Transmission Workstream 6 January 2011

Slides:



Advertisements
Similar presentations
Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1.
Advertisements

Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
The calculation of the NTS Optional Commodity tariff (NTS Shorthaul) in the Enduring Exit Period Richard Hounslea/Debra Hawkin National Grid NTS, Gas Charging.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
EU Phase 3 Customer communications
Moffat - Capacity System Entry Point
Distribution workstream 29th January 2009
Transitional Exit Capacity Proposals -Update
Transmission Workstream February 2009
Proposer: Matthew Hatch Panel Date: 20/10/16
Entry Capacity Overrun price calculation
EU Implementation Programme
Exit Capacity User Commitment – Transmission Workstream update
Review of UNC Section Q “Emergencies”
Code Governance Review UNC Modification Proposals
Transmission Planning Code
Transmission Workstream 4th July 2007
SO Incentives from April 2010
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
Entry Capacity - update
Transparency Project GRI NW Region.
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
European Transparency Requirements
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Amendment to NEA & NExA Measurement Provisions Change Process
NTS Entry Charging Review Update
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
Mod 0452 (PARCA) – Further thoughts
Exit Capacity Substitution and Revision
The Necessary Criteria for a UNC Modification Proposal
Transmission Workgroup June 7th 2012
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Draft Capacity & Connection Plan
Update on Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Transmission Workgroup 6th March 2014
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Transmission Planning Code Review
QSEC auction timetable
Long Term Non Firm Capacity Update
MOD Deemed applications – User pays initial thoughts.
Interruptible to Firm – NTS Supply Point Transition
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
Richard Fairholme E.ON UK
Transmission Workstream 2nd December 2010
Gas Customer Forum DN Interruption Update - Introduction
Richard Fairholme Transmission Workstream 4th September 2008
Mark Freeman 29th January 2007
Reinstatement of NTS Interruption
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
Information Provision for Transitional Exit Capacity
Stefan Leedham Transmission Workstream 2nd November 2006
Commercial Arrangements For Gas Quality Service – Introduction
Incremental Entry Capacity Release Methodology Statement
Transmission Workstream, 1 Mar 07
Transmission Workstream 05 November 2009
Presentation transcript:

Transmission Workstream 6 January 2011 Commercial Interruptible Reverse Flow service at Moffat Interconnector. Transmission Workstream 6 January 2011 Transmission Work stream 2 December 2010

Commercial Interruptible Reverse Flow service at Moffat Interconnector. Why? “Enables additional transactions between Great Britain and Ireland, improves efficiency and benefits competition”

Progress to date Section 23 notice issued by Ofgem To include Moffat in the Licence as an Entry point (responses closed out on the 21st of December 2010) Facilitates the release of Interruptible Entry Capacity at Moffat for an Interruptible Commercial Reverse Flow service Mod proposal (0352) raised To ensure transparency and engage the industry Amends the existing Moffat CSEP Ancillary Agreement to a combined Exit and Entry Ancillary agreement allowing signatories to utilise the Entry and/or Exit services at Moffat Seeks consent from Users to certain amendments of Network Exit Provisions within the Connected System Agreement (CSA - the bilateral connection agreement in place between National Grid NTS and Gas Link) Final legal text can not be submitted until the amended CSA has been signed and agreed Which may be dependant on the consultation on the reverse flow service issued by the Irish Regulator (CER) on the 22nd of December 2010 National Grid NTS will not recommend sending the MOD to consultation until the amended CSA has been signed and agreed

Release of interruptible entry capacity at Moffat No physical reverse capability at Moffat. Interruptible NTS Entry Capacity will be made available. At day ahead stage through existing day ahead interruptible auction Released as Discretionary Interruptible NTS Entry Capacity (in accordance with TPD UNC B2.5.10 (b)