Proposed capital expenditure Categories

Slides:



Advertisements
Similar presentations
Mountain Associates Reform of capital expenditure regulation Bruce Mountain Mountain Associates.
Advertisements

Regulation of network services Recent experience in the Australian National Electricity Market FSR Executive Seminar - 11 June Florence David Swift Executive.
The Australian Energy Regulator Public Forum April 29 Expenditure incentive guidelines Presentation on key issues.
Role of actuarial function supporting the FLAOR leading to the ORSA Ian Morris June 2014.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
The National Academies’ Board on Life Sciences Dr. Frances Sharples Director National Research Council National Research Council.
Practical Implications of Regulatory Convergence – Lessons from Basel II Mary Frances Monroe Division of Banking Supervision and Regulation Board of Governors.
An Overview of Our Regulatory Proposal
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
DEFRA 1 st IMPACT Workshop - 16/17 May 2002 How does this research fit within the UK? Dr Mervyn Bramley Flood Defence Development Manager, Environment.
ACCC Forum on Draft Statement of Principles for Transmission Regulation – New Investment Roman Domanski Executive Director Energy Users Association of.
MEC: Customer Profitability Models Topic DSM – DR, Advanced EE and Dispatch Ability Jesse Langston, OG&E Oct 20 th 2013.
DATE: 21 August 2012 Determining the Regulatory Asset Base Anthony Felet – Regulatory Finance Specialist 1.
Risk Management - ACostE Kate Boothroyd FIRM Director, KB Risk Consulting Limited.
1 The Asian Banker Summit 2004 Capital Management After Basel II Simon Topping Executive Director (Banking Policy) Hong Kong Monetary Authority 5 May 2004.
© Russell Kennedy Pty Ltd 2012 Accommodation Bonds: Use and Governance Requirements Rosemary Southgate Principal 20 June
February 2, 2011 Joe Yew City of Oakland California Debt and Investment Advisory Commission Debt 2: Accessing the Market Debt Policy and Plan of Finance.
Spectrum and Mobile Broadband Beyond Mobile Evolution in Australia G CDMA GSM AMPS First fully automatic mobile system Australian.
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
Presentation to the Chancellor’s Cabinet October 14, 2013 Inspiration. Innovation. Graduation. Presented by Mr. Roy Stutzman, RvStutzman Consulting.
IFRS Professor Wayne H. Shaw May 26, 2011 IFRS. Where were we last year? Summary of SEC Position.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
15 October 2013 Briefing on draft s 56G report on the effectiveness of information disclosure regulation at Christchurch Airport.
Briefing for financial market analysts 30 April 2013 Draft report on the effectiveness of information disclosure regulation at Auckland Airport.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Capex Regulation in Australian NEM NZ Commerce Commission workshop – March 2010.
Transition mechanisms Large Projects. Proposed capital expenditure Categories  Purpose of the session is to provide − a summary of the proposed transition.
Page 1 Own Solvency and Risk Assessment Jarl Kure Malta 9 April 2010.
Minor projects proposed approach.  Purpose of the session is to provide an overview of the proposed process for the review of Transpower’s minor projects.
Mitigation, Enhancement and Monitoring Session 9 Health in SEA.
Rural & Regional Water Business Expenditure Review Briefing for Businesses 4 October 2005.
Examples of capital expenditure models. Overview 2 Capex models developed and used by a number of regulators internationally Most commonly used as part.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
UNEP Training Resource ManualTopic 9 Slide 1 No EIA EIA Required *Public involvement Scoping Mitigation and impact management EIA Report Proposal Identification.
©Ofcom EU Communications package : State of Implementation Kip Meek, Senior Partner, Content & Competition Brussels, 30 May 2005.
Ofwat – Protecting consumers, promoting value and safeguarding the future Water and Regulation Improving the value from statistics Gordon Allan Engineering.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Quality Framework Proposal
Energy Regulation – NZCID Meeting Commerce Commission
DSC Change Committee UK Link Future Releases Proposed Approach
Strategic Information Systems Planning
Priorities for the Success AT Strategic Action Plan: SUMMARY
FINANCIAL AND FISCAL COMMISSION
Details of demand management options
Maintenance BC - NZTA assessment in TIO
EIA approval process, Management plan and Monitoring
Council Responses to Earthquake Prone Buildings – insights and update
Fair Go Rates System Dr Ron Ben-David Chairperson
2016 IPWEAvic Public Works Conference
Question and answer session
NERSA presentation at the PPC meeting held on 24 May 2006
Transition mechanisms Minor Projects
Gas default price-quality path reset 2017
OPG’s Views on Incentive Regulation and the Power Advisory LLC Report
Strategic Workforce Planning Chris MacRae
Large Projects proposed approach
Overview What we are trying to achieve in regulatory area
Forward Looking Cost Base
CEF Valuation Sub-Group Societal Valuation Programme Update
Fair Go Rates System Dr Ron Ben-David Chairperson
Operating Expenditure
INNOVATIONS TO ENHANCE CLIMATE ACTIONS AT SUB NATIONAL LEVEL
Regulated Health Professions Network Evaluation Framework
Workshop 1: PROJECT EVALUATION
Safety-net facility.
Transition year options
Fairtree Overview.
Good practices for risk assessment and control activities
18th September, 2018, BIEE Conference, Oxford Niall Kerr
Presentation transcript:

Proposed capital expenditure Categories

Proposed capital expenditure Categories Please note: The structure of the following sessions is firstly to present the position the Commission has proposed for the long term and secondly to consider any mechanisms required to manage the transition from the current position The proposed position is intended to form a basis for discussion The Commission is interested to hear views on the proposed approach Purpose of this session is to provide a summary of the proposed capital expenditure categories the rationale for the proposed materiality level for defining large projects

Developing the proposed approach When developing the proposed approach the Commission considered (amongst other things) The Part 4 Purpose Statement The GPS The regulatory approach taken in Australia The regulatory approach taken in the United Kingdom The approach taken under the Settlement Agreement between Transpower and the Commission Analysis of historical data on Transpower’s capex programmes Other reports, advice, submissions etc.

Governance and Management Engineering and technical The Commission’s focus is at the business case level for large projects and at the qualitative governance and management level for minor projects Service level obligations Governance and Management Policies, strategies and procedures that deliver services required at least cost Business management Assessment and approval of expenditure plans and variations Projects subject to an investment test commensurate with the size of project Supported by quantitative building block information provided at a level that demonstrates practical application of sound policies, strategies and procedures Top (by cost) project review and sampling of balance Ratios and base data Review of the application of policy and potential efficiency gains Expenditure plans Large Projects Minor Projects Asset management data (condition, age, network loadings and performance etc.) Engineering and technical Asset management planning and implementation

Trade offs Balance needed between the extent to which regulatory controls are applied and the flexibility Transpower requires to undertake its business The requirement to promote incentives to invest (Purpose Statement) and the required accountability for investments (2006 GPS) An appropriate level of regulatory scrutiny vs the effects of intrusion on the business The need for accuracy vs the need for flexibility The impact of controls on the business’s ability to be responsive] The intended positive outcomes of regulation vs the unintended downsides

Minor Projects - characteristics A high number of relatively small value individual projects Grid asset projects are principally replacement and refurbishment (RRE) with a small enhancement component Options likely to be limited for grid asset projects Information Systems Technology (IST) expenditure has a large development component Both RRE and IST projects can be structured in aggregated project groups/programmes A degree of flexibility required to optimise and prioritise minor projects during the RCP due to planning uncertainties Accuracy of planning and forecasting increases as projects complete process stages and gain Transpower approvals.

Large project characteristics Can be both RRE and IST projects High value require rigorous assessment and analysis Not all projects will be of a size that will require a full investment test Likely to be options to consider The range of values can be extremely large (e.g. millions to 100’s of millions) Planning accuracy is expected for large projects Unforeseen projects may arise during the RCP

Discussion

Proposed materiality level Large projects = $1.5 million and above Minor projects = below $1.5 million Aggregated project groups = $10 million in any one year with an individual total project limit of $1.5 million

Large project materiality level Settlement approach Enhancement projects have a materiality level of $1.5m Replacement and refurbishment projects do not have a limit Individual assessment of larger projects (approx 40 per year) and sampling of the balance

Large project materiality level Rationale for proposed level All projects require a level of testing and analysis commensurate to their size - the materiality level is considered to set the point at which the Commission applies individual project scrutiny The range and scale of Transpower’s projects does not negate the need for good testing and analysis of projects at the lower end (but still significant value) of the range Minor projects and programmes require different treatment to large projects due to planning accuracy and substitutability characteristics Including large projects in the minor project ‘bucket’ has the potential to reduce efficiency disciplines if large projects are deferred

Large project materiality level Key considerations are: Appropriate size (value) of project to require individual assessment The level at which an incentive for accurate planning at an individual project level is desirable Likelihood of multiple options for analysis Size of projects that are likely to be contingent The ability to group projects into programmes Number of projects that would be required to be assessed through a commensurate investment test

Discussion