Future Ancillary Services Cost Benefit Analysis - Additional Runs and Analysis Julie Jin March 10, PRS.

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

Amendment 3/5 Workshop.
Valuing Load Reduction in Restructured Markets Supply Cost Curve Regressions Market Price vs. Value of Load Reduction Photovoltaic Case Study William B.
1 Presentation to the Wisconsin Industrial Energy Group (WIEG) T. Graham Edwards President & CEO August 9, 2007.
Quantifying Results Model Comparison Run models under various scenarios –Heavy load –Light load –Normal load Calculate cost reduction under new model.
FAST Procurement and Pricing May 18, 2015 FAST Workshop 1.
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
NGEIR Technical Conference Presentation May 16, 2006.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Future Ancillary Services (NPRR 667) Update March 26, 2015 TAC meeting 1.
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
Bill Hellinghausen EDF Trading North America
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Future Ancillary Services: Description of Pricing Proposals ERCOT Staff September 15,
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Future Ancillary Service Team (FAST) and Technical Advisory Committee (TAC) Workshop #2 ERCOT Staff August 25,
1 IMM Pricing Concerns with PFR and FFR Proposed pricing structure provides incentive for FFR to offer at less than cost. Dual clearing price pricing structure.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
Agenda Executive Summary Assumptions and PLEXOS Modeling
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management August 18, 2011.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
1 10. BUSINESS STRATEGIES IN ANCILLARY SERVICE MARKETS Asko Vuorinen.
CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013.
Future Ancillary Services Cost Benefit Analysis - Additional Runs and Analysis Julie Jin March 10, PRS.
Recent Behavior of the Responsive Reserve Market presented to the Demand-Side Working Group December 2005.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Principal Load Profiling and Modeling
“Other” Cost Estimates
Hourly Offers Schedule Update Examples
Wind Management at MISO
Exceptional Fuel Costs in LMP
Electricity System Cost Outlook
Appeal of PRS Rejection of NPRR 667
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Principles of Participation in Real-Time Co-optimization
Warren Lasher Manager, Long-Term Planning and Policy
Market Notice Regarding Off-line Units
Frontier Economics, Inc. Cambridge, Massachusetts
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Recommended Hydro Improvement April 11, 2017
Flexible Forward Contracts for Renewable Energy Generators
penetration of wind power
Basin Electric SPP Market Update
30 Minute Reserves EPFSTF January 4,
Reserve Products Interaction
Changing Market Dispatch
Sandip Sharma ERCOT Manager, Operations Planning
Recommended Hydro Improvement April 11, 2017
Study Results Drought Scenario Study
Oconomowoc Area School District December 2005 – July 2011
Wholesale Electricity Costs
Market Pricing Initiatives Update September 9th, 2003
Joshua Linn (MIT and Resources for the Future)
Market Pricing Issues: Update
Presentation transcript:

Future Ancillary Services Cost Benefit Analysis - Additional Runs and Analysis Julie Jin March 10, PRS

Additional Runs and Analysis 2016 with Gas Price @ $2.36/MMBtu vs. $4.35/MMBtu 2016 with Gas Price @ $2.36/MMBtu and New IFRO (@1143 MW vs. 1240 MW) 2016 with Gas Price @ $2.36/MMBtu, IFRO @1143 MW and New NSRS Requirements approved by Board in December 2015.

CBA Findings (Brattle Slide 7) CAS FAS Savings Comment Procure Less PFR by recognizing equivalency ratios and allowing more FFR (incl. FFR1) 2016 Avg MW 1,468 1,329 140 Allowing > 50% FFR; eliminates the need for buffer. Increasing FFR by 24 MW on average. 2024 Avg MW 1,453 1,325 129 Slightly less than 2016 due to higher net load & inertia. Increase FFR by 13 MW on average. w/new tech 1,267 186 Assumes 62 MW of new batteries reducing avg. PFR by 57 MW; because residual avg. FFR opportunity (after load resources are considered) is only 62 MW and highly variable Replace Non-Spinning Reserve with less CR and SR (the products are comparable because of common NSRS/CR/SR duties and supply base) 1,931 1,175 756 FAS adapts requirements relative to system conditions; additionally CR is determined based on frequency obligations, and Non-Spinning Reserve is determined to meet deviations in net load. 2,000 1,210 790 See above (note: assumptions about new tech do not affect CR)

Additional Runs and Analysis CAS FAS Savings Comment Procure Less PFR by recognizing equivalency ratios and allowing more FFR (incl. FFR1) 2016 Avg MW w/gas @ $2.36/MMBtu 1,384 1,307 78 MW saving is less than the original 2016 CBA case due to CC replacing coal under lower gas price analysis . 2016 Avg MW w/gas @ $2.36/MMBtu & new IFRO 1,214 170 MW saving is higher than Row 1 above because the lower IFRO allows more FFR. MW saving is higher than in the original 2016 CBA. Replace Non-Spinning Reserve with less CR and SR (products comparable because of common NSRS/CR/SR duties and supply base) 2016 Avg MW w/ gas @ $2.36/MMBtu 1,931 1,215 716 CR increased because CC replaces coal under the lower gas price analysis which also increases system inertia. 2016 Avg MW w/ gas @ $2.36/MMBtu & new IFRO New IFRO didn’t change unit commitment. 2016 Avg MW w/ gas @$2.36/MMBtu, new IFRO & new NSRS 1,571 356 Based on the new NSRS method approved by Board in December 15. The reduced NSRS requirement (compared to original 2016 CBA case) reduces savings.

CBA Findings (Quantified Annual Benefits) (Brattle Slide 10) In 2016, PFR reduction provides high DA production cost savings (DA PCS) per MWh because it enables greater coal dispatch. 2024 has higher net load, so coal is more fully baseloaded. Real-time opportunity cost savings (RT OCS) analyzed through historical AS bids. Compare these annual benefits to ERCOT’s one-time implementation cost of $12-15m.

Additional Runs (Quantified Annual Benefits) In Case 2016 w/ gas price @ $2.36/MMBtu, the day-ahead production cost saving is M$ 3.33 ($4.88/MWh). In Case 2016 w/ gas price @ $2.36/MMBtu and new IFRO, the day-ahead production cost saving is M$ 3.31 ($2.22/MWh) Real-time opportunity cost savings (RT OCS) for both PFR and NS/CR are calculated based on the average RT OC on Brattle Slide 10.