Demand Connection Code

Slides:



Advertisements
Similar presentations
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
Advertisements

Negotiations of Contracts Getting agreement on what was agreed.
1 CULTURAL SERVICES IN INTERNATIONAL TRADE: IMPLICATIONS FOR DEVELOPING COUNTRIES Trade Negotiations and Commercial Diplomacy UNCTAD.
Transfer Service Meeting, October 19, 2005 Bonneville Power Administration Long-Term Transfer Service (GTA and OATT) Customer Kick-Off Meeting Garry Thompson.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transmitted by the representative of JAPAN Toward Realization of the “Mutual Recognition of International Whole Vehicle Type Approval (IWVTA)” under the.
WHAT IS ANFASA? APACT is a product of several years of discussions between authors and publishers on what makes up a reasonable and fair contract.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Distributed Generation Registration June 30, 2008.
T&SC Modification Proposal: Clarification of Outturn Availability
Understanding Harmonic Limits per IEEE
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
CAP169 BSSG 12/03/09. 2 Today  Recap on developments to date  Discuss and agree Terms of Reference for the group  Begin to work through proposal, capturing:
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
DRAFT Slides for Discussion - Standards, Reports and Recommendations
GC0096 Electricity Storage Grid Code Requirements
Smart Grid Paul Bircham Commercial Strategy & Support Director.
GC0104 – Demand Connection Code (DCC)
Grid Code - Real-time data exchange with DNOs
Compliance with the RfG
Agenda TSOG 8th November
Loss of Mains Protection on DG Rectification Programme
GC0087 Frequency Response Provisions
Transposition of European Network Codes
Siemens Wind Turbine Weak Grid Option Modeling in PSSE WECC library Hongtao Ma, Siemens Wind Power Joergen Nielsen, Siemens Wind Power Good morning,
GC0102 – System Management & Compliance
EU Tariffs Code Update Based on Refined Draft as of 30th October
THE UNIDROIT PRINCIPLES 2010:
RfG – Fast Fault Current Injection Update
Architecture and institutional issues for AeroMACS
INTERCONNECTION GUIDELINES
Review of System Alerts
DS477 Draft Safety Guide: The Management System for the Predisposal and Disposal of Radioactive Waste CS to develop the draft IAEA Safety Guide on the.
RfG Implementation Fault Ride Through
Afsnit 7 - Afsluttende bestemmelser
Implementation of Connection Network Codes The French process
Implementation of Connection Codes in Norway
Grid Code Review Panel 16th August 2017
Transmission Workgroup 4th October 2012
KORRR INFORMAL STAKEHOLDER WORKSHOP
RealValue H2020 Overview RealValue project funded under H2020 LCE 8 – 2014: Local / small-scale storage Commenced 1st June 2015 (duration 36 months) EU.
Storage Connection requirements
Topic Operational Information Exchange
Project WECC-0100 Update Load Modeling Task Force
WG Belgian Grid Implementation Network Codes.
Implementation of Connection Codes in Norway
Update on European Network Codes
Implementation of Connection Network Codes The French process
Afsnit 7 - Afsluttende bestemmelser
Ex-ante conditionality
CAP105 – National Grid’s name change
Implementation Network Codes: status update
Alignment of Part 4B with ISAE 3000
MOD_19_18 Part B Housekeeping 1 21st June 2018.
MODELING DG IN BASE CASES
Working Group on Data, Information and Knowledge Exchange
Dissemination Working Group Luxembourg, May 2009
MODELING DG IN BASE CASES
Updating the Article 6 guide Outline of envisaged changes
Summary Issue Modification Aim Effect of the mod Impacts
Project WECC-0100 Update Load Modeling Task Force
ISO 9001:2008 – Key Changes NOTE: use of this webinar depends on the instructor/speaker using the text in the notes of the slides!! Examples and speaking.
Natura 2000 management group Brussels, 19 May 2011
Alignment of Part 4B with ISAE 3000
ESTABLISHING CONSERVATION MEASURES FOR NATURA 2000 SITES
Non-Assurance Services
Implementation of Connection Codes in Norway
Alignment of Part 4B with ISAE 3000
GSC position on key WRC-19 AI 1.5 ESIMs
Presentation transcript:

Demand Connection Code GC0091 Demand Connection Code Demand Side Response requirements

Overview Summary of DSR under DCC Draft legal text prepared for DSR (DCC Article 27 – Article 30) Issues table prepared Aim to discuss:- High level drafting Issues Concerns Correct interpretation Discussion Next Steps

Summary of DSR Services under DCC Not Mandatory but applicable if a party wishes to provide DSR Remotely Controlled (Instructed) Demand response Active Power Control Demand response Reactive Power Control Demand response Transmission Constraint Management Autonomously Controlled (Automatic) Demand Response System Frequency Control Demand Response Very Fast Active Power Control

General Issues (1) Not all DSR providers will be CUSC signatories hence the term User may need changing How would non CUSC parties be treated or would the Commercial Agreement simply refer to Grid Code and Distribution Code clauses ie The Commercial Agreement simply states the Provider must comply with the appropriate clauses of the G Code and D Code Do we need to define a new term of Commercial Agreement – Would this be equally applicable between Grid Code and D Code Do we need to define a new term – Aggregator Art 28(2)(c), (e), (f) (k) and (l) – Demand Units connected below 110kV – it is assumed these issues are caught by National Governance (Ref Art 6 and Art (9)(1)) and do not require explicit reference in the Codes Standards for Operational Metering and Data Exchange – For Grid Code this would probably be via the RES. For DNO’s this requires further clarification

General Issues (2) Art 28(2)(g) Protection limits - Requires workgroup discussion – this clause is unclear Art 28(2)(j) This is not clear – Requires workgroup discussion Art 28(2)(k) Rate of change of Frequency – This has been set at 1Hz/s second over 500ms timeframe to ensure consistency with RfG. Consideration needs to be given to performance under times of System stress including fault ride through and consistency with other codes Art 28(2)(I) Voltage / Frequency signals – Are these issues not already covered by Art 28(2)(d) and Art 28(2)(e). Art 29(2)(b) As per previous slide Art 28(2)(c) – (k). The same comments also apply to Art 29(2)(b) – (d) Art 29(2)(g) Not well worded - requires further workgroup discussion General Glossary and Definitions requires further discussion

Questions Do the requirements in Articles 27 – 30 provide sufficient flexibility for all types of providers to offer the services they wish to provide without resulting in undue restrictions Are any parts of the DCC Demand Side Response provisions unclear. Is it appropriate to specify minimum requirements in the Grid Code and link any contract to those provisions. Are any of the requirements unachievable Do these provisions provide adequate flexibility for Aggregators. Does any work need to be addressed at a GB level to promote the role of Aggregators for DSR provision

Next Steps Consider provisional Legal Drafting and seek work group comments Consider issues and update legal text as necessary Consider Glossary and Definitions Repeat process as applied to Articles 27 - 30 for DCC - Articles 12 – 21 in respect of Transmission Connected Demand Facilities, Transmission Connected Distribution Facilities and Distribution Systems Discussion