MISSION PRE-ENVIRONMENTAL REVIEW

Slides:



Advertisements
Similar presentations
Module Metrology Peter Sutcliffe. Peter Sutcliffe – Module Metrology Wenzel CMM Module Metrology carried out on Wenzel CMM with module jig aligned along.
Advertisements

Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points.
MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
Integrating a Short Range Laser Probe with a 6-DOF Vertical Robot Arm and a Rotary Table Theodor Borangiu Anamaria Dogar
X marks the spot!.
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Page 1 Christian Grefe, DESY FLC Status of PCMAG fieldmapping analysis Annual EUDET Meeting Paris, Status of PCMAG fieldmapping analysis Christian.
C2: Coordinate Geometry of the Circle Learning Objective: To be able to find and use the equation of a circle.
Basic Principles of Coordinate Measuring machines
LASER AND ADVANCES IN METROLOGY
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
PXL Mechanical Hinge rework in aluminum and carriage redesign Kinematic rework and analysis Insertion test - detailing and fabrication instructions Spatial.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
Factors Affecting EFW Boom Mounting Accuracy Paul Turin UCB/SSL.
MPSRAlignments - 1 UCB, Oct 26, 2006 THEMIS PROBE MISSION PRE-SHIP REVIEW Alignments Paul Turin LME University of California - Berkeley.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
January 25, 2005GRETINA 2004 Review1 GRETINA 2004 Annual Review Steve Virostek Lawrence Berkeley National Lab Mechanical System.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
Alignment Tools Used To Locate A Wire And A Laser Beam In The VISA Undulator Project Wire Finder CALIBRATION A special fixture was constructed to calibrate.
THEMIS MISSION PDRMAG BOOM- 1 UCB, November, 2003 Magnetometer Booms (MAGS) Mission Preliminary Design Review Hari Dharan Space Sciences Laboratory University.
Eberhard Pulz Karl-Heinz Jäckel, Oliver Bronkalla.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
PACMAN Error Inventory OUTLINE The PACMAN task The Inventory of contributors The Evaluation Method Critical Areas Outcome 08/10/2015 by Iordan Doytchinov.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
X-Y Geometry Check Solid steel fixture used as template Saddles in fixture are precisely machined to within +/-.005 in one setup in a large CNC machine.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
PIXEL ladder alignment Hidemitsu ASANO. Photo analysis & survey beam data (with zero magnetic field) ① SVX standalone tracking Global Tracking Strategy.
MECH 538 Application of Drawing Requirements Tools Fixtures and Gaging.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
THEMIS INSTRUMENT SUITE
Lab 3 - Centering.
3D Transformation.
Spacecraft Interface and I&T
THEMIS MISSION PRE-SHIP REVIEW
Stages for the SSW translation system for PACMAN
MISSION PRE-ENVIRONMENTAL REVIEW MASS PROPERTIES & SPIN BALANCE
Operational Description
THEMIS INSTRUMENT TRAINING
ACS UC Berkeley Space Sciences Laboratory
LCLS Undulator Fiducialization
Towards a common mechanical interface
Graphing Ordered Pairs
THEMIS MISSION PRE-SHIP REVIEW
University of California, Berkeley
Geometric Dimensioning and Tolerancing
TKR and LAT Survey and Alignment Planning
Partial relation.
Nuclear Magnetic Resonance
11.3 Coordinate Plane Math 1.
The Coordinate Plane #39.
The pursuit of perfection
Presentation transcript:

MISSION PRE-ENVIRONMENTAL REVIEW THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Alignments Paul Turin LME University of California - Berkeley

Alignment Overview There are three alignments tasks: Alignment Verifications for MSSS and Thrusters, comparing to SAI measurements Alignment Measurements of Magnetometers to determine offsets from probe geometric Z axis and clocking in XY plane Align probes on Miller table for spin balance Measurements will be performed by Bob Connors of LBNL using LBNL FARO Gold CMM arm (0.003” accuracy) Currently working on measurements for F2 Learn how to do it, work out the bugs in process Verify no changes to probe alignments do to environments F1, F3-5 alignments will be verified and measured during “round-robin” activities at JPL (post vibe)

SAI Supplied Alignment Data .sat file output from FARO arm: Contains: Primary coord sys (C1) Secondary coord sys (C4) AXB Axis MSSS Fiducial Tree Thruster axes Files for all five probes delivered to UCB

Alignment Verification for MSSS, Thrusters Use FARO arm to pick up probe C4 coordinate system Measure thrusters and MSSS using fixtures Calculate angles between SAI and UCB data Determine if still within tolerances (SAI-PLAN-643) Requirements: MSSS 1deg Thrusters 0.5 deg

Alignment Measurements for Magnetometers No MRD alignment requirement, desire is: Aligned within a few deg, knowledge within 1 deg Measurements: Determine end-to-end magnetometer offsets from geometric axes, and total uncertainty + Final C4 to Fiducial Alignment Measurements + UCB Mag to Fiducial Alignment Offsets SAI Probe C4 Coordinate System Total Alignment Offsets + Final Alignment Errors + UCB Mag Mount to Fiducial Errors SAI Probe C4 coordinate System Errors Total Errors

Magnetometer Theoretical Angles

Mag Boom Fiducial Angles between mag mount and fiducial are measured on deployed boom, fiducial is measured from probe C4 coordinate system

Mag-to-Boom Alignment Data Mag Mount to Fiducial Alignment Offsets: Deployment Repeatability:

Mag Boom Total Measurement Error Mag Boom Measurement Errors Probe Measurement Errors Probe Geometric Axis to Magnetic Axes Knowledge

Spin Balance Alignment on Miller Table Determine alignment of probe geometric Z axis to Miller table spin axis Determine alignment of probe XY clocking to Miller table azimuth zero Probe is located during installation to the table by boss that aligns AXB tube to table spin axis AXB tube is not guaranteed to be perpendicular to sep system bottom C4 tooling balls are used to determine AXB axis tilt and probe clocking on table