Procurement Status Miao Yu 11/19/2013.

Slides:



Advertisements
Similar presentations
HQ & LHQ End Parts Miao Yu Fermilab 08/27/12. HQ parts All the spacers are arriving within a week. 2.
Advertisements

LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
11 T Dipole for DS Status of CERN Activities M. Karppinen CERN TE-MSC On behalf of B. Auchmann, L. Bottura, B. Holzer, L. Oberli, L. Rossi, D. Smekens,
SQXF Practice Winding 1 L2 winding Miao Yu 01/23/2014.
LHQ Curing Mold Simulation Analysis Miao Yu Fermilab 08/02/2011.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
Raúl Morón Ballester TE-MSC-LMF
SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
Curing Mold Laminations Miao Yu 05/17/2012. QC on the cross-section 30/30 samples before production 16/500 samples during production 2.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
LHQ Curing Mold Miao Yu Fermilab 07/26/2011. HQ and LQ Curing HQ coil curing (LBNL) 2 LQ coil curing For HQ, the pressure of the mandrel cylinder is set.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
LHQ Coil 02 Winding and Curing Miao Yu 07/11/2013.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
LARP Collaboration Meeting Racetrack Coil Fabrication
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
Long Coil Manufacturing Plan and QA/QC by US HL-LHC-AUP Fred Nobrega / Jesse Schmalzle International Review of the MQXF Inner Triplet Quadrupoles for HL-LHC.
LHQ01 IL Curing Miao Yu 01/31/2013. LHQ IL Packing for Curing 2.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
1 LHC Hi-Lumi QXF Proposal for Coil Impregnation M. Anerella, J. Schmalzle, P. Kovach June 11, 2015.
Hardware Challenges and Limitations
BNL Progress with LR, application to LQ
QXF Coil Fabrication & Tooling Reaction / Impregnation
Coil Design and Fabrication
11 T Dipole Integration & Plans M. Karppinen
HQ Coil 19 Test Impregnation
MCBXFB Short Orbit Corrector Prototype: Status update
LARP Phase II Secondary Collimator RC1
11T Dipole – Single Aperture 2m Model
ERMC/RMM activities May 2017
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Mechanical stability and QXF coil winding
MQXF updates P. Ferracin October 9th, 2014.
QXF schedule and milestones
Presentation transcript:

Procurement Status Miao Yu 11/19/2013

Tooling-Winding The winding base tube was assembled The base block and mandrel laminations are under inspection The top winding tooling (winding spool support rail assembly) will be delivered by Dec. 16

Tooling-Curing Pusher bars are under inspection Curing spacers for L1 curing will be delivered by 12/11/2013

Curing Mold and Other Tooling Curing Mold is almost ready (heater wire connection) Rollover Tooling is under inspection.

Coil Parts Delivery of 6 sets of poles is 12/09/2013 Wedges 01/13/2014, deliver sample wedges for production approval (enough for 1 coil fabrication) 03/17/2014, deliver L1 wedges 04/07/2014, deliver L2 wedges 7 mil S2 glass tape, lead time 2~3 wks after vendor receiving the order. (now under paper work)

Reaction and Impregnation Tooling 3 sets of SQXF Reaction fixtures and Impregnation fixtures Most of the tooling will be delivered by 01/20/2014 All the form block and mandrel block are still under bidding process.

Current total M&S cost Winding and curing tooling: ~$116k Curing Mold: ~$55k 3 sets Reaction and impregnation tooling: ~ 230k Coil parts: ~40k