Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Mariusz Sapinski BI/BL Acknowledgements: 1 Planning of quench tests - LMC158 Draft planning of beam induced quench tests at the end of 2013 run LHC Machine.
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
G. Trad on the behalf of the BSRT team LHC BI 2015 summary 13/11/2015.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
BI MD# BSRT Measurements Beam 1 and 3.5 TeV 2 bunches with different emittances Bumps: -4, -2,0,2,4 mm Results: 3.5TeV.
MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre.
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
LHC Wire Scanner Calibration
The TV Beam Observation system - BTV
Beam Gas Imaging Kick-off meeting 30-Oct-2012
Beam Energy & Intensity: One bunch during full cycle
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
MD2243: Coronagraph commissioning at 6.5 TeV
Status of Interlock BPM
AWAKE proposals for BE/BI
MD2036: UFO dynamics studies and UFO fast detection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Emittance Measurements and Preservation
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Thursday morning – optics correction
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 24th January - morning
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Lost at 12:05 to power converter (RTQX2.R1) problem
LHC Morning Meeting - G. Arduini
Friday 14th December - morning
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Wire almost entirely through beam before BLM triggers dump
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Summary Thursday h21: Stable beams fill #1303.
Monday 24 October hours of 25ns MD
Machine plans - CMS startup workshop
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
90m "proper" VdM scans in the 90m/10m optics
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Another Immortal Fill….
Thursday Morning/Afternoon
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Measurement of the beam (transverse) emittances
Monday 152 bunch operation summary
Presentation transcript:

Beam instrumentation MDs T. Lefevre on the behalf of the BI group LSWG 2 September 2014

Outline Review of BI MD activities during Run 1 BI MD requests for Run 2 Conclusions LSWG 2 September 2014

Beam Instrumentation MDs What is done in MDs is what cannot be done parasitically during normal beam operation and initial beam commissioning Special beam conditions e.g. larger beam emittance using ADT blow-up or different bunch length Local Orbit bumps or K-modulation e.g. for cross-calibration of beam profile monitors, BPM or FBCT studies Intensity scan (scraping) e.g. for BPM or FBCT sensitivity ranges study RF frequency change e.g. for strip-line BPM directivity study in LSSs LSWG 2 September 2014

Beam Instrumentation MDs During each MDs period – 8h BI Shift 4-5 different activities per shift Some in parallel whenever applicable Usual suspects BCT, BPM, BSRT, BGI, BWS and Schottky Typical MDs: First part with beam tests at injection Ramp and beam tests at flat-top LSWG 2 September 2014

Beam Instrumentation MDs Study the performances & limitations of operational devices Understand / Solve issues that arises during Beam Operation e.g. BSRT Extraction Mirror heating or FBCT beam position dependency Study the impact of known limitation e.g. non-linearity corrections of BPM readings, Test and develop new or modified instruments Develop devices not yet operational e.g. Schottky, LDM, dI/dt, .. Test hardware modifications e.g. BSRT gated cameras, LDM optimisation Test firmware modifications e.g. Modified Interlock BPM firmware Commission new Instruments e.g. Matching Monitors LSWG 2 September 2014

Results from BI MD - Run1 BSRT / WS calibration Calibration BSRT - WS Injected 12 bunches per beam with emittance as small as possible Use ADT to blow-up single bunches Different ADT strength, excitation time on different bunches  circulating bunches with emittance spread in the 1.5 – 5 um range Measure with WS and BSRT Calculate BSRT magnification and point spread function to match WS Emittances after calibration LSWG 2 September 2014

Results from BI MD - Run1 Matching Monitor Preliminary Results Inject, circulate for 1000 turns max and dump a single bunch with about 1e10p Insert the BTVM.6L4.B1 screen and observe the monitor response turn by turns Repeat the experiment while inserting at the same time the BTVM.7L3.B1 screen to characterize any blow-up induced by scattering on the screens themselves Remove BTVM.7L3.B1 and repeat inject and dump several times, while smoothly increasing the bunch intensity up to 5e10p. With low intensity, offset injection trajectory to see the effect on the matching measurements (if time allows) I=4.48e10 I=2.23e10 I=4.5e9 LSWG 2 September 2014

Results from BI MD - Run1 BGI – B2 Injected 1368 nominal bunches Set local gas pressure to 5.2e-9 Study H and V camera tilt vs beam axis Calibration with local orbit bumps +- 1mm Used ADT to blow-up 144b batches  Monitor with BGI avg blow-up LSWG 2 September 2014

BI situation after LS1 Modified Instruments during LS1 All of them .. Some more than other … e.g. Schottky monitor or BSRT B1, .. Including both Hardware, Firmware, Software changes New Functionalities and New Instruments ICT and BCTW for fast beam intensity monitoring dI/dt (Fast Beam Current Change Monitor - FBCCM) Diode Orbit system for Collimator BPM and more.. Beam Transfer Function using Tune monitor Instability Monitoring system and trigger Beam Gas Vertex (BGV) detector BSRT interferometer LSWG 2 September 2014

Requests for Run 2 All what will not be completed during the beam commissioning period for operational BI systems … BLMs were not part of BI MDs – Done in MPP MDs Already known requests: Directional Strip-line BPMs in LSSs: comp between DOROS and WBTN Bunch intensity study scraping nominal bunches DOROS, Interlock BPM, dIdt, .. Bunch length dependency of ICT & BCTW Running the beam instable (nominal bunches) Commissioning of Instability Monitoring triggering system CO bumps - BPM (non-linearity correction) Sensitivity of beam position for ICT & BCTW, Schottky monitors Resolution study of BSRT and WS (at injection and flat top) LSWG 2 September 2014

Requests for Run 2 Already known requests continued dI/dt (FBCCM) commissioning plan with different beam intensities and energies done with TE-MPE-MS Emittance Blow-up using ADT Cross-calibration between BSRT & WS Test of new BSRT interferometer on B1 Investigating the possibility to cross-calibrate WS and BSRT using BTV in dump line Masking of BTV interlocks limited to safe beam? Can we extract and measure with BTV a nominal bunch at 6.5 TeV ? Commissioning of BGV Requiring gas injection In parallel to Van der Meer scans with SMOKE detector and BWS LSWG 2 September 2014

Conclusions During Run 1, BI MDs were extremely useful, at least for us, to better understand our devices Even if we assume a smooth re-commissioning of operational devices, we would already need several 8 hours shifts to assess the performance of new instruments using non-standard beam conditions Our proposal is to keep a minimum of one BI shift per MD period LSWG 2 September 2014

Thanks for listening LSWG 2 September 2014

Fringes ‘visibility’ contains information of proton beam size BSRT – Interferometry (B1) New project in collaboration with KEK (T.Mitshuashi), SLAC (A.Fisher), CELLS-ALBA (U.Iriso) Interferometry: non-diffraction limited method widely used in electron machines to measure very small beam sizes Fringes ‘visibility’ contains information of proton beam size F.Roncarolo & Co 28 Aug 2014

Closed Orbit Bumps +-4mm @ WS and BSRT Any new aperture and/or MPP constraint in 2015 to repeat bumps at injection and flat top? F.Roncarolo & Co 28 Aug 2014

WS-BSRT Commissioning Plan Overview Time Beam Type Energy [GeV] Monitors Comments 0.450 6.5 BSRT WS Parasitic Pilot ✔ ✖ Check SW (automatisms, auto-gain, auto-steering, etc…) 4hrs Single Bunches ✔ (2hrs) Closed Orbit Bumps 8hrs Calibration of WS PM gain + filters settings (4hrs) Cross-Calibration. 6 bunches with different emittances (ADT blow-up?) Interferometry tests, only B1 Scrubbing Temperature + mirror deformation monitoring, reliability runs Trains 8hrs? Pilot? Single Bunch? Inject circulate (ramp?) and dump, monitor beam size on BTVSE and BTVD (To be investigated) 8hrs ? Single bunch K-Modulation, AC dipole. Need knowledge of optics at monitors, all energies. TBD with OP and ABP N.B.: BSRT Interferometry can be done in parallel to imaging BSRT mirror deformation monitoring can NOT be done in parallel to imaging F.Roncarolo & Co 28 Aug 2014

BSRTM (mirror) deformation monitoring Shack-Hartmann mask When inserted (just after view port) excludes BSRA Deformation to be checked with low and high intensity Can we exclude BSRA during scrubbing and/or high intensity commissioning? Need MD time with high intensity and no BSRA (assuming MPP ok) ? F.Roncarolo & Co 28 Aug 2014

Wave front distortion measurements - Hartmann mask T. Mitsuhashi Very cheap Not sensible to floor vibrations Need the mask as close as possible to the mirror  normally is ‘destructive’, can’t split light to other devices before the mask mask-screen lever arm as long as possible 28 Aug 2014 F.Roncarolo & Co

BSRT Interferometry commissioning Slits out  test imaging Setup polarizer Find horizontal polarization only Check imaging resolution dependence on rectangular iris aperture Insert slit H Setup operational vertical aperture of rectangular iris Visibility vs slit separation Determine operational slit separation Repeat for V Test H and V measurements F.Roncarolo & Co 28 Aug 2014

Halo Monitoring via Sync light Studies for HighLumi Coronagraph? Flipping Micro-Mirrors ? Project just starting, nothing defined, not clear if any tests in 2015 F.Roncarolo & Co 28 Aug 2014