UNIT 8-300 MW TPP KAKANJ Sarajevo, May 2017.

Slides:



Advertisements
Similar presentations
Integral system for production of healthy food and electricity-SOLVAP
Advertisements

Pagina 1 de 3 CEPSA Química QUIMICA Palos de la Frontera Jul 12 th, 2012 CEPSA QUIMICA PALOS DE LA FRONTERA IPPC DEVELOPMENT.
Energy efficient technology and equipment implementation in plumbing and heating installations УКРІНТЕРМ 2011.
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
EP BIH. Generation, distribution & supply of electricity Established in 1946 Share Capital billion EUR (90 % state & 10 % private share) Operates.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Practical use of newly developed BAT conclusions Valts Vilnītis.
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
ELECTRICITY LIBERALIZATION IN BRAZIL & ENVIRONMENT GRENELEM PROJECT - WP 1 Santiago de Chile, 10-11th September 2001 The liberalization of the Brazilian.
The Impact of Liberalisation on the Environmental Performance of the Electricity Sector in Germany.
EP BIH.
GREEN BUILDING.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
Marek Kras. A combined cycle gas turbine power plant, frequently identified by CCGT shortcut, is essentially an electrical power plant in which a gas.
29 September 2004 Klaas-Jan Kramer/Carmen Balaban ENVIRONMENTAL MANAGEMENT SYSTEMS A solution for compliance assurance.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
Reducing energy waste Good for us, great for the environment.
1 Energy Sector Development in Montenegro: reforms, goals and overall strategy Government of Montenegro Ministry of Economy 6 November 2009, Podgorica.
Partner for progress Safety and quality requirements for mCHP products Falco Thuis Kiwa Gastec Certification May 2008.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA.
National Seminar Role of DER in the EU and Current Status in the Baltic States 6 March 2007 Current Status of Energy Policy on Development of Distributed.
No energy wasted Example of an energy strategy in urban areas Brussels, 22nd June 2006.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
1 Permitting of industrial facilities in Croatia.
The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.
Introduction of international standards in energy sector CF “Centre of sustainable production and consumption” Almaty, July 4-6 Safargaleyeva Guzaliya.
Financing energy projects Basic tips & tricks.  Operational Programme Infrastructure and Environment  16 Regional Operational Programmes  Rural Areas.
ENERGY AGENCY LITHUANIA Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period Marijus Franckevičius.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Ljubljana, 9 July 2014 Energy and Sustainability building a sustainable energy future - without the hot air Samo Fürst, GEN energija.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
1 Norwegian experiences with renewable energy in the district heating sector and industry International training conference on RES, Gdansk November.
The IED/ELVs as seen through the Eyes of a User of Combustion Plant Dr Tim Rotheray.
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Biomass Cogeneration Facility Savannah River Site Aiken, SC
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
CROATIAN EXPERIENCE IN OPERATING AN ENERGY EFFICIENCY FUND under the regime of the EED Article 7 Vesna Bukarica, Ph.D. Head of Energy Efficiency Sector.
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
Ministry for Ecology, Energy, Sustainable Development and Sea in charge of Green Technologies and Climate Negotiations
CENERG 4 th THEMATIC WORKSHOP SLOVENIAN ELECTRIC POWER SYSTEM 1 SLOVENIAN ELECTRIC POWER SYSTEM.
Energy Management and Planning MSJ0210 Energy generation Eduard Latõšov.
Introduction to the philosophy
Renewable energy support schemes in the Republic of Moldova
Energy Year 2016 Electricity
Minimum Set of Requirements for Suppliers
Electricity & Regulatory Overview of Korea
sHPP VRŠUMA Draga, KO Draga, Tutin, SRBIJA -Business Plan-
Minimum Set of Requirements for Suppliers
JP Elektroprivreda BiH d.d. – Sarajevo
„Banat sun 4 all-Pilot project for promotion and implementation of solar energy for sanitary water heating“ 1.
RENEWABLE ENERGY SOURCES IN SLOVENIA
INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE
Solar Power Plants in the Negev Desert Global Infrastructure Leadership Forum New York City December 2007 Dan Weinstock Electricity Authority, Director.
HPP USTIKOLINA Sarajevo, May 2017.
Kansas State University
Financing Public WSS Infrastructure: Reflections on competing investment drivers and other factors to be considered 3 Challenges & 3 Recommendations from.
Urban planning & Infrastructure optimization
Three times more energy reaches the customer with natural gas
Regional Greenhouse Gas Initiative: First auction results & the future
Coal – security of coal supply considerations of EURACOAL
Ефикасно коришћење енергије у металургији-IPPC
Finnfund’s possibilities to finance energy investments in Ukraine
REReP regional meeting on “Energy and climate” in South Eastern Europe
CZECH REPUBLIC Joined the EU on May 1, 2004
EU ACCESSION PROCESS Republic of Serbia
Your partner with over 70 years of experience
ECOLOGISATION OF VARNA TPP
IPA 2008 – support to environment Brussels, 28th November PEIP Regional Meeting Joanna Fiedler European Commission DG Environment.
Presentation transcript:

UNIT 8-300 MW TPP KAKANJ Sarajevo, May 2017

Location Replacement Units shall be built on the existing site of TPP Kakanj

KEY CHARACTERISTICS AND ADVANTAGES OF THE PROJECT Construction of the Unit 8 is providing replacement for the existing units, which shall be shut down by the year 2024 or 2030 (4×32MW, 1×110MW) Construction of the Unit 8 is providing continuous production of coal and restructuring of the “Kakanj (70%), Breza (20%), Zenica (10%)” coalmines, part of Concern JP EPBiH Unit 8 shall be designed as cogeneration unit, providing long-term supply of heat energy to the nearby cities Increased energy efficiency and accordingly reduced emission of greenhouse gases (units that will be shutdown have efficiency of around 30%, and the new Unit 8 will have in condensing regime 39 % and in cogeneration regime over 70% efficiency) Unit 8 shall be designed in compliance with best available techniques (BAT) in accordance with the IPPC Directive, which assures the emission of all pollutants to be below the limit values and according to the legislation of EU and B&H

BASED ON COMPLETED INVESTMENT AND ENVIRONMENTAL DOCUMENTATION ALL ESSENTIAL APPROVALS AND PERMITS ARE OBTAINED Preliminary water approval, Agency for Sava river basin Environmental permit, Federal Ministry of Environment and Tourism Certificate for connection of Unit 7 to Electrical Grid in B&H, NOS BiH (ISO BIH – Independent System Operator in B&H) Urban planning permit, Federal Ministry of Physical Planning Conditions for connection to the transmission network of 400 kV, Elektroprijenos BiH. The decision to extend Urban planning permit, Federal Ministry of Physical Planning Water approval, Agency for Sava river basin Previous building permit for construction, Federal Ministry of Physical Planning

OPTIMAL POWER AND TECHNOLOGY Power 300 MW Production 1755 GWh (for 6.500 h of operation) Efficiency 40% (in co- generation mode >70%) Coal 12.874 kJ/kg Coal Consumption 1,3 million tons/year Emission SO2 < 150 mg/Nm3 Nox < 200 mg/Nm3 Dust < 10 mg/Nm3 Technology of Fluidized Coal Combustion, parameters 566/566ºC and 167/40 bar, efficiency > 39%

THE FINANCIAL ASPECT OF INVESTMENT Investment cost in construction of Unit 8 529,3 million EUR Average cost price of produced electric energy (coal price of 2,43 EUR/GJ) 42,66 EUR/MWh Investment cost in construction of Unit 8 with Coalmine 626,3 million EUR Implementation of the project will be through Project Partnership model. Selection of Project partner will be through international open tender procedure.

Contact details: JP Elektroprivreda BiH d. d Contact details: JP Elektroprivreda BiH d.d.–Sarajevo Vilsonovo šetalište 15, Sarajevo General manager: Bajazit Jašarević Tel: +387 33 751 002 E-mail: bajazit.jasarevic@epbih.ba