Santiago in DEPFET for SUPERBELLE

Slides:



Advertisements
Similar presentations
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
Advertisements

Actividades de I+D en IGFAE/USC Pablo Vázquez (IGFAE-USC) IV JORNADAS SOBRE LA PARTICIPACIÓN ESPAÑOLA EN FUTUROS ACELERADORES LINEALES Madrid, 2-3 Diciembre.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Introduction Silicon Tracker project: design production Tracking strategy and performance Design and performance of the LHCb Silicon Tracker Kim Vervink.
D. Peterson, Cornell Univ., “Round table” 23-Jan-2003 Cornell Linear Collider Detector Research Cornell Interests: The Cornell group proposes to contribute.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
P3MD Labs Introduction to the facilities of the Purdue Experimental Particle Physics research groups.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
ALBA Synchrotron – 17 June 2010 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona First Measurements on 3D Strips Detectors.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
Panja Luukka1 Silicon beam telescope (SiBT) and MCz detectors: status and plans for 2008 Erkki Anttila, Sandor Czellar, Jaakko Härkönen, Matti.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
1 JRA2-SITRA status report Z. Doležal, A. Savoy-Navarro for JRA2-SITRA partners (LPNHE Paris, Ch.U. Prague, Helsinki, Santander) and associates (CNM Barcelona,
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
15 February 2007Dirk Wiedner / LHCb1 Radiation Monitors for LHCb.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Abraham Gallas for the LHCb Silicon Tracker Group 7 th International Hiroshima Symposium on Development and Application of Semiconductor Tracking Devices.
Peter Kodyš, October 10, 2005, DEPFET workshop, Munich, Laser testy – status in Prague1 Peter Kodyš, Zdeněk Doležal, Pavel Řezníček, Zbyněk Drásal, Jan.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
Test beam preparations Florian Lütticke, Mikhail Lemarenko, Carlos Marinas University of Bonn (Prof. Norbert Wermes) DEPFET workshop Ringberg (June 12-15,
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
Charles University Prague Institute of Particle and Nuclear Physics Zdeněk Doležal, Peter Kodyš, et al.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Advanced hybrid detectors in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Placket, Shipsey.
 Silicon Vertex Detector Upgrade for the Belle II Experiment
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
Simulated vertex precision
HR-HV CMOS activities and plans at Glasgow
10/month is the present production rate 2 FTE + sporadic contributions
EENP2 Silicon Detectors.
Development of the Data Handling Processor DHP
UCSB Short-term Testing Plan
Results from module testing
The digital read-out for the CSC system of the TOTEM experiment at LHC
UNIZH and EPFL at LHCb.
UCSB Short-term Testing Plan
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
Niels Tuning (Outer Tracker Group LHCb)
The digital read-out for the CSC system of the TOTEM experiment at LHC
Peter Kodyš, Zdeněk Doležal, Jan Brož,
Is Increased Bias Current and CMN Correlated?
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

Santiago in DEPFET for SUPERBELLE Pablo Vázquez IGFAE-USC

Our experience in Gas tracking detectors The MSGC/GEM detector for the DIRAC experiment in 1998: 4 planes, 2,000 channels R&D, construction, installation and operation

Our experience in Silicon tracking detectors We participate in the LHCb Silicon Tracker detector: 4 stations, 11m2 of Si-sensors, 300,000 channels

USC responsibilities: high/low voltage supplies, control, micro-bonding, enclousure boxes, quality assurance, installation The U. Santiago and the EPFL (Lausanne) built 400 modules for the 3 stations after the magnet

Power supplies of the LHCb Silicon Tracker High Voltage 240 floating channels for 600 modules 3 levels of patch panels Low Voltage 100 primary channels 1000 regulated channels Same partitioning for DAQ, supply and control

Control of the LHCb Silicon Tracker 60 boards Time and fast control Slow control and monitoring Voltage regulation Software for monitoring and control Registration of more than 5,000 variables User/Automatic control

Micro-bonding of the LHCb Inner Tracker More than 400,000 wire bonds Pitch adapter design Tested for long term stability 10 years of operation

Quality assurace of the LHCb Inner Tracker modules 48 h burn-in test cycling at +40/-5 Celsius Noise and common mode Delay scan for pulse-shape Shorted channels Unbonded/open channels Pinholes IV curve Metrology X,Y,Z

Santiago in DEPFET Equipment Clean room: 30m2, Class 100,000 (iso 8) Wire bonding machine Pull tester Manual probe station XYZ positioning Picoamp meter LRC meter Pattern generator DAQ Laser 1060nm PCB lab Etc. People Pablo Vázquez (tenure track) Abraham Gallas (tenure track) Carmen Iglesias (posdoc) Pablo Rodríguez (student) Eliseo Pérez (project) Javier Caride (project) Others (new posdoc,...) Tasks: ILC forward tracking simulation using Particle Flow

Santiago in DEPFET for SUPERBELLE We have experience in Power supplies, control, wire-bonding, testing Workpacages of our interest 1.4.3 Data Handling Hybrid (DHH) 1.7.2 Power Supplies with slow control We would like to clarify soon our responsabilities Strong interest in a module in Santiago to Get in touch with the technology Contribute to the lab tests for the collaboration Contribute to the test beam 2009