Cellular Manufacturing Group Technology

Slides:



Advertisements
Similar presentations
Clustering.
Advertisements

IENG 471 Facilities Planning
Transportation Problem (TP) and Assignment Problem (AP)
Introduction Fixed-position layout Job shop production I
Process Selection and Facility Layout
Facility Design-Week6 Group Technology and Facility Layout
1 EE5900 Advanced Embedded System For Smart Infrastructure Static Scheduling.
Label Placement and graph drawing Imo Lieberwerth.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
VLSI Layout Algorithms CSE 6404 A 46 B 65 C 11 D 56 E 23 F 8 H 37 G 19 I 12J 14 K 27 X=(AB*CD)+ (A+D)+(A(B+C)) Y = (A(B+C)+AC+ D+A(BC+D)) Dr. Md. Saidur.
3 Group Technology / Cellular Manufacturing
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Computer Integrated Manufacturing CIM
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Group Technology and Facility Layout
Operations Management
Process (Job Shop) Layouts
© The McGraw-Hill Companies, Inc., Chapter 3 The Greedy Method.
Graph Partitioning Problem Kernighan and Lin Algorithm
Linear Programming Data Structures and Algorithms A.G. Malamos References: Algorithms, 2006, S. Dasgupta, C. H. Papadimitriou, and U. V. Vazirani Introduction.
Cellular Manufacturing
Sequencing Mixed Models & Unpaced Lines Active Learning Module 4 Dr. César O. Malavé Texas A&M University.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 12 MACHINE SETUP AND OPERATION SEQUENCING E. Gutierrez-Miravete Spring 2001.
CP Summer School Modelling for Constraint Programming Barbara Smith 2. Implied Constraints, Optimization, Dominance Rules.
1 Short Term Scheduling. 2  Planning horizon is short  Multiple unique jobs (tasks) with varying processing times and due dates  Multiple unique jobs.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 8 CELLULAR MANUFACTURING GROUP TECHNOLOGY E. Gutierrez-Miravete Spring 2001.
Layout and Design Kapitel 4 / 1 (c) Prof. Richard F. Hartl Flow shop production Object-oriented Assignment is derived from the item´s work plans. Uniform.
Operational Research & ManagementOperations Scheduling Economic Lot Scheduling 1.Summary Machine Scheduling 2.ELSP (one item, multiple items) 3.Arbitrary.
Slide 0 of 96 Manufacturing Facility Layout. Slide 1 of 96 Basic Layout Forms Process Product Cellular Fixed position Hybrid.
CELLULAR MANUFACTURING. Definition Objectives of Cellular Manufacturing  To reduce WIP inventory  To shorten manufacturing lead times  To simplify.
Chap 4 - Facility Layout: Manufacturing and Services.
Layout and Design Kapitel 4 / 1 (c) Prof. Richard F. Hartl Example – Rule 5 j tjtj PV j (5) Cycle.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Manufacturing Processes
NAME THAT ALGORITHM #2 HERE ARE SOME PROBLEMS. SOLVE THEM. GL HF.
The NP class. NP-completeness
Haim Kaplan and Uri Zwick
FACILITY LAYOUT Facility layout means:
1.3 Modeling with exponentially many constr.
OST: Chapter 3 (Part 1) Tactical planning: Layout
Chapter 2 – Netlist and System Partitioning
Hierarchical and Ensemble Clustering
Organizing Production Equipment
Haim Kaplan and Uri Zwick
Facilities Planning and Design Course code:
Hierarchical and Ensemble Clustering
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
Dynamic Programming Dynamic Programming 1/15/ :41 PM
Applied Combinatorics, 4th Ed. Alan Tucker
MANUFACTURING SYSTEMS
Dynamic Programming Dynamic Programming 1/18/ :45 AM
Merge Sort 1/18/ :45 AM Dynamic Programming Dynamic Programming.
Dynamic Programming Merge Sort 1/18/ :45 AM Spring 2007
Merge Sort 2/22/ :33 AM Dynamic Programming Dynamic Programming.
A Fundamental Bi-partition Algorithm of Kernighan-Lin
Flow shop production Object-oriented
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Departmental Planning
Algorithms (2IL15) – Lecture 7
MACHINE GROUPING IN CELLULAR MANUFACTURING With Reduction Of Material Handling As the Objective 19/04/2013 lec # 25 & 26.
Topic 15 Job Shop Scheduling.
Chapter 6 Network Flow Models.
Facilities Planning and Design Course code:
11.5 Implicit Partitioning/Packing Problems
Merge Sort 4/28/ :13 AM Dynamic Programming Dynamic Programming.
Dynamic Programming Merge Sort 5/23/2019 6:18 PM Spring 2008
Chapter 1. Formulations.
“Cellular Manufacturing”
Presentation transcript:

Cellular Manufacturing Group Technology OST: Chapter 5 Cellular Manufacturing Group Technology (c) Prof. Richard F. Hartl OST

Introduction Review of the introductory example Production and assembly of 4 parts (A, B, C, D) A: saw -> turn -> mill -> drill B: saw -> mill -> drill -> paint C: grind -> mill -> drill -> paint D: weld -> grind -> turn -> drill (c) Prof. Richard F. Hartl OST

Group Technology (GT) Observation already in 1920ies: product-oriented departments to manufacture standardized products in machine companies lead to reduced transportation Can be considered the start of Group Technology (GT): Parts with similar features are manufactured together with standardized processes  small "focused factories" are created as independent operating units within large facilities. More generally, GT can be considered a “theory of management” based on the principle "similar things should be done similarly“ "things" .. product design, process planning, fabrication, assembly, and production control (here); but also other activities, including administrative functions. (c) Prof. Richard F. Hartl OST

When to use GT? Pure item flow lines are possible, if volumes are very large. If volumes are very small, and parts are very different, a functional layout (job shop) is usually appropriate In the intermediate case of medium-variety, medium-volume environments, group configuration is most appropriate (c) Prof. Richard F. Hartl OST

Cellular Manufacturing Principle of GT: divide the manufacturing facility into small groups or cells of machines  cellular manufacturing Each cell is dedicated to a specified family of part types (or few “similar” families). Preferably, all parts are completed within one cell Typically, it consists of a small group of machines, tools, and handling equipment (c) Prof. Richard F. Hartl OST

Different Versions of GT The idea of GT can also be used to build larger groups, such as for instance, a department, possibly composed of several automated cells or several manned machines of various types. GT flow line (closest to flow shop) classical GT cell GT center (closest to job shop) (c) Prof. Richard F. Hartl OST

GT flow line All parts assigned to a group follow the same machine sequence and require relatively proportional time requirements on each machine. Automated transfer mechanisms may be possible.  mixed-model assembly line (Chapter 4) fräsen (aus)bohren drehen schleifen bohren (Askin & Standridge, 1993, p. 167). (c) Prof. Richard F. Hartl OST

classical GT cell Allows parts to move from any machine to any other machine. Flow is not unidirectional. Since machines are located in close proximity  short and fast transfer is possible. (Askin & Standridge, 1993, p. 167). (c) Prof. Richard F. Hartl OST

GT center Machines located as in a process (job shops) But each machine is dedicated to producing only certain Part families  only the tooling and control advantages of GT; increased material handling is necessary When large machines have already been located and cannot be moved, or When product mix and part families are dynamic  would require frequent relayout of GT cell (Askin & Standridge, 1993, p. 167). (c) Prof. Richard F. Hartl OST

Cellular manufacturing Group technology Parts with similar features are manufactured Small "focused factories" are created as independent operating units within large facilities. Divide the manufacturing facility into small groups Each cell is dedicated to a specified family or set of part types A cell is a small group of machines, tools, and handling equipment Since machines are located in close proximity  short and fast transfer is possible (c) Prof. Richard F. Hartl OST

Cellular manufacturing Often u-shaped for short transport Often typical material flow (c) Prof. Richard F. Hartl OST

Cellular manufacturing Example with 3 workers Also u-shaped (c) Prof. Richard F. Hartl OST

Cellular manufacturing Advantages: Short transportation and handling (usually within cell) Short setup times because often same tools and fixtures can be used (products are similar) High flexibility (quick reaction on changes) Clear arrangement, few tools/machines  easy to control High motivation and satisfaction of workers (identification with “their" products) Small lot sizes possible Short flow times (c) Prof. Richard F. Hartl OST

Cellular manufacturing How to build groups? Similiar parts (similiar process flow/machine usage, same materials,…) are grouped Visual inspection Classification and coding based on design and production data (time consuming, no universally applicable system is available) Production Flow Anlaysis (PFA), i.e. mathematical models (c) Prof. Richard F. Hartl OST

Production Flow Analysis Many clustering methods have been developed Can be classified into: Part family grouping: Form part families and then group machines into cells Machine grouping: Form machine cells based upon similarities in part routing and then allocate parts to cells Machine-part grouping: Form part families and machine cells simultaneously (c) Prof. Richard F. Hartl OST

Machine-part grouping Construct matrix of machine usage by parts sort rows (machines) and columns (parts) so that a block-diagonal shape is obtained (c) Prof. Richard F. Hartl OST

Machine-part grouping How can this sorting can be done systematically? Various heuristic and exact methods have been developed. The simplest one is binary ordering, also known as “rank order clustering” or “King’s algorithm“ (c) Prof. Richard F. Hartl OST

Binary Ordering Example: 5 machines; 6 parts: Interpret rows and columns as binary numbers Sort rows w.r.t. decreasing binary numbers Sort columns w.r.t. decreasing binary numbers part machine 1 2 3 4 5 6 A - B C D E (c) Prof. Richard F. Hartl OST 18

Binary Ordering Sort rows w.r.t. decreasing binary numbers New ordering of machines: B – D – C – A - E part value machine 1 2 3 4 5 6   A - B C D E 0101002 = 22 + 24 = 20 20 + 21 + 23 + 25 = 43 20 + 22 + 23 + 24 = 29 20 + 21 + 25 = 35 21 + 22 = 6 25 32 24 16 23 8 22 4 21 2 20 1 (c) Prof. Richard F. Hartl OST

Binary Ordering Sort columns w.r.t. decreasing binary numbers part   machine 1 2 3 4 5 6 value B - 43 D 35 C 29 A 20 E 24 = 16 23 = 8 New ordering of parts: 6-5-1-3-4-2 22 = 4 21 = 2 20 = 1 20+21+22=7 23 + 24 = 24 21 + 22 = 6 22 + 24 = 20 20+23+24=25 22+23+24=28 (c) Prof. Richard F. Hartl OST

Result of Binary Ordering No complete block-diagonal structure Remaining items: 6, 5, and 3 produced in both cells Or machines B, C, and E have to be duplicated part machine 6 5 1 3 4 2 B - D C A E value 28 25 24 20 7 2 groups: Group 1: parts {6, 5, 1 }, machines {B, D} Group 2: parts { 3, 4, 2}, machines {C, A, E} Parts 1, 4, and 2 can be produced in one cell (c) Prof. Richard F. Hartl OST

Repeated Binary Ordering Binary Ordering is a simple heuristic  no guarantee that „optimal“ ordering is obtained Sometimes a better better block-diagonal structure is obtained by repeatingthe Binary Ordering until there is no change anymore (c) Prof. Richard F. Hartl OST

Example Binary Ordering (contd.) part   machine 6 5 1 3 4 2 value B - 60 D 56 C 39 A E 18 28 25 24 20 7  6 Example Binary Ordering (contd.) After sorting of rows and columns: part   machine 6 5 1 3 4 2 value B - 60 D 56 C 39 E 18 A 28 26 24 20 7  5 No change of groups in this example (c) Prof. Richard F. Hartl OST 23

Single-Pass Heuristic Considering capacities (Askin and Strandridge): All parts must be processed in one cell (machines must be duplicated, if off-diagonal elements in matrix) All machines have capacities (normalized to be 1) Constraints on number of identical machines in a group Constraints on total number of machines in a group (c) Prof. Richard F. Hartl OST

Single-Pass Heuristic - Example 7 parts, 6 machines Given matrix of processing times (incl. set up times) for typical lot size of parts on machines Entries in matrix not just 0/1 for used/not used) All times as percentage of total machine capacity Maximal number of machines per cell: here at most 4 machines in a group Not more than one machine of each type in a group (c) Prof. Richard F. Hartl OST

Single-Pass Heuristic part   machine 1 2 3 4 5 6 7 sum min. # machines A 0.3 - 0.6 0.9 B 0.1 0.7 C 0.4 0.5 1.2  D 0.2 1.4  E F  1.1 1 1 2 2 1 2  = 9 machines (c) Prof. Richard F. Hartl OST

Single-Pass Heuristic At least 9 machines are needed Not more than 4 machines in a group  at least 9/4 = 2,25 groups, i.e. at least 3 groups Step 1: acquire block diagonal structure e.g. using binary sorting Step 2: build groups (c) Prof. Richard F. Hartl OST

Single-Pass Heuristic Step 1: For binary sorting treat all entries as 1s. Result: part machine 1 5 7 3 4 6 2 D 0.2 0.3 0.5 0.4 - C A 0.6 F B 0.1 E (c) Prof. Richard F. Hartl OST

Single-Pass Heuristic Step 2: Assign parts to groups (in sorting order) Necessary machines are also included in group Add parts to group until either the capacity of some machine would be exceeded, or the maximum number of machines would be exceeded (c) Prof. Richard F. Hartl OST

Single-Pass Heuristic table Iteration part chosen group assigned machines remaining capacity 1 2 5 3 7 4 6 1 D, C, A D (0,8), C (0,6), A (0,7) 1 D, C, A D (0,5), C (0,6), A (0,1) 2 D, F, B D (0,5), F (0,8), B (0,9) 2 D, F, B D (0,1), F (0,5), B (0,9) D (0,1), F (0,1), B (0,6), C (0,5) 2 D, F, B, C 3 C, E C (0,7), E (0,5) C (0,7), E (0,1), F (0,8), B (0,7) 3 C, E, F, B (c) Prof. Richard F. Hartl OST

Single-Pass Heuristic Machines used: One machine each of types: A, E Two machines of types: B, D, F Three machines of type: C Single-pass heuristic of Askin und Standridge is a simple heuristic  not necessarily optimal solution (min possible number of machines) Compare result with theoretical min number of machines (c) Prof. Richard F. Hartl OST

Single-Pass Heuristic Maybe reduction possible?!   part machine 1 2 3 4 5 6 7 sum min. # heuristic A 0.3 - 0.6 0.9 B 0.1 0.7 C 0.4 0.5 1.2 D 0.2 1.4 E F 1.1 (c) Prof. Richard F. Hartl OST 32

BIP Model Minimize total (or weighted) number of machines used when the number of groups is given Previous example: At least 9 machines necessary Every group has at most M = 4 machines  at least 3 groups (try 3) (c) Prof. Richard F. Hartl OST

BIP Model ajk ... capacity of machine k needed for part j i  I ... groups (cells) j  J ... parts k  K ... machines M ... maximum number of machines per group (c) Prof. Richard F. Hartl OST

BIP Model 1, if part j is assigned to group i 0, otherwise = 1, if machine of type k is assigned to group i = = (c) Prof. Richard F. Hartl OST

BIP Model objective: constraints: each part must be assigned to one group respect capacity of machine k in group i not more than M machines in group i binary variables (c) Prof. Richard F. Hartl OST

Solution group parts machines remaining capacity 1 2, 4, 6 B, C, E, F 1, 5 A, C, D A (0.1), C (0.6), D (0.5) 3 3, 7 B, D, F B (0.9), D (0.1), F (0.5) Optimal solution with 10 machines Theoretical minimum number was 9 machines (not reached because of constraints) Single pass heuristic used 11 machines (c) Prof. Richard F. Hartl OST

Similarity Coefficients Also a clustering method (machine grouping) Define ni ... Number of parts visiting machine i nij ... Number of parts visiting machines i and j Similarity coefficient between machines i and j Proportion of parts visting machine i that also visit machine j (c) Prof. Richard F. Hartl OST 38

Similarity Coefficients Hierarchical Clustering Heuristic: Calculate Similarity Coefficients (SC) for all combinations of machines Group that combination leading to the highest SC. Stopping criteria: e.g. SC have to reach a given lower bound, only machines (no clusters) can be grouped, etc. Update SC: e.g. maximum of the SC of the machines that are to be combined (this is some kind of lower bound, determining the new coefficients exactly could lead to higher values. e.g. A: 0 1 1 B: 1 1 0 C: 1 0 1 (c) Prof. Richard F. Hartl OST 39

Similarity Coefficients Machine-Part-Matrix:   1 2 3 4 5 6 7 8 A B C D E F ni 3 3 4 4 2 2 (c) Prof. Richard F. Hartl OST 40

Similarity Coefficients Calculate SC: ni nij  A B C D E F - 3 1 0   1 3  1  -  2  3 3 4 4 2 2 sij  A B C D E F 1 0,333 0  0,75  0 0,5 1  Combine: A-B (c) Prof. Richard F. Hartl OST 41

Similarity Coefficients Bild Cluster und Update SC: sij  AB C D E F 1 0,333 0  0,75  0 0,5 1  sij  AB C D EF 1 0,333 0,75  0 0,5 0  sij  AB CD EF 1 0,333 0,5 0   0,5 (c) Prof. Richard F. Hartl OST 42

Similarity Coefficients Dendogram: Graphical illustrations of possible groupings per threshold (c) Prof. Richard F. Hartl OST 43

Graph Partitioning Machines with common parts should be in same group Graph illustrating common parts Group forming can be seen as special case of graph partitioning (c) Prof. Richard F. Hartl OST

Graph Partitioning Given a graph with nodes and edges, find a partitioning of the node set into a (given) number of disjoint subsets of approximately equal size, such that the total cost of edges that connect nodes of different subsets is minimized. NP-hard optomization problem Various methods have been developed Simple and well-known heuristic by Kernighan and Lin (c) Prof. Richard F. Hartl OST

Kernighan and Lin Input: A weighted graph G = (V, E) with Vertex set V. (|V| = 2n) Edge Set E. (|E| = e) Cost cAB for each edge (A, B) in E. Output: 2 subsets X & Y such that V = X  Y and X  Y = { } (i.e. partition) Each subset (group) has n vertices Total cost of edges “crossing” the partition is minimized. (c) Prof. Richard F. Hartl OST

Kernighan and Lin Complete enumeration (brute force) is not possible (np-hard): Try all possible bisections. Choose the best one. If there are 2n vertices  number of possibilities = (2n)! / (n!)2 = nO(n) For 4 vertices (A,B,C,D), 3 possibilities 1. X = {A, B} & Y = {C, D} 2. X = {A, C} & Y = {B, D} 3. X = {A, D} & Y = {B, C} For 100 vertices  5  1028 possibilities (c) Prof. Richard F. Hartl OST

Kernighan and Lin (c) Prof. Richard F. Hartl OST

Kernighan and Lin V(G) = { a, b, c, d, e, f }. Start with any partition of V(G) into X and Y, e.g., X = { a, c, e } Y = { b, d, f } The cut value is the sum of all edge costs between the 2 sets: cut-size = 3 + 1 + 2 + 4 + 6 = 16 Try to improve this partitioning using KL a c b d e f 3 1 2 4 6 (c) Prof. Richard F. Hartl OST

Kernighan and Lin For each node x  { a, b, c, d, e, f } compute the gain values of moving node x to the others set: Gx = Ex - Ix where Ex = cost of edges connecting node x with the other group (extra) Ix = cost of edges connecting node x within its own group (intra) This gives: Ga = Ea – Ia = 3 – 4 – 2= – 3 Gc = Ec – Ic = 1 + 2 + 4 – 4 – 3 =0 Ge = Ee – Ie = 6 – 2 – 3 = + 1 Gb = Eb – Ib = 3 + 1 –2 = + 2 Gd = Ed – Id = 2 – 2 – 1 = – 1 Gf = Ef – If = 4 + 6 – 1 = + 9 (c) Prof. Richard F. Hartl OST

Kernighan and Lin Cost saving when exchanging a and b is essentially Ga + Gb Calculate: gab = Ga + Gb - 2cab gab = Ga + Gb – 2wab = –3 + 2 – 23 = –7 gad = Ga + Gd – 2wad = –3 – 1 – 20 = –4 gaf = Ga + Gf – 2waf = –3 + 9 – 20 = +6 gcb = Gc + Gb – 2wcb = 0 + 2 – 21 = 0 gcd = Gc + Gd – 2wcd = 0 – 1 – 22 = –5 gcf = Gc + Gf – 2wcf = 0 + 9 – 24 = +1 geb = Ge + Gb – 2web = +1 + 2 – 20 = +1 ged = Ge + Gd – 2wed = +1 – 1 – 20 = 0 gef = Ge + Gf – 2wef = +1 + 9 – 26 = –2 (c) Prof. Richard F. Hartl OST

Kernighan and Lin Maximum gain by exchanging nodes a and f new cut-size = 16 – 6 = 10 X’ = { c, e } Y’ = { b, d } a c b d e f 3 1 2 4 6 (c) Prof. Richard F. Hartl OST

Kernighan and Lin gcb = Gc + Gb – 2wcb = gcd = Gc + Gd – 2wcd = G’c = Gc + 2cca – 2ccf = 0 + 2(4 – 4) = 0 G’e = Ge + 2cea – 2cef = 1 + 2(2 – 6) = –7 G’b = Gb + 2cbf – 2cba= 2 + 2(0 – 3) = –4 G’d = Gd + 2cdf – 2cda = –1 + 2(1 – 0) = 1 gcb = Gc + Gb – 2wcb = gcd = Gc + Gd – 2wcd = geb = Ge + Gb – 2web = ged = Ge + Gd – 2wed = new cut-size = 10 – (-3) = 13 X’ = { e } Y’ = { b } a d b c e f 3 1 2 4 6 (c) Prof. Richard F. Hartl OST

Kernighan and Lin G’e = Ge + 2ced – 2cec = G’b = Gb + 2cbd – 2cbc= geb = Ge + Gb – 2ceb = –1 – 2 – 20 = –3 Summary of the gains g1 = +6 g1 + g2 = +6 – 3 = +3 g1 + g2 + g3 = +6 – 3 – 3 = 0 Maximum gain is g1 = +6  Exchange only nodes a and f. End of 1 pass. This pass must be repeated until no changes are observed any more. (c) Prof. Richard F. Hartl OST

Kernighan and Lin Group formation with KL-Algorithm: See XLS (c) Prof. Richard F. Hartl OST

Grouping without binary ordering „Key machine“ See XLS (c) Prof. Richard F. Hartl OST