Process engineering TAKT vs CYCLE.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

By Anastasia Lidya Maukar
Capacity Planning For Products and Services
The Principles Of Lean Repair Dr David J Horton Copyright© 2011 Beta Management Systems - All Rights Reserved.
1 Alain Prioul Flexibility / Adaptability. 2 Definitions Flexibility Ability to follow customer demand at different Takt Time Ability to quickly change.
UNBALANCED LOADS Bain AND Boon To Inventory Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
CAPACITY LOAD OUTPUT.
Supplier Development Kaizen Implementation Kit
Organization of Workstations
BSAD 102 Mike’s Bikes Business Simulation
Material Handling Conventional. Operations Process (Flow) Chart Flow diagram is a plan of work area, indicating the position of machines, flow of materials.
Standardized Processes and Procedures. Standardization Supports StabilityStandardization Supports Stability  NOT the same as “work standards”  Faster.
Lean Process Flow Project at Wells Fargo Financial Proplanner Webinar September 6, 2007 Aaron Bruner.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Product Development. Major Topics The product portfolio of a company concretizes its mission A description of the product selection and development process.
Takt Time Training Pack.
Lean Production - Objectives
LEAN MANUFACTURING IMPLEMENTATION -- Lean Supply Chain
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
Chapter 4 Process Design.
Back in Circulation Again 2012 Increased Efficiency through the Study of Moving Materials.
Problem Statement Proposed Solution Key Considerations Laboratory Reports Entire Solution Phase I Solution Conclusion Design Team Jonathan Correia, Sean.
1 Slides used in class may be different from slides in student pack Chapter 17 Inventory Control  Inventory System Defined  Inventory Costs  Independent.
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
Airbus Production System
Planning in production systems Slovak University of Technology Faculty of Material Science and Technology in Trnava.
 assign material, labor, and manufacturing overhead costs to products and to provide a mechanism for computing unit product costs.  Same accounts and.
Module 17 Product Costing.
Process Analysis and Design Improvement of a Heavy Duty Electric Actuator at Governors America By: Anthony Mone And Michael Butt Advisor: Dr. Abdul Kamal.
Manufacturing Line Analysis Prepared by: Veronica MacInnis, Leah Hutchison, & Carina Zorrilla.
Lean Manufacturing Line Demonstration This short PowerPoint presentation is designed to give the reader an example of how a Lean/Pull system operates.
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
ISO ENVIRONMENTAL MANAGEMENT PROGRAMS.
1 Session 18 Implementation of TOC at Tosoh, SMD Laura Blum Production and Inventory Control Manager.
Planning in production systems PPS systems – production planning and control systems Slovak University of Technology Faculty of Material Science and Technology.
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Capacity Plan
Manufacturing/Office Cells
1 Mix Model for Executives FMS 200 Series FBP-FMS288A.
PRODUCTION PLANNING AND CONTROL (PPC). PLANNING CONTROL CONTROL PRODUCTION.
AXUG Partner Showcase – Introducing Preactor
Job-Order Costing: Cost Flows and External Reporting
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Process Two Manufacturing Solutions
Tour - session 8 Detailed Scheduling
Process engineering Standard times.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Analytical Tools for Process Analysis and Improvement
Process Design and Analysis
4.3 Increasing efficiency and productivity
Inventory Control: Part 1- Fundamentals
Developing Information Systems
Pricing your Products to be Profitable
M6205 SYSTEM SIMULATION AND MODELLING TERM PROJECT
Welcome to my presentation
Performance Measures, Capacity Planning & Scheduling
4.2 Analysing operational performance
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Productivity Improvement.
Manufacturing Process
Introduction to Scheduling Chapter 1
Work Measurement and Lean Application
Capacity Planning For Products and Services
Manufacturing Process
Production and Operations Management
Capacity Planning For Products and Services
Presentation transcript:

Process engineering TAKT vs CYCLE

Objectives Satisfy the customer schedules Maintain company reputation Improve productivity Apply lean initiatives Reduce manufacturing costs Improve house keeping Meet OHS requirements Reduce WIP Better utilisation of machinery Improved QA

Balancing the sequence Balancing the manufacturing sequence allows production to flow smoothly and improves manufacturing performance. Balancing the manufacturing sequence reduces: the amount of work in progress (WIP) storage of parts time wasting QA issues OHS.

Sequencing Based on the TAKT time calculations we need to produce 60 cars per hour. To achieve a specified rate of production the sequencing for machine and man time needs to be balanced across all process steps.

Process flow Units per hour 60 45 90 40 The flow of work from one machine operation to the next affects production quantities. In this example: OP10 is producing 15 units more per hour OP20 is not producing at the same rate as OP10 Note there is no inspection requirement on a roughing operation.

Capacity The capacity of: OP10 is 60 units per hour 45 The capacity of: OP10 is 60 units per hour OP20 is 45 units per hour Total production is reduced to 45 units per hour. Work in progress is increasing by 15 units per hour. 1 day = 120 units WIP 5 days = 600 units WIP xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx xxxxx

Assessing the process Units per hour 60 45 Balance is achieved by identifying and assessing the sequence of process steps, to meet the demand of the TAKT time. Improvements to the sequence can include: modifying process steps moving process steps redistributing process steps to other machines.

Assessing change to process Changes and modifications need to be assessed to identify how the manufacturing process may be affected. Cost, availability or time can effect the final solution. For example: A fixtures ability to take extra load Operator time PFMEA/QA risk through changes Costs.

Process sequence Units per hour 60 45 90 One solution for balancing this manufacturing sequence is to move some sequence steps from OP20 to OP30.

Modifying the sequence Units per hour 60 60 60 One step is moved from OP20 to OP30 = 20 seconds. Now each of the three operations are balanced to operate in 60 second cycles.

Process cycle times The capacity of: Units per hour 60 60 60 40 The capacity of: OP10 is 60 units per hour – cycle time 60 secs OP20 is 60 units per hour – cycle time 60 secs OP30 is 60 units per hour – cycle time 60 secs OP40 is 40 units per hour – cycle time 90 secs

Introduce new OP Units per hour 60 60 60 60 60 30 seconds of the sequence is moved from OP40 to the newly created OP50. A manual machine will incur time penalties ie. 50 seconds. OP50 is placed beside OP10 operator due to available operator idle time.

Summary TAKT time calculations to meet customer needs. Identify equipment that cannot achieve TAKT time. Identify the equipment sequence and activity. Relocate equipment to meet TAKT time. Use PFMEA to assess risk. Introduced new OP. Outcome achieved by balancing line. Manufacturing supports customer needs.