EUDET Elec/DAQ meeting

Slides:



Advertisements
Similar presentations
Julie Prast, DHCAL Meeting, 24 janvier 2008 La carte DIF pour DHCAL (proto au m 2 et au m 3 ) Sebastien Cap, Julie Prast ( LAPP) Christophe Combaret (IPNL)
Advertisements

Contrib passées & à venir du LLR (pour toi, à modifier)‏ VFE DAQ sur EUDET ( ): [C. Jauffret, V. Boudry] test du HardROC.
Vincent Boudry Franck Gastaldi Antoine Matthieu David Decotigny CALICE meeting 19 feb Kyungpook Nat'l U., Daegu, Korea Status of the Data Concentrator.
1 Overview of DAQ system DAQ PC LDA ODR Detector Unit DIF CCC Detector Unit DIF Detector Unit DIF Detector Unit DIF Storage Control PC (DOOCS) DAQ PC ODR.
Update on the Data Acquisition System development in the UK Valeria Bartsch, on behalf of CALICE-UK Collaboration.
Micromegas for a DHCAL LAPP, Annecy Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise Espagilière.
Taikan Suehara, AIDA-2020 kickoff meeting, 3 Jun page 1 Requirements from CALICE-DAQ for WP5 Taikan Suehara (Kyushu University, Japan)
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
Monday, June TIPP Amsterdam1 A scalable gigabit data acquisition system for calorimeters for linear collider GASTALDI Franck Grant ANR
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
C. Combaret TILC april m2 GRPC Acquisition System C. Combaret, IPN Lyon For the EU DHCAL collaboration
CALICE: status of a data acquisition system for the ILC calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz.
Bart Hommels Univeristy of Cambridge EUDET Annual Meeting, Ecole Polytechnique, Paris JRA3: DAQ Overview Objectives System Overview Status of.
JRA3 DAQ Overview Matt Warren, on behalf of EUDET JRA3 DAQ Groups. Please see the following talks from the JRA3 Parallel Session for more detail: DAQ and.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
C. Combaret DIF_GDIF_MDIF_D ASU 6x 24 HR2 ASU USB Hub RPi USB2 DCC SDCC RPi USB 1 hub+Rpi for 4 cassettes 1 DCC for 8 cassettes (1 spare) Trigger.
C. Combaret 11/10/ 2008 Status of the DHCAL m2 software C. Combaret IPNL.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
11-13th Sept 2007 Calice 1 LDA Protoype Board A Xilinx Spartan board. Will be the basis of a prototype LDA using additional IO boards to interface.
Vincent Boudry LLR, École polytechnique CALICE Collaboration meeting U. of Manchester 08/09/2008 Pre-results for the CERN PS tests of the eDHCAL.
Monday December DESY1 GDCC news Franck GASTALDI.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
Maurice Goodrick, Bart Hommels EUDET Annual Meeting, Ecole Polytechnique, Paris EUDET DAQ and DIF DAQ overview DIF requirements and functionality.
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
1 On- and near-detector DAQ work for the EUDET calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Maurice Goodrick, Bart Hommels CALICE-UK Meeting, Cambridge CALICE DAQ Developments DAQ overview DIF functionality and implementation EUDET.
14th january 2010 Actual Micromegas USB DAQ ASU and DIF
HaRDROC performance IN2P3/LAL+IPNL+LLR R. GAGLIONE, I. LAKTINEH, H. MATHEZ IN2P3/IPNL LYON M. BOUCHEL, J. FLEURY, C. de LA TAILLE, G. MARTIN-CHASSARD,
12/09/2007Julie Prast, LAPP, Annecy1 The DIF Task Force and a focus on the DHCAL DIF Remi Cornat, Bart Hommels, Mathias Reinecke, Julie Prast.
Status of DCC CALICE WEEK University of Manchester September 9, 2008 Franck LLR Polytechnique.
Bart Hommels for the DIF WG Electronics/DAQ for EUDET, DESY DIF status AHCAL, DHCAL, ECAL DIF prototypes Ongoing developments & plans.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
Vincent Boudry Franck Gastaldi Antoine Matthieu David Decotigny CALICE meeting 19 feb Kyungpook Nat'l U., Daegu, Korea.
Vincent Boudry, Rémi Cornat, Franck Gastaldi, Nicolas Roche, Muriel Cerutti LLR, École polytechnique–CNRS/IN2P3 Guillaume Vouters LAPP, U. de Savoie–CNRS/IN2P3.
Proto micromegas au LAPP 14 november 2008The DHCAL Board for the m2 and m3 prototype1 ASU DIF Inter DIF terminaison FPC USB Test Vendredi dernier….
Maurice Goodrick, Bart Hommels CALICE DAQ, UCL DIF & intermediate board Intermediate board: Power distribution (& pulsing?!)‏ Clock fanout Level.
DHCAL Acquisition with HaRDROC VFE Vincent Boudry LLR – École polytechnique.
Vincent Boudry, Ch. de la Taille LLR, École polytechnique LAL, Orsay EUDET Annual meeting DESY, 29/09/2010 CALICE DAQv2.
Vincent Boudry Matthew Wing EUDET Final Annual meeting DESY, 30/09/2010 JRA3 DAQ Task Status report.
EUDET France – 05/04/07 – Rémi CORNAT (LPC) 1 CALICE instrumental chain looking (not so) forward to EUDET Overview Wafer characterization Sensor test In.
14.4. Readout systems for innovative calorimeters
Toward a DAQ for the DHCAL m³ (in Test Beams)
DIF – LDA Command Interface
CALICE DAQ Developments
Status of the ODR and System Integration 31 March 2009 Matt Warren Valeria Bartsch, Veronique Boisvert, Maurice Goodrick, Barry Green, Bart Hommels,
ASU board: PCB production and testings
Integration of CALICE DAQ in common DAQ
Current DCC Design LED Board
Wing-LDA Timing & performance Beam Interface (BIF)
AIDA DAQ needs (and other issues)
Comments on the DAQv2 advancement
Status of the DHCAL DIF Detector InterFace Board
Test Slab Status CALICE ECAL test slab: what is it all about?
DAQ status and plans DAQ Hardware Moving stage (MIP calibration)
Status of the Data Concentrator Card and the rest of the DAQ
10/month is the present production rate 2 FTE + sporadic contributions
C. de La Taille IN2P3/LAL Orsay
Valeria Bartsch UCL David Decotigny LLR Tao Wu RHUL
CALICE/EUDET Electronics in 2007
The DHCAL DIF Board For the M2 Prototype
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
UK ECAL Hardware Status
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
Status of the EUDET Prototype
State of developments on Readout interface of European DHCAL
Presentation transcript:

EUDET Elec/DAQ meeting Status of the Data Concentrator Card (and other electronics for the DHCAL) Vincent Boudry Franck Gastaldi Antoine Matthieu EUDET Elec/DAQ meeting 12 dec. 2008 DESY

DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008 CERN PS TB November 08 Support is being realized CIEMAT Vincent.Boudry@in2p3.fr DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008

The 1 m2 electronics (quick status) Julie Prast & Guillaume Vouters DIF 10-layer board (6 for signals) designed and prototype produced FirmWare & SoftWare operationnal and tested in beam (with 4 HR µMegas card) USB HDMI ASUs RPC: 50×33.3 cm² (24 HR) boards produced μMeGas 32×8 cm² 4 HR produced HR1 ASICs used μMeGas Test board Software Acquisition software based on USB/XDAQ developed “RPC” ASU Ch. Combaret μMeGas + 4 HR ASU + DIF TB data available ⇒ not yet analysed V. Boudry DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008

DAQ2 EUDET pour le sDGHCAL DIFs (×120) ASUs DAQ2 PC DCC Clock & Control Digital (Config, Control, Data) Clock & Sync LDA ODR ×10 ⋮×9 Optique GigE Debug USB ×40 : ×14 : Machine clock DCC being developped at LLR 120 DIF → 12 LDA → 4 ODR Gain for DCC ≤ 1600€ 120 DIF → 14 DCC → 2 LDA → 1 ODR V. Boudry DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008

DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008 Carte DCC Goals Transparency on the path DIF-LDA Optimization of flux Low cost Pre-proto (proto-0) 4 DIFs connections Implantation et tests du code VHDL Based on a XILINX evaluation board: 128 Mbits SDRAM Daughter board: HDMI connecteurs USB blocs Développements: Marc Kelly (U. Man) : blocs Ser-Des, coding 8b/10b USB blocs (Clément Jauffret) Original VHDL blocs: Mémory controller, commands, buffers (FIFO),…..) V. Boudry DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008

DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008 Daughter board DIF Side LVDS Signals (TX & RX) USB part LDA Side MEMORY V. Boudry DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008

DCC prototype data flux Modified from Matthias DCC Memory FPGA LDA DIF (×9) V. Boudry DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008

DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008 DCC Proto-1 VME 6U VME 6U 16×1 MB ZBT (no latency BUS RAM) Spartan 3 (1500 K gate) Cost est.: 5 protos: ~ 800€/card 20 prods: ~450€/card (Components: ~230€/card) FTDI Est: 1.2A 10mA 400mA 2.25A 30mA V. Boudry DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008

DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008 Planning DCC January 09: Finalisation Schematic et routing PCB DCC January- April 09 Fabrication of prototype Test bench mounting Validation & integration of VHDL blocs Mai – June 09 (estimation) Production of boards for the m³ Boucling DCC-DIF / DCC-LDA Connection with the DIF (code on DIF: started) V. Boudry DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008

Test bench & DAQ integration LDA: Components: 1 Proto-DIF ✔, Integration code LDA-DIF on going 1 LDA (✔? fin déc), 1 CCC ✔? 1 ODR + 1 PC DAQ ✔ 1 proto DCC (mars ?) ou proto-0 DAQ Code: DOOCS Mars 09 →Jun 09 Intégration for a m³ Config Database (calib) Slow Control Event Display Raw online analysis CCC: ODR + PC V. Boudry DCC (and other DHCAL electronics) status — DESY, 12 dec. 2008