AEP ONCOR TNMP CenterPoint

Slides:



Advertisements
Similar presentations
RETAIL METERING WORKING GROUP Process for Performing VEE for AMS June 3, 2009.
Advertisements

International Alert Users Association Conference November 10-12, 2011 Jeffrey Knoepke Preventive Maintenance System.
Retail Market Guide Updates.  ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their.
AMS DATA WORKSHOP III TDSP UPDATE September 19,
For AMS Interim Solution. This presentation is not intended to pressure any other TDSPs to pursue the same file processing timing and estimation routines.
Donny Helm Director – Technology Strategy and Architecture Oncor Electric Delivery November 1, 2012 The Challenges of Establishing A Common AMS View In.
Smart Metering in ERCOT: Implementation Update CCET Board of Directors Meeting August 3, 2011 Presented by Christine Wright, Competitive Markets Division.
SMART METER TEXAS Status Update July 29, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
1 ERCOT Load Research Update PWG August 24, 2005.
1 AMS Data Workshop ERCOT Overview of AMS Data Processes June 27, 2014 ERCOT June 27, 2014.
Retail Market Subcommittee (RMS) Update Kathy Scott January 3, 2013Technical Advisory Committee 1.
SMART METER TEXAS Status Update June 3, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
814_20 – Substation ID updates Background and Proposed Action Plan TX SET – 10/25/07.
RMSUpdate January 6, 2005 Retail Market Subcommittee Update to TAC.
Advanced Metering Implementation Team Update Christine Wright Public Utility Commission of Texas October 2008.
MARS Taskforce COPS Update May 12, Execution MilestonesBaseline DateStatus Technical Architecture Complete 05/15/2009On Schedule Development Complete07/24/2009On.
Market Impact Assessment TF Final Report to RMS June 11, 2008.
LRS Update Meeting LRS Participants and Profiling Working Group October 27, 2005.
Advanced Meter Settlement Background and NPRR. Overview PUC Rule (wholesale settlement) Project – Wholesale Settlement Project Filed Deployment.
Retail Market Subcommittee Update to TAC Kathy Scott February 27,
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
0 The Basics –There are 4 POLR customer classes: Residential, Small Non-Res. (
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
March 25, 2015 TDSP AMSR Cycle Read Analysis AMWG Meeting.
1 PWG Update Report By Ed Echols Of Oncor ERCOT PWG Chair Jim Lee of Direct Energy ERCOT PWG Vice Chair for COPS Meeting Sept 10, 2014.
ESI IDs Retired in Error! RMS – August 10, 2005 Discussion.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
Load Profiling Working Group RMS Presentation 8/01/2002 by Ernie Podraza Reliant Energy Retail Group Chair PWG.
Retail Market Subcommittee Update to COPS Kathy Scott March 17,
MARS 867_03F ROR vs. Settlement vs. 810 Scenarios ERCOT September 2008.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Profiling Working Group October 16, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting October 16, 2003.
MARS Advanced Metering – ERCOT Market Facing Changes Jackie Ashbaugh Manager Data Integrity and Administration 3/9/2009.
MARS Taskforce RMS Update November 10, Conference Call concerning Settlement Estimates TDSPs held a conference call on October 28, 2010, where we:
1 Transaction or Issue Clean Up. 2 Customer Protection and 814_08 Issue (Phase 2 – Potentially Late 08s) Background Completed Items Next Steps.
814_20 – Substation ID updates Background and Proposed Action Plan RMS – 11/07/07.
1 CenterPoint Energy Response RMS Update January 14, 2008 CenterPoint Energy’s Update on Usage & Invoices Backlog.
1 Supporting materials for RMS Provided by Retail Customer Choice (RCC) team.
Texas Competitive Market & Governance October 4, 2015.
Retail Market Subcommittee (RMS) Update Kathy Scott April 9, 2013Commercial Operations Subcommittee 1.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
1 TX SET Mass Transition Project RMS Update March 15, 2006.
3 rd Party Registration & Account Management SMT Update To AMWG APR, 2015.
Update to RMS June 3, Project(PR) 010_03 SCR756 Part B High Level Timeline  Planning Phase - complete  Execution/Development - complete  Testing.
MARS Taskforce COPS Update August 10, Definitions AMC – AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP AMDG – 15 Minute.
1DRAFT for DISCUSSION Transition From Non-IDR to IDR Load Profile and LSE 15-minute Data for AMS Market Advanced Readings and Settlements Taskforce 10/9/09.
AEP ONCOR TNMP TDSP AMS Data Practices Summary TDSP_AMS Data Practices Summary.ppt CenterPoint.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
1 Commercial Operations Sub-Committee Update to RMS November 10, 2005.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
1.  What is the purpose of DEVs? Data Extract Variances (DEVs) are used to synchronize the data among all Market Participants (MP)  What is a DEV? It's.
3 rd Party Registration & Account Management SMT Update To AMWG MAY, 2015.
November 17, 2014 ERCOT AMS Data Loading Result Code Descriptions & Distribution AMS Workshop IV.
1 Transaction or Issue Clean Up. 2 Customer Protection and 814_08 Issue (Phase 2 – Potentially Late 08s) Background Completed Items Next Steps.
ERCOT MARKET EDUCATION
Mass Transition of TDSP ESI IDs from Sharyland Utilities to Oncor
Nodal COMS Additional Items Update
Smart Meter Texas TDSP Master sync fileS
Settlement Timeline Workshop
Profiling Working Group
Mass Transition of TDSP ESI IDs from Sharyland Utilities to Oncor
2016 Annual Validation Update PWG
June 7, 2016 Retail Market Subcommittee Update to COPS
MARS Taskforce RMS Update December 9, 2009.
Pro-Active Transaction Resolution Measures
2017 Annual Validation Update PWG
SMT Historical Usage Reporting Functionality Backfill Requests Interim Solution Instructions Version 6 Dated March 17, 2014.
Usage Billing Issues.
March 1, 2016 Retail Market Subcommittee Update to TAC
Presentation transcript:

AEP ONCOR TNMP CenterPoint TDSP AMS Data Practices Summary AEP ONCOR TNMP CenterPoint TDSP AMS Data Practices Summary_20160601.pptx

AMS Data Facts 1 All TDSPs are providing a complete set of 96 interval values for each usage day. 2 TDSPs are required to provide ERCOT with Settlement Quality Meter Data via the UBP standard for Validation, Editing, and Estimating (VEE). 3 TDSPs trigger estimation processes due to missing interval values or if the interval value does not pass VEE. 4 TDSPs will replace an Estimated interval value with an Actual interval value if an Actual value is available. 5 Zero is a valid consumption interval value. All TDSPs allow and provide zeros as a valid interval value. 6 Policies – MVI, MVO, Smoothing, Cancel/Rebill, Tampering, IGL, REP of Record Changes TDSP AMS Data Practices Summary_20160601.pptx

AMS Data Facts 1 1 All TDSPs are providing complete 96 interval values All TDSPs are providing a complete set of 96 interval values for each usage day. 2 TDSPs are required to provide ERCOT with Settlement Quality Meter Data via the UBP standard for Validation, Editing, and Estimating (VEE). 3 TDSPs trigger estimation processes due to missing interval values or if the interval value does not pass VEE. 4 TDSPs will replace an Estimated interval value with an Actual interval value if an Actual value is available. 5 Zero is a valid consumption interval value. All TDSPs allow and provide zeros as a valid interval value. 6 Policies – MVI, MVO, Smoothing, Cancel/Rebill, Tampering, IGL, REP of Record Changes TDSP AMS Data Practices Summary_20160601.pptx

ERCOT Nodal Protocols: 10.11.3 TSP or DSP Settlement Meters The TSP and DSP shall provide ERCOT with Settlement Quality Meter Data for the TSP or DSP Settlement Meters on its system and shall ensure that at a minimum the VEE requirements as specified in the Uniform Business Practices (UBP) standard for Validating, Editing, and Estimating have been properly performed on such data. ERCOT shall not perform any VEE on the Settlement Quality Meter Data it receives from TSP or DSP. The following UBP manual validation processes are exempt for Interval Data: (a) Spike Check; and (b) Reactive channel check for kWh data. TDSP AMS Data Practices Summary_20160601.pptx

AMS Data Facts 1 All TDSPs are providing a complete set of 96 interval values for each usage day. 2 TDSPs are required to provide ERCOT with Settlement Quality Meter Data via the UBP standard for Validation, Editing, and Estimating (VEE). 3 TDSPs trigger estimation processes due to missing interval values or if the interval value does not pass VEE. 4 TDSPs will replace an Estimated interval value with an Actual interval value if an Actual value is available. 5 Zero is a valid consumption interval value. All TDSPs allow and provide zeros as a valid interval value. 6 Policies – MVI, MVO, Smoothing, Cancel/Rebill, Tampering, IGL, REP of Record Changes TDSP AMS Data Practices Summary_20160601.pptx

AEP CenterPoint ONCOR TNMP TNMP TDSP’s Estimation routine is explained in more detail within the “TDSP AMS Data Practices Matrix” 2(f): AEP Interval Gap Fill – used for missing intervals within a day. Full Cut Estimation – used when all intervals are missing for the day. (See Matrix 2f) CenterPoint ONCOR TNMP TNMP Linear Interpolation – used for missing intervals totaling less than 1 hr. Two-week like-day historical Estimation (See Matrix 2f) See Matrix 2(f) CNP’s detailed estimation process is outlined at the end of the Matrix. See Matrix 2(f) Oncor’s detailed estimation process is outlined at the end of the Matrix. TDSP AMS Data Practices Summary_20160601.pptx

AMS Data Facts 1 All TDSPs are providing a complete set of 96 interval values for each usage day. 2 TDSPs are required to provide ERCOT with Settlement Quality Meter Data via the UBP standard for Validation, Editing, and Estimating (VEE). 3 TDSPs trigger estimation processes due to missing interval values or if the interval value does not pass VEE. 4 TDSPs will replace an Estimated interval value with an Actual interval value if an Actual value is available. 5 Zero is a valid consumption interval value. All TDSPs allow and provide zeros as a valid interval value. 6 Policies – MVI, MVO, Smoothing, Cancel/Rebill, Tampering, IGL, REP of Record Changes TDSP AMS Data Practices Summary_20160601.pptx

AEP CenterPoint ONCOR TNMP TNMP 4) TDSP Missing Interval Value Retrieval Processes AEP CenterPoint ONCOR TNMP TNMP If an actual is received within 270 days from the read date, TNMP will replace the estimate with an actual read. If updates are received, a new date/time stamped LSE files will be posted. AEP will continue to attempt to retrieve missing interval data for 5 days through an automated process. If updates are received, a new date/time stamped LSE files will be posted. CNP will continue to attempt to retrieve missing interval data for 5 days through an automated process. If updates are received, a new date/time stamped LSE files will be posted. Oncor will continue to attempt to retrieve missing interval data for 4 days through an automated process. If updates are received, a new date/time stamped LSE files will be posted. TDSP AMS Data Practices Summary_20160601.pptx

AMS Data Facts 4 1 2 3 5 Policies – MVI, MVO, Smoothing, Cancel/Rebill, Tampering, IGL, REP of Record Changes All TDSPs are providing a complete set of 96 interval values for each usage day. TDSPs are required to provide ERCOT with Settlement Quality Meter Data via the UBP standard for Validation, Editing, and Estimating (VEE). TDSPs trigger estimation processes due to missing interval values or if the interval value does not pass VEE. TDSPs will replace an Estimated interval value with an Actual interval value if an Actual value is available. Zero is a valid consumption interval value. All TDSPs allow and provide zeros as a valid interval value. 6 TDSP AMS Data Practices Summary_20160601.pptx

AEP CenterPoint ONCOR TNMP 3) Zero is a valid value for both Estimates and Actuals. Zero Actuals are rendered when received on an Active Premise Zero Estimates are rendered for premises with known outages or premise’s load has been disconnected. AEP Not performing zero validations at this time. CenterPoint ONCOR Performs data analysis checks for zero consumption after DNP or MVOs and initiates additional review where deemed appropriate. TNMP For CNP internal reporting only: Consecutive zero validation will flag intervals with a failure code and/or will flag ESID on a Validation Failure Report. TDSP AMS Data Practices Summary_20160601.pptx

AMS Data Facts 1 All TDSPs are providing a complete set of 96 interval values for each usage day. 2 TDSPs are required to provide ERCOT with Settlement Quality Meter Data via the UBP standard for Validation, Editing, and Estimating (VEE). 3 TDSPs trigger estimation processes due to missing interval values or if the interval value does not pass VEE. 4 6 4 TDSPs will replace an Estimated interval value with an Actual interval value if an Actual value is available. 5 Zero is a valid consumption interval value. All TDSPs allow and provide zeros as a valid interval value. Policies – MVI, MVO, Smoothing, Cancel/Rebill, Tampering, Inadvertent Gain Scenarios, REP of Record Changes TDSP AMS Data Practices Summary_20160601.pptx

For additional detail, please reference the TDSP AMS Data Matrix: TDSP AMS Data Practices Summary_20160601.pptx