Appeal of PRS Rejection of NPRR 667

Slides:



Advertisements
Similar presentations
Future Ancillary Services (AS) Workshop
Advertisements

NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
Comverge Comments on NPRR555 ©2012 Comverge – Confidential and Proprietary Colin Meehan
1 Presentation to the Wisconsin Industrial Energy Group (WIEG) T. Graham Edwards President & CEO August 9, 2007.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Tiered Frequency Response Service Workshop On Demand-Response Programs in the ERCOT Market September 15, 2006 Mark W. Smith Smith Trostle LLP.
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Future Ancillary Services (NPRR 667) Update March 26, 2015 TAC meeting 1.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Reliability and Operations Subcommittee Report Presentation to the ERCOT Technical Advisory Committee January 6, 2005.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
Review of Proposed Zonal Market Improvements ERCOT Board of Directors Meeting February 17, 2009 Dan L. Jones Potomac Economics Vice President Director,
Overview of Revised Ancillary Services (AS) Framework Proposal
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
ERCOT Strategic Plan H.B. “Trip” Doggett President and Chief Executive Officer Technical Advisory Committee ERCOT Public December 3, 2013.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Reconfiguring Nodal Stakeholder Participation Presentation to the ERCOT Technical Advisory Committee Texas Nodal Transition Planning Task Force February.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
Long Term Study Transmission Results May 21 st, 2013.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Regional System Operator Issues Analysis Ron Lehr Western Clean Energy Advocates January 7, 2016.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
TAC Rejection of NPRR Mitigated Offer Caps for RMR Units
NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.
TEXAS NODAL (ERCOT REVISIONS)
RENEWABLES AND RELIABILITY
Wind Management at MISO
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
August 25, 2016 TAC Update to COPS
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Phase Angle Limitations
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
2011 Prioritization Update to Market Subcommittees
A Midsummer Night’s DREAM
Interpreting DREAM NPRR 777.
Overview of New Control Room Desk
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Modifications to Planning Charter
Massachusetts Electric Restructuring Roundtable
31st USAEE/IAEE North American Conference
30 Minute Reserves EPFSTF January 4,
White Paper – Least Cost Electricity Procurement
Sandip Sharma ERCOT Manager, Operations Planning
Update on Energy Imbalance Market
Solar Energy Commercialization
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Appeal of PRS Rejection of NPRR 667 Dan Woodfin Director, System Operations TAC May 26, 2016

Resource mix has changed Resource mix in ERCOT Market has changed significantly since current AS framework was developed This has changed both the need for AS and the capability of resources to provide the AS Gas-Steam 50% Coal 25% Gas-CT/CC 5% Nuclear 8% Cogen 11% Other 0.9% Renewables 0.008% 36.5% 14.8% 22.4% 13.8% 1.4% 5.7% 5.3% Late 1990s 2015 5/26/2015 TAC

Continued change in resource mix expected Significant additional changes to the resource mix are likely over the next 3 years With a 3-year implementation plan for NPRR 667, the drivers for restructuring the AS framework need to be addressed now 5/26/2015 TAC

Current AS framework needs improvement During high wind/low load periods, the current bundled AS framework will: Keep higher cost generation online to provide AS Extend and deepen negative price periods Curtail lower cost resources Result in increased AS prices and produce overall higher costs The frequency of high wind/low load periods is increasing 5/26/2015 TAC

Existing “Bundled” Ancillary Services Current AS Requirements designed around inherent capabilities of steam boiler units These requirements serve as barriers to entry for new resources that otherwise could meet underlying technical needs of the system Regulation Up Fast-Responding Regulation Up Regulation Down Fast-Responding Regulation Down 59.7 Hz, Must be able to sustain deployment Responsive Non-Spin Up to 30 minutes to deploy Must be dispatched by SCED 5/26/2015 TAC

Proposed Future Ancillary Services Current Proposed Regulation Up Fast-Responding Regulation Up Regulation Up Fast-Responding Regulation Up Mostly unchanged Regulation Down Fast-Responding Regulation Down Regulation Down Fast-Responding Regulation Down Fast Frequency Response 1 59.8 Hz, Limited duration Fast Frequency Response 2 59.7 Hz, Longer duration Responsive Primary Frequency Response Contingency Reserves 1 SCED-dispatched Contingency Reserves 2 Manually dispatched Non-Spin Supplemental Reserves 1 SCED-dispatched Supplemental Reserves 2 Manually dispatched Synchronous Inertial Response Ongoing development 5/26/2015 TAC

Nearly 3 Years of Stakeholder Input Spring 2016 Spring 2019 9/2013 11/2014 ERCOT Posts Future Ancillary Services White Paper Implementation PRS/TAC/Board Approval Additional stakeholder workshops and Cost/Benefit Study; revisions to NPRR based on Stakeholder input ~25 Stakeholder work sessions to gather input and improve proposal ERCOT Files NPRR 667, with significant modifications to original proposal based on stakeholder input 5/26/2015 TAC

Stakeholder input shaped the current proposal ERCOT’s original proposal modified significantly through stakeholder input Fundamental Services were changed Details of NPRR modified Current Original ERCOT Proposal Revised 667 Regulation Up Fast-Responding Regulation Up Regulation Up Fast-Responding Regulation Up Regulation Up Fast-Responding Regulation Up Regulation Down Fast-Responding Regulation Down Regulation Down Fast-Responding Regulation Down Regulation Down Fast-Responding Regulation Down Fast Frequency Response Fast Frequency Response 1 Fast Frequency Response 2 Responsive Primary Frequency Response Primary Frequency Response Contingency Reserves Contingency Reserves 1 Contingency Reserves 2 Non-Spin Supplemental Reserves 1 Supplemental Reserves 2 5/26/2015 TAC

Substitutability => liquidity Current Proposed Regulation Up Fast-Responding Regulation Up Regulation Up Fast-Responding Regulation Up Mostly unchanged Regulation Down Fast-Responding Regulation Down Regulation Down Fast-Responding Regulation Down Fast Frequency Response 1 59.8 Hz, Limited duration Fast Frequency Response 2 59.7 Hz, Longer duration Responsive Primary Frequency Response Contingency Reserves 1 SCED-dispatched Contingency Reserves 2 Manually dispatched Non-Spin Supplemental Reserves 1 SCED-dispatched Supplemental Reserves 2 Manually dispatched 5/26/2015 TAC

NPRR 667 supports TAC Goals for 2016 5. Develop and implement needed market design corrections and improvements which are cost effective. Brattle study found the NPRR had benefits much greater than costs (even after adjustment to lower gas prices) and was good market design. 6. Pursue the appropriate implementation of load participation NPRR provides several opportunities for increased load participation. 7. Pursue the appropriate implementation of emerging technologies. NPRR667 allows increased flexibility and efficiency in integrating new resources and facilitates their participation in the AS markets. 11. Collaborate with ERCOT Staff on the review of Ancillary Service needs and implement changes as necessary. ERCOT and stakeholders have worked together to refine NPRR667. 12. Maintain market rules that support open access to the ERCOT markets and transmission network. NPRR667 removes significant barriers to entry for diverse types of resources needed to reliably support the continually changing resource mix. 5/26/2015 TAC

ERCOT requests that TAC recommend approval of NPRR667, in order to: Appeal ERCOT requests that TAC recommend approval of NPRR667, in order to: Provide a holistic and efficient set of AS to meet the changing reliability challenges of the ERCOT System; Remove barriers to entry for new Resources that can meet the technical needs of the system; and Allow a coordinated transition to address future AS needs rather than addressing these needs through a piecemeal approach. 5/26/2015 TAC