Storage Ring RF Systems

Slides:



Advertisements
Similar presentations
IOT Measurements & Amplifier Improvements at Diamond
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
RF Synchronisation Issues
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
ANNEX. WP 1.04, Michael Ebert2MAC PETRA-III Review Meeting, DESY,29th November 2006 Sandblasted Center Conductor of a Cavity Input Coupler R a =
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Review of LLRF system based on ATCA standard, Dec 3-4, 2007 Piezodriver and piezo control.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Operational experience of high-power RF at Diamond Light Source Chris Christou, Pengda Gu, Alun Watkins Diamond Light Source.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
Solid State RF High Power Amplifier Developments at SOLEIL Ti RUAN, on behalf of SOLEIL RF Group CWRF10 CELLS-ALBA Barcelona Spain May
STATUS OF THE SOLEIL RF SYSTEM
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Upgrades and EM simulations for the Diamond SR HP Amplifiers
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
Other Utilities of ALBA LLRF
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
Operational experience of high-power RF at Diamond Light Source
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
Diamond LLRF Activities Pengda Gu For DLS RF Group.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
Status of the Diamond Storage Ring RF Systems Morten Jensen on behalf of Diamond Storage Ring RF Group ESLS RF 2009.
Possible LLRF Configuration in ILC Sigit Basuki Wibowo LLRF Workshop, Shanghai - Nov 5, 2015.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
Digital LLRF plans at the Australian Synchrotron P.Corlett, K.Zingre, G. LeBlanc Australian Synchrotron, 800 Blackburn Road, Clayton 3168, Victoria, Australia.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Improvements to Diamond Light Source RF Amplifiers Peter Marten On behalf of the Diamond RF Group* *also C. Christou, P. Gu, M. Maddock, S. A. Pande, A.
Report on Sigmaphi 75 kW RFQ Amplifier and Ferrite 75 kW Circulator Ralph Pasquinelli November 18, 2014.
Operation Status of the RF Systems and Taiwan Photon Source
LLRF development of SSRF RF Group and Linac Group
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
ESS LLRF and Beam Interaction
RF acceleration and transverse damper systems
RF cell Anders Sunesson RF group leader
Test of the dressed spoke cavity
Overview of cavity reliability at Diamond Light Source
Status of RF at Diamond Light Source and overview of upgrade plans
Overview and System Design for ESS LLRF Systems
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
ILC LLRF Status Ruben Carcagno, Brian Chase
RF interlocks for higher intensities (LMC 15 June)
Snr Power Supply Engineer
SPARC RF gun status by P. Musumeci Review committee
WP02 PRR: Master Oscillator and RF Reference Distribution
Test plan of ESS HB elliptical cavity
TTC meeting, Feb. 6-9, 2018, Milan Trouble Shorting of CW Operation of Superconducting Linac for Chinese ADS Yuan He, Yongming Li, Xinmeng Liu, Zheng Gao,
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
CEPC RF Power Sources System
RF Local Protection System
Status and New Developments of ALBA RF Systems
Status of the ASTRID2 RF systems
RF introduction Anders Sunesson RF group leader
Status and New Developments of ALBA RF Systems
Presentation transcript:

Storage Ring RF Systems Status of the Diamond Storage Ring RF Systems Morten Jensen on behalf of Diamond Storage Ring RF Group ESLS RF 2009

Diamond Storage Ring RF Plant RFTF Cryogenic Plant HV PSU Circulator and load Superconducting Cavities LLRF , DAs and Aux Supplies IOTs and Combiner ESLS RF 2009

MTBF of RF systems and number of trips Operating Statistics MTBF of RF systems and number of trips MTBF up by factor of 4 MTBF per run; Number of Trips 2008 2009 Typical MTBF as ~20 hrs dominated by cavity 2 trips From Run 2 2009, MTBF increased, cavity 2 trips ~ ½ of all trips MTBF of last 4 runs (since ~ May ‘09) = 80 hrs for all SR RF systems incl cryo Repeat faults include: cavity, arc detection and IOTs. ESLS RF 2009

Cavity coupler still suffer from occasional trips Pulse conditioning indicates presence of MP band ESLS RF 2009

Installation of fast Data Acquisition Fast data acquisition system based on National Instruments PXI platform Use of three 60 MHz, 8 channel oscilloscope cards. Control of external oscilloscope Control of ‘slow’ acquisition of temperatures and pressures Simultaneous data acquisition with all channels synchronised. ESLS RF 2009

Installation of fast Data Acquisition Close up of fast signal on e- pickup ESLS RF 2009

Interruption of RF signal for 10 μs is possible without loss of beam. MP signal is typically observed 10-20 μs before complete loss of field. Is it possible to detect the onset of multipactor, drop the RF to break the MP condition, re-apply RF hard to re-establish cavity field amplitude and phase without loosing the electron beam? Interruption of RF signal for 10 μs is possible without loss of beam. Design underway of fast trigger circuit to detect MP pulse RF drive to the cavity will be interrupted for a defined duration. Reflected power signal will be gated for this period. Trial hardware for operations. ESLS RF 2009

Spares which have not been installed are not included above 300 kW Amplifier Four 80 kW IOTs per system Two systems in operation with users Third system available for RFTF, conditioning and testing. Spares which have not been installed are not included above ESLS RF 2009

System 1 upgrade required. Options were: IOT Upgrade Project System 1: TED IOTs IOT type TH793 and one TH793-1 have been used. Average IOT life on failure 4300 hrs; 11 failures to date 1 IOT > 17000 hrs IOT trips are typical prior to failure. System 2: E2V IOTs IOT type IOTD2130 First IOT removed from operation at 14800 hrs. IOT tripped twice and was replaced. Initial indication suggest that IOT will condition back up Conclusion: System 1 upgrade required. Options were: Upgrade to TED TH793-1 including full circuit or Upgrade to E2V IOTD2130 including full circuit Tender exercise started → Upgrade of System 1 to IOTD2130 IOTs ESLS RF 2009

Build and Assembly of new IOT circuits IOT Upgrade Project Build and Assembly of new IOT circuits Split output cavity Single output cavity tuner Before installation of output cavity Coaxial output First new circuit in user operation ESLS RF 2009

Problem with beam loss during system set up by 360 deg phase rotation LLRF Progress Problem with beam loss during system set up by 360 deg phase rotation Variation with phase of LLRF readings of Pfwd, Probe confirmed Variation due to distortion in IQ demodulator chain 8 phase lookup tables produced Instability at certain phases → faulty module Variation of suppression at different phases studied Power vs phase Power variation as the phase is rotated Polar plot of IQ demodulated forward power signal. Distortion clearly visible at the higher input level. x3 improvement from 8-point look up table ESLS RF 2009

Selection of other work Pulse conditioning box designed, built and installed LLRF Output Pulse generator input Programmable parallel port RF Bypass for normal Operation Local Display PSU drives relay circuits Additional interlock ESLS RF 2009

Selection of other work Drive amplifier Power monitoring: local read out data archiving Design and build of IQ phase modulation to enhance synchrotron oscillation for accelerator physics studies such as low alpha optics FPGA development – phase measurement ESLS RF 2009

FPGA development Initial test set-up PSU Signal generator with phase modulation MO to generate clock signal USB connection to PC ADC converter: ADS 5474 evaluation board FPGA Data capture: TSW1200 by TI ESLS RF 2009

Measurement of RF signal with 0.001 rad phase modulation Raw I Q data Calculated phase Phase calculated from Calculated phase Raw I Q data Measurement of RF signal with no deliberate modulation showing drift of the signal generator Measurement of RF signal with 0.001 rad phase modulation Initial phase resolution obtained is better than 0.02 deg RMS before filtering or with 0.007 deg RMS with filtering applied ESLS RF 2009

No loss of beam or beam time Cryogenic Plant FO to electrical conversion Frequency to Current O/P Turbine To PLC Turbine speed readout Dewar level Turbine control valve FO cable Problem 1 Intermittent turbine speed sensor miss-reading → Sudden drop in ‘speed’ Gas inlet to turbines opens to 100% under PID control. Dewar level rises indicating increased performance despite ‘low’ speed Danger of running out of gas or overfilling of dewar Changed speed transducer, no more faults to date (fingers crossed). Problem 2 No loss of beam or beam time Reduced refrigeration performance Top Heat Exchanger running warm Temporary fix by additional heating on thermal LN2 interlock Suspect contamination of the LN2 heat exchanger ESLS RF 2009

NLS Gun Design using CST Studio The cell dimensions and coupling gap are adjusted iteratively for field balance and critical coupling at 1.3 GHz. Axial E field normalised to the maximum field in the first cell for the p mode ESLS RF 2009

S11 of final design 0-mode undercoupled, p-mode critically coupled. Aluminium test cavity ordered. Funding approved for Cu cavity. Bench testing about to start. Gun test facility under consideration ESLS RF 2009

RF Test Facility Shielded high power cavity conditioning area Full PSS control 300 kW RF power from any of the 3 amplifiers Integration into the Liquid Helium Refrigerator Full cavity control system ESLS RF 2009

RF Test Facility ESLS RF 2009

On behalf of the RF Group Morten Jensen Pengda Gu Matt Maddock Peter Marten Shivaji Pande Simon Rains Adam Rankin David Spink Alun Watkins Thank you for your attention! ESLS RF 2009