What is Stave Carrier Frame Required to Do?

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

US Bracket Support for Stave D. Lynn (BNL), LBNL Mechanical Meeting, Sep
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
1 David Santoyo Petal meeting: 24 October 2014 Petal vs Services: design concerns.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Progress on staves – mechanical & thermal. Core and materials.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
1st Nov 2001 Nigel Hessey SCT Endcap Structures FDR1 Endcap Requirements Brief overview of SCT Endcap Requirements layout, X0, thermal, positioning, stability.
March OsC Report and Restructuring WP4. OsC Report 4.1 Tapes Bus tape designs have been completed for modules with 130nm ASICs which incorporate options.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tilt angles reloaded, and status of some other things.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
Frames and insertion Note: Stavelet holder (working) document available on wiki:
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
US stavelet update 12th April PPB2s on serial power side 12 Apr SAMTEC connector (floating) Bond pad (connected to EoS through WB + bus tape.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
15th January 2014 WP4 Meeting Oxford1 EoS PCB Mike Dawson University of Oxford.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
Graham Beck (QMUL) LBNL Sept Berlin, March 2013: FEA of Side-Mounted Card + Straight Cooling Pipe (not wiggled through SMC region): For adequate.
Straw man layout for ATLAS ID for SLHC
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Planar distortions for SCT Barrel Modules
Are there better ways to build a stave?
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
Micro Vertex Detector of PANDA Strip Detector
Mechanics: (Tim).
WP9 ITS Mechanics and Cooling
Graham Beck, QMUL, WP4 RAL 2 May 2013
IFR detector mechanics
Hybrid Mechanical/Thermal Design ideas
Station and Module Support Frames
Limited Streamer Tube Project Summary
Presentation transcript:

What is Stave Carrier Frame Required to Do? An individual stave will be a valuable object: 24 modules/~£30k => its progress through to completion as part of the barrel detector needs careful planning. Design of Carrier Frame depends on the details. So far have first prototypes of frames for Stavelet. QM UL WP4 Jan 2012 QMUL Graham Beck

Stavelet Carrier Frame (lid + base removed) …with top half-rail removed to show the (previous design) mounts: Ally prototype was precisely machined: not suitable for production quantities due to complex profile of mounting rail. Production version (1 per stave) could be e.g. extruded ally, CFRP… => need final design before tooling/manufacture. Module Mounting Frame (stavelet + carrier in position) Prototype assembled from several lengths - OK for full length stave (only a few needed) WP4 Jan 2012 QMUL Graham Beck

Carrier Frame Functionality Protect Stave from Bare “Plank” through to Insertion on the barrel. Must be compatible with assembly procedures and tests required. Assembly procedures include: Module Mounting (in hand) Addition of support fixtures after module mounting? Insertion onto Barrel (should also enable Removal) Test Schedule will need to be defined. Important: Assuming QA of modules prior to mounting, what tests are needed of completed staves (either individually or sampled)? Metrology: What is required at STAVE level? (Care how constrained mechanically!) RichardN re statement in Barrel Module paper: “.. 70microns is a ‘global’ constraint over the width of the object for unknown out of plane.  Local deformations could be larger. … across a module one would not want an unknown bow which resulted in one edge being further out in R than was assumed by an amount  = resolution/sin(tilt angle +small correction). ….. I think we will want to survey the shape of modules on the stave assuming that this shape is not much affected by the overall bow of the stave which can be added on separately. If the ‘relative to stave’ bow is small (<100microns or so) it will not add anything to the physics.” WP4 Jan 2012 QMUL Graham Beck

Thermal cycling ? (what is relevant QA? Metrology . . .?). Basic Stave test: cooling and power: test connectivity, temperatures, basic performance Thermal cycling ? (what is relevant QA? Metrology . . .?). Electrical Performance (“SCTDAQ”): IV –Readout - Noise - Stability - Warm/Cold => Frame (with lids in place) should be light-tight, nitrogen flushable (gas connections, electrical connections) … Irradiation ? Requirements will evolve - we must anticipate what might be needed before we can design a frame for mass production! How many attempts at frame extrusion (e.g.) can we afford? Maybe one (IanW). Should cost! For near future / next frames: Consider adapters between the stave support arms and an extrusion with a simple profile. RN: At least until trigger layer resolved. (Fred’s idea?) Hold stave within frame by retractable pins, independently of support arms. WP4 Jan 2012 QMUL Graham Beck

Other “Muddy” Issues Frame/Support Fixtures compatible with wire bonder ? Stave Shape: EOS vs SMC, Size/Position of DCDC converters… Transport Crate (no work on this yet) WP4 Jan 2012 QMUL Graham Beck