Energy Company Obligation ECO2e

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Changes to the Energy Company Obligation A supplier’s view Nigel Dewbery Head of Obligation Delivery CAN Training Day 7 th October 2014.
Transition from Q1- 8th to Q1- 9th edition
Changes to the Energy Company Obligation A Suppliers view of the implications Nigel Dewbery- Head Of Obligation Delivery CAN Conference 5 th February 2014.
Energy Company Obligation SECAN Update Robert Marjoram Senior Account Development Executive 3 rd November 2014.
A Roofer’s Guide to Sustainability YIRTG is pleased to acknowledge that the Roofers Guide to Sustainability Modular Programme was developed as a result.
Samuel Steel Safety Group Meeting Four November 14, 2013 Samuel Safety Systems.
The Solid Wall Insulation Guarantee Agency Solid Wall Solutions: Focus on Quality Solid Wall Insulation Guarantee Agency Ecobuild 2 nd March 2010.
Ofgem ECO 1.2 consultation Summary of district heating workshop 13 August 2014.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
Changes to the accreditation of measures between EEC2 and CERT Urszula Kulpinska 4 September 2007.
Domestic GDA Training – Annex F – ECO Regulations1Training Material © Stroma Certification 2012 | Version 1.0 ABBE Level 3 Diploma in Domestic Green Deal.
Energy Companies Obligation Update David Fletcher 7 October 2014.
Summary of Ofgem ECO 1.2 consultation workshop Minimum insulation levels for primary measures and building regulations 28 August 2014.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
Proposed Code of Practice for Inspections 3 rd Edition David Capon JAG UK Manager Keith O’Brien Cable & Wireless Worldwide.
An update on ECO funding Presentation to EMCAN Forum Presentation By: Peter O’Neill Date: June 2013.
Green Deal Supply Chain Breakfast Briefing Skills for a Competent Green Deal Workforce Wednesday 21 st November 2012.
Carbon Action Network Conference Cardiff 30 April 2013 The Energy Company Obligation and the Green Deal Marcus Brooks DECC ECO Team.
Changes to the Energy Company Obligation A Suppliers view of the implications Justine Biggs – Business Development Manager.
Sponsors Address CAN Conference and Award Dinner Dr Tony CockerCEO E.ON UK 3rd September 2013.
Policy Context – The Governments Plan for Action Tyrone Homes Sustainable Energy Policy Division, Defra.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
CESP Community Energy Saving Programme energy made better.
Changes to the Energy Company Obligation A supplier’s view Nigel Dewbery Head of Obligation Delivery CAN Training Day 4 th July 2014.
S upport for Local Authorities Neil Marshall Chief Executive.
Building Act Post Moratorium Reforms Occupancy Certification System Department of Lands, Planning and the Environment May 2016.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
1 The Green Deal Is It A Fair Deal? Dave Princep B Sc (Hons), LLB, MCIEH Independent Housing Consultant.
Proposed Irish Standard — Code of Practice for Procurement and Use of Unbound Granular Fill (Hardcore) for Use under Concrete Floors. Hubert Fitzpatrick.
CONTEXTUAL STRATEGY GROUP LLC Putting customers at the heart of everything we do ECO & Green Deal Nikki Foreman – J Tomlinson Limited.
1 IUCN GL GLPA Standard Framework Matthew Wenban-Smith (Technical Support to Green List PA Steering Group) 25 th February 2014.
Access to Funding and Grants for Landlords. LOFT AND CAVITY WALL INSULATION Under current CERT funding: tenants may be eligible for insulation measures.
Association of Cornish Property Professionals June 2016.
The Regulatory Assistance Project China European Union United States E, M&V role of the UK Energy Regulator (Ofgem) in Energy Efficiency.
2016 Primary Assessment Update 27th September 2016
E.ON Energy Company Obligation - Help to Heat
World Health Organization
Credentialing Requirements
ISO/IEC
Court Review of Personal Insolvency Arrangement
Strategy for conformity of non-standard cryogenic equipment
Administration of a FIDIC Contract - Project Control
ECO2t Overview ALEO North East 16th June 2017 Nicola Marshall
Content of Tender Dossier Instructions to Tenderers
The subcontract template
Temporary Works Co-ordination
Outcome TFCS-11// February Washington DC
Project Development and Managing your Build Agenda
Outcome TFCS-11// February Washington DC
Sales Process March 2017.
Guidance notes for Project Manager
Royal Mail Group: Publishing Volume Commitment Incentive.
About Us City Energy is based in Cardiff and working with the RLA to help to improve EPC ratings and reduce energy bills.   We have been providing top.
Royal Mail Group: Publishing Volume Commitment Incentive.
European Social Dialogue Agreement on Silica Claire Lanne (IMA-Europe)
Housing Standard Review & Building Regulation changes
Royal Mail Group: Testing and Innovation Incentive.
Royal Mail Group: Business Mail Testing and Innovation Incentive.
Preparing for Universal Credit: lessons from the front-line".
How to conduct Effective Stage-1 Audit
Royal Mail Group: Testing and Innovation Incentive.
EU Food Safety Requirements: - Hygiene of Foodstuffs -
Scheme for Growth Pilot
Overview of the recommendations on software updates
Royal Mail Group: Publishing Volume Commitment Incentive.
Pixie Energy ECO Switch
Future ECO timelines The following is still an indicative timeline as we are awaiting decisions from ministers Autumn 2017 – need to decide what we are.
Smart Meter Installation Code of Practice Training Webinar
Presentation transcript:

Energy Company Obligation ECO2e NORTH EAST ASSOCIATION FOR LOCAL AUTHORITY ENERGY OFFICERS Denise Rogers 16th June 2017

AGENDA Energy Company Progress toward overall ECO2 Obligations. ECO2 eligible measures Potential Project process Project Compliance. Questions.

Energy company progress towards overall ECO2 obligations: HHCRO CERO: BG achieved the largest volume increase with 216kt (6%) gain. BG remain the only supplier in the Big Six not to reach ECO2 target. NP (incl. TP): 4th / 6 HHCRO: BG saw the largest gain with £53m (5%) increase in month, reaching ECO2 target. EDF, EON, SSE and SP all delivered significant gains despite already reaching target – indicating ECO2e early delivery. NP (incl. TP): 6th / 6 SWI: EON delivered 1.5% (9kt) of their ECO 2 target in-month. 100% Carbon this month was SWI. BG and SSE showing signs of ECO2e early delivery. NP (incl. TP): 5th / 6 This chart shows energy company progress for all measures notified to the end of March 2017 and approved by the end of April 2017 as a percentage of ECO2. All surplus actions from ECO1 to ECO2 have been approved and are included in the chart. 

Energy Company progress towards overall ECO2 obligations:- CERO This chart shows energy company progress for all measures notified to the end of March 2017 and approved by the end of April 2017 as a percentage of ECO2. All surplus actions from ECO1 to ECO2 have been approved and are included in the chart. 

Energy Company progress towards overall ECO2 obligations:- Provisional Solid Wall Minimum Requirement This chart shows energy company progress for all measures notified to the end of March 2017 and approved by the end of April 2017 as a percentage of ECO2. All surplus actions from ECO1 to ECO2 have been approved and are included in the chart. 

ECO2t Which measures? ECO2t Measures Table can be found on the ofgem website;- https://www.ofgem.gov.uk/system/files/docs/2017/05/eco2t_measures_table_-_may_2017_v5.pdf The ECO2t Measures Table provides information on eligible energy efficiency measures which suppliers can use to meet their obligations for measures installed from 1 April 2017 until 30 September 2018. The table includes the following information for each listed measure: •measure category •measure type •eligibility under ECO2t obligations CERO and HHCRO •in-use factor •standard lifetime •relevant PAS annex •measure name: format for notification to Ofgem. Additional information has also been provided for some measures. The list of measures is non-exhaustive. Please note that the measure types listed are those which are present in the deemed scores matrix. District heating systems have also been included, but these must be scored with SAP/RdSAP. Other measures may qualify, subject to review by us on a case-by-case basis.

What measures? Solid Wall insulation/External Wall insulation…..

What measures? Insulation…..

What measures? Heating….

Potential Projects Potential ECO project Discussions around project potential Project, carbon and funding levels reviewed by Npower and enter the Npower pipeline Approval from npower received, a funding offer will be made Finer details of project are drawn up and contract development begins. Contracts signed, Pre start meetings & work commences.

Always mindful of the Ofgem rules for compliant measures! All ECO Insulation measures must follow the contract for supporting evidence provided and meet the most recent criteria specified by Ofgem and the latest edition of PAS2030. Mandatory Requirements Standards of installation: PAS certification and installation by a person of appropriate skill and experience – From 1 June PAS2030:2017, including Pre-installation Building Inspection (PRIB) Deemed score input document including floor plan and photos as necessary Land reg extract or equivalent to confirm the premises are not social housing * DWP matched reference to confirm the occupier is a member of the Help to Heat Group * Lower Super Output Area (LSOA) Post code checker for CERO Rural if applicable Multiple premises such as tower blocks – Social landlord consent / fair processing and privacy Installation in accordance with Building regulation i.e., British Board of Agrément Certificates (BBA) / European Technical Approval (ETA) Appropriate Guarantees for all wall measures to support lifetime of measure Declaration of conformity and completed installation Insulation of SWI to include age of the building and the type of walls treated (i.e. brick or non-brick) Percentage of measure installed (POMI) where <100 per cent – evidence to include reasons and photos Percentage of Property Treated (POPT) required for score calculation - additional guide to follow Data set to be completed in the validation spreadsheet (ISS) Technical Monitoring to verify installation standards and compliance to ECO eligibility criteria * Not applicable to CERO installations

Compliance, a brief overview….. PAS 2030:2017: Summary Key points: Following changes since the launch of Green Deal the PAS2030:2017 standard is adapting to market feedback, and while the main goal is to still set out requirements for the installation of Energy Efficiency Measures (EEM), more emphasis has been given to the design specification, inspections and the Pre-installation building inspection. 1. Design Specification – The 2017 update provides that installers need to be satisfied that the information given on the system design is adequate before proceeding with install. Installers are encouraged to challenge the system designer or require further information if they feel it is required. The aim of this change is to give clarity to customers as to who is at fault should there be an issue with the EEM, whether it is the installer or manufacturer. 2. Inspections - There is an increased requirement (levels to be determined) on the number of inspections that will take place on the installer at each stage of the process. This means that there is more emphasis on record keeping by installers around suitability of the EEM.

Compliance PAS 2030:2017: Summary 3. Pre-installation Building Inspection (PRIBI) This is an enhanced requirement of the Pre-installation building survey and puts more emphasis on the building fabric and general suitability of a property to have the EEM. Minimal requirements that a PIBI covers are specified per specific measure as well as general requirements around: •The suitability and completeness of the design specification; •The suitability and completeness of the installation method statement; •Confirmation that the specified EEM can be safely and effectively installed at the designated location; •Potential for moisture build-up as a result of the installation; •Confirmation of the adequacy of ventilation prior to and after installation; •Potential instances of thermal bridging and planned actions for amelioration; •Risk to functionality and/or safety of installed services; •The status of pre-existing safety alarms and; •The presence of protected species.

Deemed Scores Guidance Deemed scores are fixed scores for each measure type that can be determined using three or four variables. • To determine the appropriate deemed score for a measure, installers must first select the appropriate measure type. They must then identify the basic attributes of the property in which the measure has been installed. • All deemed scores accounting for all property attributes are stated within the Ofgem deemed scores matrix. • For insulation measures, these attributes are split into three main variables: - the type of property the number of bedrooms in the property, and the main heating source of the property. • The percentage of measure installed (POMI) and percentage of property treated (POPT) must also be determined in order to calculate the correct score. • A basic guide on how to read the scores is presented in the ‘User Guide’ tab of the Deemed Scores Matrix.

Percentage of measure installed (POMI) and percentage of property treated (POPT) Percentage of measure installed (POMI) and percentage of property treated (POPT) both need to be determined and notified for each ECO measure scored using a deemed score. However, only the percentage of property treated should be used to determine the score. The POMI of an ECO measure must be 100% unless there are reasonable grounds for not doing so. The deemed scores assume that the measure type installed treats 100% of the property. For instance a cavity wall insulation (CWI) score will assume that all walls of the property are cavity walls and all of them are treated. A gas boiler score assumes that the entire property will be heated by the gas boiler.

Declaration of Conformity and Completed Installation This is the document that enables the customer and installer to sign for handover of the measure, and make a declaration against a range of energy company requirements. It meets the Ofgem requirements for:- Handover to customer (can be signed by someone acting on behalf of the occupant /landlord as long as they are not the installer, supplier or any other party in the supply chain). The PAS2030:2014 declaration of conformity or PAS2030:2017 claim of conformity. The declaration of completed installation. POMI % and POPT % Records the reason why 100 per cent of a measure was not installed and/ or where 100% of the property has not been insulated for the deemed score. The declaration of conformity confirms the following points:- This declaration is completed per measure type Handover should take place within 4 weeks of finishing work on each measure Handover date should agree with the completed cell in the validation spreadsheet or ISS That relevant documents, instructions and warranties have been provided to the customer Exception where multiple premises are owned by the same landlord, i.e., tower blocks or flats when handover of all measures installed of that type may have the same handover date and should be within 4 weeks of finishing work on the last measure:- Accompanied by a spread sheet listing all the properties in that one handover The variants for the measure type for deemed scores should be recorded on the accompanying s/sheet Any variations of per cent installed for measure / property should be recorded on the accompanying s/sheet

ECO2 Technical Monitoring - Insulation Technical Monitoring requirements: Technical Monitoring at a 5% minimum level must be conducted on each measure type based on the number of notified measures during the quarter. The actual measures to be monitored are randomly selected by the Technical Monitoring Agent (TMA). The selected measures need to be representative (by at least 3%) of the actual PAS2030 accredited company that installed the measure during the quarter. Where the number of measures of a particular type or installed by a particular installer is less than 100 for a specific period, monitoring should be conducted on at least one measure installed by each installer. The inspector must meet the competency requirements as outlined in the Ofgem guidance. Technical Monitoring (post installation) needs to take place within a specific time frame based on the measure notification deadline. Monitoring targets must be met by the end of each TM monitoring period TMA’s must notify npower directly in instances of non-access TM questions split into 4 areas: Score monitoring Technical Monitoring – Core TM questions Best Practice (optional) Health & Safety Monitoring – Energy UK safety questions (optional) 57

Business Development Manager Thanks You & Questions Denise Rogers Business Development Manager Mobile 07557196942  Email denise.rogers@npower.com