UoR Library Refurbishment – Early Works

Slides:



Advertisements
Similar presentations
Lesson 9 Design & Construction of Food Premises & Equipment
Advertisements

Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Hospital of the Future Construction Update as of Dec. 3, 2010.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
St. Joseph’s Building Project. Introduction This power point will let you know what is happening with the building project. It goes from the beginning.
Architectural Drawing
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
EDT 51-Floor Plan Design1 Weekend Cabin Retreat Project Basements Sacramento City College EDT 51 Kenneth Fitzpatrick, P.E.
RENOVATION & RESTORATION. New 3 rd Floor Prosecutors Office Existing Attic Space.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
Types of Concrete Foundations. Concrete Piers Foundation This type of foundation is mostly used on buildings with post & beam style construction. It is.
UNIVERSIDAD SIMÓN BOLÍVAR English for Architecture and Urban Planning II – ID2-125 January – March 2013 Teacher: Marianela Najul. Oriana Alvarez y Keitly.
John Osborne GS/SE March 2013
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
ASSIGNMENT Begin on page 197 “The Foundation”.
Service Delivery 2 Collapsed Structures. Aim To provide information that will assist students to deal with incidents involving collapsed structures safely.
The West London Free School Palingswick House Update.
We appreciate your co-operation during our works and any guidance you provide to help us minimise the impact we make on your lives will be gratefully received.
What is it? Where do I find it? How is it helpful? Equipment Safety in Schools website.
1 PUBLIC HEARING on HOUSING CONDITIONAL GRANT 2006/07 Presented by: M Nkoana-Mashabane The Honourable MEC of Local Government and Housing :Limpopo Province.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
A construction worker is a tradesman, laborer, or professional employed in the construction of the built environment and its infrastructure. A construction.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
Status of AMS02 Integration Area in Building 867 January 10, 2007.
Framing the House. Platform Framing Platform framing.
Project title : Typical design of community college Supervisors: 1-Prof.Dr.abdulmohsion W. Dhowain 2-Dr. Mohammad Jamal AL Shannag 3-Dr. Ibrahim Hamouda.
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
Access for All – The WMI Elevator Project What started as a dream several years ago is now becoming a reality. By the fall of 2010, the WMI will have a.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
September Information Technology Division BCP Presented By Roy Gregory IT Security Manager.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
GROUND ZERO. The condition of the old factory was bad and worse, chaos and unorganization a daily agenda. Old factory.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
 AKA Carpenters Square  Used for measuring right angles  Most common use is for stairs and rafters.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Fox Construction Group has over 20 years experience in providing infrastructure, support services and construction throughout.
About Morgan Sindall Morgan Sindall is a leading UK construction and regeneration group operating through five divisions of construction and infrastructure,
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
Substructure Groundworks - Hazards
Temporary Works – P8 Project Practice.
UC Community Meeting 11 April 2017.
San Luis Potosi – New plant April 24th 2015
Capital Improvements Presentation
Objective 6.02 part 1: Recognize components of construction
Pre-Contract Cost Control
CONCRETE FORMWORK Formwork.
Minuteman Vocational Technical Regional High School Progress
Framing the House                                                                                                                   
Ramar-Hall Addition: 2017.
Building Construction I Sofia Sebastian 1
Role of FEMA EHP During Response Activities
Project Name – ID # 7/1/2009 Current Project Status Project Issues
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
New White Lake Township Library
Where …? Unit 2 Open Day.
Minuteman Vocational Technical Regional High School Progress
Where’s the classroom? It’s on the second floor. 2A : Unit 1.
How Excavation Companies Help You In Construction Projects In Ooltewah, TN.
Presentation transcript:

UoR Library Refurbishment – Early Works 3 week rolling look ahead from 29/08/16 Basement Week 3 W/C 12/9/16 Wayler beam Install RMD Prop Install Permit to Load – L&C Week 1 W/C 29/08/16 Waterproofhoarding Week 2 W/C 5/9/16 Commence installation of Propping Paint hoarding

UoR Library Refurbishment – Early Works 3 week rolling look ahead from 29/08/16 Ground Floor Week 3 W/C 12/09/16 Soft strip ongoing Week 1 W/C 29/08/16 Soft Strip Commence Week 2 W/C 5/9/16 Install Doors Commence installation of propping Week 1 W/C 29/08/16 Complete Hoarding to Core 2 Complete Steelwork Decorate Hoarding Asbestos Removal Install Door Frames Week 3 W/C 12/09/16 Complete propping

UoR Library Refurbishment – Early Works 3 week rolling look ahead from 29/08/16 First Floor Week 2 WC 5/9/16 Complete Hoardings Commence installation of propping. Install Doors Week 1 W/C 29/08/16 Complete Hoarding Decorate Hoarding Install Door Frames Week 3 W/C 12/09/16 Weatherproof hoarding. Complete propping

UoR Library Refurbishment – Early Works 3 week rolling look ahead from 29/08/16 Second Floor Week 1 W/C 29/08/16 Complete hoarding including doors Commence propping Week 3 WC 12/9/16 Propping Complete Week 3 W/C 12/09/16 Decorate hoarding Week 1 W/C 29/08/16 Complete hoarding Remove furniture Week 2 WC 5/9/16 Complete decorating hoarding Hand area back Week 3 W/C 12/9/16 Hoarding ongoing Temporary Power and Data

UoR Library Refurbishment – Early Works 3 week rolling look ahead from 29/08/16 Third Floor Week 2 WC 5/9/16 Move Furniture Week 2 WC5/9/16 Complete decorating hoarding Hand area back Install propping Week 3 W/C 12/09/16 Complete propping Commecne soft strip Week 1 W/C 29/08/16 Complete hoarding

UoR Library Refurbishment – Early Works 3 week rolling look ahead from 29/08/16 Fourth Floor Week 1 W/C 29/8/16 Hoarding to be built Week 2 W/C 5/9/16 Commence hoarding Week 3 W/C 12/09/16 Complete hoarding Install propping Week 1 W/C 29/08/16 Hoarding installation complete

UoR Library Refurbishment – Early Works 3 week rolling look ahead from 29/08/16 Fifth Floor Week 1 W/C 29/08/16 Commence hoarding Week 3 W/C 12/09/16 decorate hoarding Install propping

UoR Library Refurbishment – Early Works 3 week rolling look ahead from 29/08/16 Roof / Plant Level No Works

UoR Library Refurbishment – Early Works 3 week rolling look ahead from 29/08/16 Cycle Shed Week 3 W/C 12/09/16 Slab and drainage On Hold Week 2 W/C 5/9/16 Install Hoarding Commence groundworks

UoR Library Refurbishment – Early Works 3 week rolling look ahead from 29/08/16 Site Establishment Week3 W/C 12/09/16 Cabin delivery Week 1 W/C 29/08/16 Trench for temporary services Week 1 and 2 W/C 29/08/16 and W/C 5/9/16 Foundations and drainage On Hold Week 1 W/C 29/08/16 Complete Bin Store Bin Store

UoR Library Refurbishment – Early Works 3 week rolling look ahead from 29/08/16 Emergency Contact Numbers Name Role Number Site Office TBA Prabh Solotera Senior Construction Manager 07964 248676 Dom Winterburn Logistics Manager 07540 883301 Kinga Matanina Assistant Construction Manager 07966 996930 Richard Slade Project Manager 07500 668795 Alan O’Garro Senior Technical Services Manger 07577 231148 Graeme White Project Director 07730 490043