Parts are dried with dry nitrogen and sealed in clean nylon bags SST Transition plate Nb Tee SST Plug

Fabrication Process Braze alloy 50/50 Au/Cu (Premabraze 402) liquidus 969°C/solidus 954°C Not affected by subsequent BCP ~0.015 thick foil and .060 wire 1010°C Allowed to conductively and radiatively cool, about 100C might purge with dry nitrogen Some alloy ran out, really needed 0.012 thk. ~$400/troy oz.

Cost Comparison Total cost savings* = $164,000 Based on: Price per pound for SST of $4.03 (2/07) Price per pound for Ti of $22.50 (2/07) Substituting historical prices for: Explosion bonded joints (3/02) Braze alloy (12/06) Ti bellows (3/03) SST bellows (11/06) Cost savings = $2,050 ea. For 80 helium vessels: Total cost savings* = $164,000 SST He Vessel ≈ $2,280 ea.* Ti He Vessel ≈ $4,330 ea.* * Does not include labor

Summary HTB test verified that the design meets the requirements Design has been validated through HTB test and prototype testing The SST helium vessel is easily fabricated using standard machining, welding and brazing techniques The SST helium vessel has significant cost savings versus the Ti design “The potential advantages of moving to a stainless steel helium vessel are significant both for the 12GeV upgrade and future machines. This effort is to be commended and should be continued.” Final Report, JLab 12 GeV Upgrade Cryomodule Review, Belomestnykh, S., Walker, N., Weisand II, J.G.