East Area Renovation Project Team meeting # 2 – EDMS News

Slides:



Advertisements
Similar presentations
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Advertisements

Planning for Certification in Plan your project In this presentation we present the tasks that must be completed in order to achieve certification.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Development plan and quality plan for your Project
Andre Henriques DGS/SEE LIU-PSB. S AFETY R EQUIREMENTS & S AFETY F ILE 14 TH F EBRUARY 2013 February 2013.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
André Henriques DGS/SEE LIU-PSB OOSTER. HSE S AFETY C ORRESPONDENT 13 TH S EPTEMBER 2012 September 2012.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
1 1. Some recent views ( ) 2 Linac tunnel
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
LIU Safety Packages: Kick off Meeting A. Funken, I. Kobzeva BE Safety Unit LIU Safety Packages Kick off Meeting, 30/07/2015.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Safety Documentation Formerly an exotic unknown, today part of the work!
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Engineering Environment Awareness
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Building Coordinators Luncheon January 20, Agenda Welcome – Pete Strazdas and Jan Van Der Kley LUNCH Presentations Building Coordinator Custodial.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer International Review of the Inner Triplet Quadrupoles (MQXF) for HL-LHC.
Electrial Safety LS2 days November 2016 AP
Cryogenic safety organisation at CERN
LIU / HL-LHC Cost and Schedule Review
LHC intervention scheduling with the Work Acceptance Tool
Linac4-PSB 160 MeV connection readiness review
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
TC activities.
Strategy for conformity of non-standard cryogenic equipment
Safety Clearance of NA62 01/09/14 FV.
East Hall under construction
Parliament and the National Budget Process
Naming convention and layout database for the East Area
Safety Documentation EHN1
Forecasts for waste and radioactive material storage
HSE rules & regulations
LIU – EVM status and next steps
Configuration Management and Layout Database ELENA Project
East Area Renovation Project team #7 News
Lead bricks painting General procedure and its practical application
East Area Renovation Project team #6 Launch safety agreement
EP Experiments safety validation process Safety Permits
East Hall under construction
East Hall under construction
Enterprise Content Management Owners Representative Contract Approval
Planetary Protection at ESA
DOE Review of the LCLS Project October 2006
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
CF Scope, Management & Organization
East Hall under construction
East Area Renovation Supply of control rooms b.157
Safety in the East Area Renovation Project
East Hall under construction
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
eSPS 2nd CDR meeting – 17th June 2019
Presentation transcript:

East Area Renovation Project Team meeting # 2 – EDMS1721265 News East Hall under construction - 1962 East Area Renovation Project Team meeting # 2 – EDMS1721265 News Sébastien Evrard / EN-EA, 23-09-2016

NEWS Project management Report to IEFC Safety Organizational tools WP meetings overview S.Evrard, 02-09-2016 IEFC

Project mandate CLOUD, IRRAD & CHARM Detailed study Priority for the Organization Cost & Schedule review Energy optimization & sustainability effort https://edms.cern.ch/document/1715122/1 S.Evrard, 23-09-2016 Project Team #2

Project management The East Area Renovation is a Cost to Completion (CtC) project fully driven by the EN-EA Group. Project management plan (PMP) under approval EDMS 1716531 Proposed structure Courtesy P. Bonnal / OpenSE S.Evrard, 23-09-2016 Project Team #2

Project Board (proposed membership) S.Evrard, 23-09-2016 Project Team #2

Project Team (proposed membership) S.Evrard, 23-09-2016 Project Team #2

IEFC report on September 2nd https://edms.cern.ch/document/1716532/1 Feedbacks: include EN-MME in project team (synergies with B.156) Include EN-HE and a representative from RP-waste in project team Update PLAN tool with new activity requests  action needed from each group ! Improved accessibility to beam line equipment is required Offices for physicists in shift: B. 263 is an option (discussion with EP space manager) Energy savings  less cooling power required  some cooling power available for the South Hall (OpenMed) Schedule: distinguish Beam commissioning & Hardware commissioning: different responsibility and time slot. Survey team would like to implement a new reference network in B. 157. S.Evrard, 23-09-2016 Project Team #2

Project Safety Officer (PSO) The Project Safety Officer (PSO) oversees and coordinates safety aspects of the EA renovation project: verify that safety aspects have been correctly considered within the different work packages, that the proposed safety measures are consistent with the general Safety policy of the Project as well as with the CERN safety rules, and that they are effectively applied. Identify the safety issues arising at the interface between work packages and, whenever required, asking the relevant work packages to apply appropriate measures. Coordinate the editorial work for the safety documentation of the different facilities concerned by the project. The PSO is Erwan Harrouch (EN-EA) S.Evrard, 23-09-2016 Project Team #2

LSA (Launch safety Agreement) This document provides an overview of the conventional (non-radiological) Safety requirements applicable to the project and its related Safety documentation. After the launch Safety discussion (held on 19/09/16), it is the 2nd Step of the editorial process in the Safety Documentation Management procedure (EDMS 1177755). This document is an integral part of the Safety file for the project that the Project Leader shall: maintain and keep it updated during the life cycle of the project in order to demonstrate compliance with the Safety requirements stated in this document; make available to the HSE Unit upon request and before any periodic inspection. Safety domains relevant to the project are identified jointly (HSE + Project) General Safety requirements are defined accordingly by HSE PL ensures that Project Engineers follow these safety requirements in their WP’s. Domains covered: Products and material, Mechanical Safety, Structural Mechanics, Welding activities, Heating, Ventilation and Air Conditioning (HVAC) Systems, Electrical Safety, Non- ionizing radiation Safety (excluding sound and UV), Chemical Safety, Fire Safety, Noise, Workplace Safety, Protection of the environment, Worksite Define need (or not) of formal «safety clearance» given by HSE Head prior to operation S.Evrard, 23-09-2016 Project Team #2

Organizational tools EDMS: https://edms.cern.ch/project/CERN-0000169544 Indico: https://indico.cern.ch/category/8407/ E-groups: East-area-renovation-project-team@cern.ch : members of the Project team. East-area-renovation-core-team-project@cern.ch: members of the Project core team. SharePoint: https://espace.cern.ch/East-Area-Renovation-Project dfs: https://dfsweb.web.cern.ch/dfsweb/Services/DFS/DFSBrowser.aspx/ Workspaces/e/EastAreaRenovation/ S.Evrard, 23-09-2016 Project Team #2

WP meetings Inputs for Thursday 18 August EN-EA EQUIPMENT/SYSTEM CONCERNED: detailed list of items Schedule Cost/Budget Procurement Manufacturing Logistics Design/integration Interfaces: impact on other items (cabling, cooling, control,…), removal, waste. Resources (manpower & budget) Risk assessment Safety (hardware, operation, safety file) AOB Thursday 18 August EN-EA Thursday 25 August BE-BI Thursday 01 September TE-MSC Thursday 15 September TE-EPC Thursday 22 September EN-STI Thursday 29 September EN-CV Thursday 29 September SMB-SE Friday 30 September EN-EL More to come in October S.Evrard, 23-09-2016 Project Team #2

Next PT meetings The next Project team meetings are going to take place on: Friday 23 September, 15.00-16.30 in B.30/7-010 Friday 21 October, 15.00-16.30 in B.30/7-010 Friday 18 November, 15.00-16.30 in B.30/7-010 Friday 16 December, 15.00-16.30 in B.30/7-010 S.Evrard, 23-09-2016 Project Team #2

Thanks for your attention!