ОАО «Енисейская ТГК (ТГК-13)» филиал «Абаканская ТЭЦ» Oleg Malyshev student:FE14-01B
History Construction of Abakan thermal power plant began in 1972 with the construction of the production building peak-starting the boiler. 10 years after the start of construction, Abakan Thermal electric power plant was put into operation in 1982 and had one boiler BKZ- 420 Barnaul Boiler Plant and the 65 MW turbine generator. April 18, 1982 was developed the first megawatt-hour of electricity. This day is considered the birthday of Abakan thermal power plant. Currently, Abakan Thermal electric power plant has an installed electric capacity of 270 MW.
The structure of the company *Abakan (Khakassia, Tyva Republic, a part of the Krasnoyarsk Territory) *Barnaul (Altai Territory) *Kuzbass (Kemerovo region) *Krasnoyarsk (Krasnoyarsk Territory)
HR policy of the company. General Director of LLC "Siberian Generating Company" (performs the functions of the sole executive body of TGC-13) Mikhail Kuznetsov Varfolomeyevich . Chairman of the Board of Directors - Bolshakov Andrey Nikolaevich . Deputy General Director of LLC "Siberian Generating Company" - the director of the Krasnoyarsk branch of LLC "Siberian Generating Company", the representative of JSC "Yenisei TGC (TGC-13)" - Alexander E. Schlegel. The main activities of the company are: - supply (sale) of electricity, steam and hot water (thermal energy) at the established tariffs in accordance with electrical and heat loads; - The production of electricity; - The production of steam and hot water (thermal energy); - Procurement (purchase) of electric energy at the wholesale and retail electricity (capacity) market; - Procurement (purchase) of thermal energy from third parties; - The implementation of thermal energy to consumers, including power sales organizations. The total installed electric capacity of the enterprises included in the JSC "Yenisei TGC (TGC-13)", is - 1164 MW. Installed heat capacity - 3,017.4 Gcal / h. The main fuel for the stations of the company is lignite. Generation in 2015 was 6 942 million kWh of electricity and 7,219 thou. Gcal of thermal energy.
Vacancies. Title: project to consolidate the expert Contract type: Permanent Location: Kemerovo region Industry: TGC Kemerovo Contacts: Kemerovo, Kuznetskiy avenue, 30 Job published: 26 December 2016
Title: Specialist 1 cat. modeling and mathematical analysis on the wholesale market Contract type: Permanent Location: Kemerovo region Industry: TGC Kemerovo Contacts: BotvinAIu@sibgenco.ru Job published: 08 December 2016
Title: Head of Division 1C of SPP Contract type: Permanent Location: Krasnoyarsk (Krasnoyarsk Krai) Industry: Krasnoyarsk, "Krasnoyarsk branch of LLC" Siberian Generating Company " Contacts: 274-43-17 VasilevaIG@sibgenco.ru Job published: 01 December 2016
Thank you for your attention