Proposition de routing des cables :

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
Performance New requirement s for circuit integrity: enhanced cables BS : 2002 Fire Detection and Fire Alarm Systems for Buildings Part 1: code.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.

(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Barriere O, Le Roux P
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
IMPACTS OF INSTALLING THE REFERENCE MAGNET PLACEMENT IN B december 2014 Fulvio Boattini & Natacha Lopez Hernandez.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
BGV 05-may-2015CERNMassimiliano Ferro-Luzzi 1 BGV cooling : test & installation plans  point 8  LHC tunnel.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
LHC-YETS Coordination meeting #9 24 th November, 2015.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
BA6 newsRF power Cable list being worked out. BA6 newsLLRF Cable list done, pending check and confirmation.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
TDC2/TCC2 Electrical remedial work /12/14
YETS & LS2 Works EN-EL / Power distribution
CC LLRF SM18 test plan and BA6 infrastructure
Cabling for LHCb Upgrade
Linac 4 Faraday cage P. Baudrenghien , D. Stellfeld BE/RF
EYETS Works EN-EL [ FC excluded ]
Schedule CM SPS G.Vandoni.
YETS & LS2 Works EN-El on LHC / Power distribution
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Update of MVD services and requests
Equipment simplified model SMR UR safety
EHN1 Extension planning
BA6 – crab cavity activities in EYETS
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
Racks in BA6 SPS test stand Integration 5 October 2017.
EN-EL-FC Activity Jeremy Blanc, EN-EL-FC.
SPS cryogenic proximity equipment and SM18 validation
BE-ICS activities for LIU Project
Update on HW commissioning
LV Safe Powering from UPS to Clients
prepared by R.A.Barlow 30/056/2016
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
WP4 RF equipment volume needs
352MHz Klystron Control for the 3MeV Linac test stand
SPS CC: Final plan for interlocking of crab cavities in SPS
HL Consolidation Day Analysis of needs from BE-ICS
XFEL Vacuum System Commissioning
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
NA CONSOLIDATION & SAFETY SYSTEMS
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS & LS2 Works EN-EL / Power distribution
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
ACS news Circulator TCU: control tests in progress All cavity racks
Rack installation and local tests for the MEBT Chopper Rack
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

Proposition de routing des cables : Avec 2 energy chains de part et d’autre de la table Chaine amont (61734) : les fibres optiques, les cables de thermométrie de Sosin, les cables des cryogénistes) Chaine aval (61744) : tous les autres et notamment les cables coaxiaux des RF Re-routing des cables depuis l’actuelle fente dans le bus-bar, 6314m, jusqu’à la fente en aval, 6318m

Energy chains

Integration TUNNEL BA6 SURFACE BUILDING New reheater Mini-rack CRG substituting the crates Phase separator LN2 Blowers may go on the ceiling Mini-rack for interlocks (NE48 cables) Patch panels for RF-Power and LLRF, flexwell cables (3/8’’ and 7/8’’) BA6 SURFACE BUILDING EN/EL should give us the dimension of the 2 switchboards

Questions EN/EL 1. UPS requests 3. Re-ALIM ? ITEM DESCRIPTION V kW 1 RA4721 230 3.5 2 POWER STRIP FIP CRATES 3.0 3 CRYO RACK RA10100=TA6 4 QUR1HEM02-20401 6.0 5 Cage Faraday 400 1.5 6 RF Controls 1.0   2 PLC 2 Interlocks 1 table interface TOTAL 18.5 Can’t this be reduced? Better estimated ? see Gerardo’s slide Later, 4kW 4. PROGRESS on crab zone in the coming TS? 2. Additional DIC ? Transfer Table BE/ICS Oxygen Deficiency Detection and Alarm flashes …

Cable routing

Cable routing

Cable routing – flexwell 7/8’’ and 3/8’’ LHC example

Cable routing From behind the transfer table… 6314m

Cable routing …to 4m more downstream 6314m 6318m

Activities TS#2 For the next TS, RF-Power foresees to install a load at the end of the RF Power lines, connect it to the lines and to water, to be able to test the emitters further on. EN/EL: can you proceed to re-routing of the cables and cutting the flexwell, once the patch panel is installed? EN/CV: is it possible to remove the unused water manifold (clarinette) during a 36h Technical Stop? Others…?