AMI Enterprise Task Force of the Utility AMI Working Group

Slides:



Advertisements
Similar presentations
ICANN Plan for Enhancing Internet Security, Stability and Resiliency.
Advertisements

Knoxville, TN Oct. 19, 2009 AMI-Enterprise Systems Requirements Specification Overview.
Advanced Metering Implementation Team Completion Road Map Discussion Through 2013 and Transitional Steady State Revision Date December 6, 2011.
Revision Date October 16, 2012 Advanced Metering Implementation Team Projects Completion Road Map Discussion Through 2013 and Transitional Steady State.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Workforce & Engineering Design Optimization Plenary Session: Enterprise Resource Planning for Infrastructure and Utilities Gurgaon India Feb GIS.
Knoxville, TN October 20, 2009 OpenADE Status and Plans Dave Mollerstuen
BIM Sarah Birchall and Jo Harris 25 th September 2014.
Smart The Grid Plenary Panel: Smart Grid Interim Roadmap Draft and Processes Joe Hughes, EPRI Erich Gunther, Enernex Frances Cleveland, Xanthus Consulting.
OpenFMB Specification Development Plan
8/28/2005ECEN5543 Req Elicitation1 Targets of Requirements Engineering ECEN 5543 SW Engineering of Standalone Programs University of Colorado, Boulder.
1 IS 4420 Database Fundamentals Chapter 2: Database Development Process Leon Chen.
Enterprise Resource Planning (ERP)
© 2011 Infotech Enterprises. All Rights Reserved We deliver Global Engineering Solutions. Efficiently.August 8, 2015 Infotech Service Offerings Rajnish.
Software Architecture April-10Confidential Proprietary Master Data Management mainly inspired from Enterprise Master Data Management – An SOA approach.
Enterprise Architecture
Learning and Development Capgemini North America June 2009.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
DOCUMENT #:GSC15-PLEN-53 FOR:Presentation SOURCE:ETSI AGENDA ITEM:PLEN 6.11 CONTACT(S):Emmanuel Darmois, Board Member Marylin Arndt, TC M2M chair Smart.
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Status Report (Palo Alto, Jan. 09) Joe Zhou.
IEC TC57: Report on WG21 Interfaces and protocol profiles relevant to systems connected to the electrical grid P. Ferstl August 2012 INTERNATIONAL ELECTROTECHNICAL.
Standards Certification Education & Training Publishing Conferences & Exhibits 1Copyright © 2006 ISA ISA-SP99: Security for Industrial Automation and Control.
AMI Enterprise Developing Interoperability for Distribution Systems January 2009 Terry Mohn, Technology Strategist SDG&E Vice Chairman, GridWise Alliance.
Dec UtilityAMI OpenHAN TF Requirements Working Group Specification Briefing January 2008.
Last Updated 1/17/02 1 Business Drivers Guiding Portal Evolution Portals Integrate web-based systems to increase productivity and reduce.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
Managers Guide to AMI Enterprise. AMI Enterprise What it is Why you need to be involved How you get involved Who from your organization needs to be involved.
OUTCOMES OBJECTIVES FUNCTIONS ACTIONS TERRITORIES LOCATIONS MARKET SEGMENTS TIME LINESCHALLENGE IMPACT RESOURCESACTIVITIESCHANNELS RELATIONS PARTNERS CUSTOMERS.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
SQA project process standards IEEE software engineering standards
SAP and IBM Delivering value together
CIM Modeling for E&U - (Short Version)
Regulatory ‘Do’s’ and ‘Don’ts’ for DSOs to serve consumers’ interests Garrett Blaney co-chair, CEER Distribution Systems Working Group CEER Annual Conference.
Software Configuration Management
SQA project process standards IEEE software engineering standards
Component 11 Configuring EHRs
ESB Networks IT Market Retail Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
The Enterprise Relevant Scope of DM
UGI Utilities SAP 1 Year Later Update
Overview of Electronic Commerce
Enterprise Resource Planning (ERP)
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid Overview] Date Submitted: [13.
Cybersecurity Special Public Meeting/Commission Workshop for Natural Gas Utilities September 27, 2018.
IEC TC57 Smart Grid Activities
Organizing Semantics For Effective Enterprise Application Integration
OpenADR SRS Draft 1 Review
A Process View of the Supply Chain
Smart Grids activities in ETSI
Software Requirements Specification (SRS) Template.
Procurement Services Transformation 2012 Company Forum – 28 Feb 2013
Employee engagement Delivery guide
“OpenADR” “Boot Camp” Overview
Requirements Document
Use Case Process with Examples Kay Stefferud
A project for the - IST-program
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
IEEE RS Standards Status and Descriptions
DER Growth Scenarios and Load Forecasts Working Group
Procurement Services Transformation 2012 Company Forum – 28 Feb 2013
UML Design for an Automated Registration System
OU BATTLECARD: Oracle Utilities Learning Subscription
Presentation transcript:

AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Status Report (Palo Alto, Jan. 09) Joe Zhou

SRS Team Status SRS team status since the Knoxville meeting: Developed first complete draft of the Logical Components and Functions Model Supported AMI-ENT service definition team activities including the CMS-AEP collaboration meeting Started to develop the first draft of the SRS document Guiding Principles Reference Architecture Requirements Goal is to make the first draft available for reviews by the March meeting.

AMI-ENT SRS Table of Content 1. Introduction 1.1 Purpose 1.2 Scope 1.3 Acronyms and Abbreviations 1.4 External Considerations and References 1.5 Document Overview 2. Overall Description 2.1 Architecture Guiding Principles 2.2 Architectural Considerations 3. AMI-ENT Reference Architecture 3.1 AMI-ENT Reference Model 3.2 AMI-ENT Logical Architecture 4. AMI-ENT System Requirements 4.1 Requirements Framework 4.2 Systems Requirements Specification 4·2.1 Functional Requirements 4·2.2 Technical Requirements 5. Appendices 5.1 Terms and Definitions

What is AMI-ENT Others??? Reference: Rendered from AMI System Security Requirements v0_93 Figure 5: Scope of AMI Systems

AMI-ENT Logical Components AMI-ENT SRS seeks to define a complete reference model that includes all logical functional components within and outside utility enterprise that are needed to deliver the AMI specific business functions. AMI Head-End AMI Meter Asset Maintenance AMI Network Asset Maintenance AMI Network Management AMI Service Manager C&I Customer Demand Resource Management Customer Information Analysis Customer Information Management Customer Presentment & Analysis (C&I) Customer Presentment & Analysis (Residential) Customer Relationship Management Distribution Engineering Analysis Distribution Management Distribution Operational Analysis Demand Response Management Distribution SCADA Enterprise Asset Management Energy Management Enterprise Service Bus Geographic Information Management HAN Management Meter Data Management Mobile Data Terminal Mobile Workforce Management Outage Management Power Market Management (ISO) Power Trading (MP) Revenue Protection Supply Chain Management Transformer Load Management Third Party Portal (AMI) Work Management Work Scheduling Gas related components?

Why the AMI-ENT Reference Model Because the current IEC 61968-9 reference model is limited to only basic metering related functions. Because the future use case analysis and the services being defined needed a stable reference model to be more consistent and reusable across implementations. Because it could serve as the vehicle to manage the scope and priorities of use case and services to be delivered. Because it could provide best practice architecture recommendations for those implementations that may want to leverage outcomes AMI-ENT effort.